Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: LJ REMODELING LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of LJ REMODELING LLC in 2914 33RD PL NW, WASHINGTON, DC 20008 (NAICS 236118). OSHA activity number 348614678.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch LJ Remodeling LLC — free Get an email when a new federal OSHA severe-injury report for LJ Remodeling LLC is published. One employer, no account, unsubscribe in one click.
Establishment
LJ REMODELING LLC
Site address
2914 33RD PL NW
City
WASHINGTON
State
DC
ZIP
20008
Mailing
7107 RIGGS ROAD, HYATTSVILLE, MD 20783
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
236118
Employees
5
Ownership type
A

7 citations on file for this inspection.

1926.102 A01

Serious Gravity 5 1 instance 2 exposed
Issued
Dec 29, 2025
Abate by
Jan 7, 2026
Penalty
Initial $3,015 · Current $2,000 Reduced
29 CFR  1926.102(a)(1):The employer did not ensure employees used eye and face protection equipment when machines or operations presented potential eye or face injury from physical, chemical, or radiation agents:  a) On or about November 25, 2025, at 2914 33rd PL NW, Washington DC; Deck area, during the installation of the deck, employees were using rigid pneumatic nail guns without wearing appropriate eye protection, such as safety goggles or face shields. This oversight exposed them to a significant risk of eye injuries, including potential punctures, lacerations, or other trauma from flying debris and misfired nails.   In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $2000
  • — Z (S) $3015

1926.304 H01

Serious Gravity 5 1 instance 1 exposed
Issued
Dec 29, 2025
Abate by
Jan 7, 2026
Penalty
Initial $2,412 · Current $2,000 Reduced
29 CFR  1926.304(h)(1):Each circular crosscut table saw was not guarded by a hood which completely enclosed that portion of the saw blade above the table and that portion of the saw above the material being cut:  a) On or about November 25, 2025, at 2914 33rd PL NW, Washington DC. Ground level eastside; During the installation of the deck and soffit, the employees were operating a Dewalt table saw without the safety guard in place. The lack of the guard puts them at significant risk of serious injury, including potential amputation hazards, as the exposed blade could easily cause severe accidents.   In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records
Recent events (2)
  • — I (S) $2000
  • — Z (S) $2412

1926.403 B01

Other-than-serious Gravity 1 1 instance 3 exposed
Issued
Dec 29, 2025
Abate by
Jan 7, 2026
Penalty
Initial $1,809 · Current $1,000 Reduced
29 CFR  1926.403(b)(1):Employer did not ensure that electrical equipment is free from recognized hazards that are likely to cause death or serious physical harm to employees:   a) On or about November 25, 2025, at 2914 33rd PL NW, Washington DC. Ground level eastside; The employees were using extension cords that were visibly damaged to power various equipment, including saws, which placed them at significant risk of electrical shock. The damaged sections of these cords revealed exposed internal wires, creating an unsafe working environment. Additionally, the power supply at the site was permanent and no ground faults circuit interrupters were used, further compounding the hazard as it connected directly to the compromised extension cords.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records
Recent events (2)
  • — I (O) $1000
  • — Z (S) $1809

1926.404 B01 II

Other-than-serious Gravity 1 1 instance 2 exposed
Issued
Dec 29, 2025
Abate by
Jan 7, 2026
Penalty
Initial $0 · Current $0
29 CFR  1926.404(b)(1)(ii):On a construction site, where an assured equipment grounding program was not utilized, all 120-volt, single-phase, 15 and 20 ampere receptacle outlets which were not a part of the permanent wiring of the building or structure and which are in use by employees did not have approved ground fault circuit interrupers for personal protection.  a) On or about November 25, 2025, at 2914 33rd PL NW, Washington DC. Ground level eastside; the extension cords utilized to power equipment at the site, such as saws, were not equipped with ground fault interrupters (GFCI) while connected to the building's permanent electrical source. The condition left the employees exposed to potentially severe electrical shock hazards.
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

1926.405 G02 IV

Other-than-serious Gravity 1 1 instance 3 exposed
Issued
Dec 29, 2025
Abate by
Jan 7, 2026
Penalty
Initial $0 · Current $0
29 CFR  1926.405(g)(2)(iv):Flexible cords were not connected to devices and fittings so that strain relief is provided to prevent pull from being directly transmitted to joints or terminal screws:  a) On or about November 25, 2025, at 2914 33rd PL NW, Washington DC. Ground level eastside; the cords strain relief components utilized to power the electrical equipment involved in the operation of saws have been compromised. This failure has led to the internal wiring becoming exposed, creating a significant safety hazard. The damaged strained relief placed the employees at risk of electrical shock when these tools are plugged into the building's permanent electrical supply.   In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

1926.501 B13

Serious Gravity 10 1 instance 2 exposed
Issued
Dec 29, 2025
Abate by
Jan 7, 2026
Penalty
Initial $4,220 · Current $2,000 Reduced
29 CFR  1926.501(b)(13):Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b):   a) On or about November 25, 2025, at 2914 33rd PL NW, Washington DC. eastside, Deck area, employees were exposed to the risk of falling from an estimated height of 25 feet while involved in the installation of both the deck and the railing without the use of fall protection  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $2000
  • — Z (S) $4220

1926.503 B01

Serious Gravity 1 1 instance 2 exposed
Issued
Dec 29, 2025
Abate by
Jan 7, 2026
Penalty
Initial $0 · Current $0
29 CFR  1926.503(b)(1):The employer did not verify fall protection training by preparing a written certification record.  a) On or about November 25, 2025, at 2914 33rd PL NW, Washington DC. eastside; Deck area; the employer had not certified the fall protection training to employees that may be exposed to fall hazards 6-feet while conducting framing work.  In accordance with 29 CFR 1903.19(d), abatement ce1tification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348614678.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.