LA MARQUE, TX —
OSHA Inspection: JOSE ANGEL NARVAEZ
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of JOSE ANGEL NARVAEZ in 14106 BAIKAL MANOR, LA MARQUE, TX 77568 (NAICS 327991). OSHA activity number 348629619.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- JOSE ANGEL NARVAEZ
- Site address
- 14106 BAIKAL MANOR
- City
- LA MARQUE
- State
- TX
- ZIP
- 77568
- Mailing
- 425 MARTIN ST TRAILER#9, HOUSTON, TX 77018
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 327991
- Employees
- 2
- Ownership type
- A
Citations
5 citations on file for this inspection.
1910.1200 E01
- Issued
- Jan 22, 2026
- Abate by
- Feb 18, 2026
- Penalty
- Initial $1,702 · Current $1,702
9000
General-duty citation text
29 CFR 1910.1200(e)(1): Employer had not developed or implemented a written hazard communication program that included the requirements outlined in 29 CFR 1910.1200(e)(1)(i) and (e)(1)(ii): a) On or about August 6, 2025, at a residential construction site, where a written hazard communication program was not established and implemented for employees working with crystalline silica while cutting countertops.
Recent events (1)
- — Z (S) $1702
1926.95 A
- Issued
- Jan 22, 2026
- Abate by
- Feb 18, 2026
- Penalty
- Initial $2,270 · Current $2,270
General-duty citation text
29 CFR 1926.95(a): Protective equipment, including personal protective equipment for eyes, face, head, and extremities, protective clothing, respiratory devices, and protective shields and barriers, were not provided: a) On or about August 6, 2025, at the residential construction site, where employees were not provided with eye protection when cutting Silestone countertops.
Recent events (1)
- — Z (S) $2270
1926.303 B01
- Issued
- Jan 22, 2026
- Abate by
- Feb 18, 2026
- Penalty
- Initial $2,270 · Current $2,270
General-duty citation text
29 CFR 1926.303(b)(1): Grinding machines were not equipped with safety guards in conformance with the requirements of ANSI B7.1-1970, Safety Code for the Use, Care, and Protection of abrasive wheels, and paragraph (d) of this section. a) On or about August 6, 2025, at a residential site, where an employee was cutting a Silestone countertop with a Makita angle grinder which was not guarded.
Recent events (1)
- — Z (S) $2270
1926.1153 C01
- Issued
- Jan 22, 2026
- Abate by
- Feb 18, 2026
- Penalty
- Initial $2,270 · Current $2,270
9000
General-duty citation text
29 CFR 1926.1153(c)(1): For each employee engaged in a task identified on Table 1, the employer did not fully and properly implement the engineering controls, work practices, and respiratory protection specified for the task on Table 1, unless the employer assesses and limits the exposure of the employee to respirable crystalline silica in accordance with paragraph (d) of this section. a) On or about August 6, 2025, outside of a residential construction site, where a Makita angle grinder was used to cut a Silestone countertop without using an integrated water delivery system or dust collection system.
Recent events (1)
- — Z (S) $2270
1926.1153 D02 I
- Issued
- Jan 22, 2026
- Abate by
- Feb 18, 2026
- Penalty
- Initial $0 · Current $0
9000
General-duty citation text
29 CFR 1926.1153(d)(2)(i):The employer did not assess the exposure of each employee who was or may reasonably be expected to be exposed to respirable crystalline silica at or above the action level in accordance with either the performance option in paragraph (d)(2)(ii) or the scheduled monitoring option in paragraph (d)(2)(iii) of this section: a) On or about August 6, 2025, outside of a residential construction site, where exposure to respirable crystalline silica was not evaluated for employees cutting and buffing a Silestone kitchen countertop with a Makita grinder when Table 1 was not fully and properly implemented.
Recent events (1)
- — Z (S) $0
More inspections at Jose Angel Narvaez
View Jose Angel Narvaez's full OSHA safety record →
More inspections in this industry (NAICS 327991)
More inspections in TX
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348629619.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.