MARION, TX ·
OSHA Inspection: SOUTHEAST POWER CORPORATION WESTERN
Unprogrammed Related inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Related safety inspection of SOUTHEAST POWER CORPORATION WESTERN in TOWER 130 NEAR 302 EAST KRUEGER STREET, MARION, TX 78124 (NAICS 221115). OSHA activity number 348569229.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- SOUTHEAST POWER CORPORATION WESTERN
- Site address
- TOWER 130 NEAR 302 EAST KRUEGER STREET
- City
- MARION
- State
- TX
- ZIP
- 78124
- Mailing
- 851 S DUNLAWTON AVE STE 302, PORT ORANGE, FL 32127
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 221115
- Employees
- 1
- Ownership type
- Private (A)
Citations
3 citations on file for this inspection.
1926.960 B01 I
- Issued
- Apr 23, 2026
- Abate by
- May 19, 2026
- Penalty
- Initial $11,585 · Current $11,585
General-duty citation text
29 CFR 1926.960(b)(1)(i): Unqualified employees worked on and/or with exposed energized lines and/or parts of equipment. On or about October 23, 2025, linemen were performing work on energized lines and/or parts of equipment without being qualified.
Recent events (2)
- · C (S) $11585
- · Z (S) $11585
1926.960 C01 I
- Issued
- Apr 23, 2026
- Abate by
- May 19, 2026
- Penalty
- Initial $11,585 · Current $11,585
General-duty citation text
29 CFR 1926.960(c)(1)(i): The employer did not establish minimum approach distances no less than the distances computed by Table V-2 for AC systems or Table V-7 for DC systems. On or about October 23, 2025, a lineman was performing work on energized lines and/or parts of equipment without the minimum approach distance being established.
Recent events (2)
- · C (S) $11585
- · Z (S) $11585
1926.960 C01 II
- Issued
- Apr 23, 2026
- Abate by
- May 19, 2026
- Penalty
- Initial $11,585 · Current $11,585
General-duty citation text
29 CFR 1926.960(c)(1)(ii): The employer did not determine the maximum anticipated per-unit transient overvoltage, phase-to-ground, through an engineering analysis or assume a maximum anticipated per-unit transient overvoltage, phase-to-ground, in accordance with Table V-8. On or about October 23, 2025, an engineering analysis was not performed prior to the beginning of work on or near energized powerlines.
Recent events (2)
- · C (S) $11585
- · Z (S) $11585
More inspections in this industry (NAICS 221115)
More inspections in TX
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 348569229.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.