CHICAGO, IL —
OSHA Inspection: LUIS LOPEZ DBA HQ CONSTRUCTION
Unprogrammed Related inspection · Health discipline
At a glance
On , OSHA opened an unprogrammed Related health inspection of LUIS LOPEZ DBA HQ CONSTRUCTION in 616 W. ARLINGTON PL 616 W. ARLINGTON PL, CHICAGO, IL 60614 (NAICS 236118). OSHA activity number 348674185.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- LUIS LOPEZ DBA HQ CONSTRUCTION
- Site address
- 616 W. ARLINGTON PL 616 W. ARLINGTON PL
- City
- CHICAGO
- State
- IL
- ZIP
- 60614
- Mailing
- 12741 S KENNETH AVE. UNIT A, ALSIP, IL 60803
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236118
- Employees
- 12
- Ownership type
- A
Citations
8 citations on file for this inspection.
1926.1101 F02
- Issued
- May 11, 2026
- Abate by
- Jun 12, 2026
- Penalty
- Initial $3,972 · Current $2,500 Reduced
General-duty citation text
29 CFR 1926.1101(f)(2): The employer who has a workplace or work operation covered by this standard did not ensure that a competent person conducts an exposure assessment immediately before or at the initiation of the operation to ascertain expected exposures during that operation or workplace: a) On or about December 3, 2025, Luis Lopez dba HQ Construction employees working at 616 W. Arlington Pl. Chicago, IL 60614, were performing Class II asbestos work. Employees were removing floor tile and mastic containing 12% chrysotile asbestos and Thermal System Insulation (TSI) containing 27.5% chrysotile asbestos. The employer did not ensure that a competent person conducted an exposure assessment immediately before or at the initiation of the removal of the flooring, mastic, and TSI. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $2500
- — Z (S) $3972
1926.1101 G04 I
- Issued
- May 11, 2026
- Abate by
- Jun 12, 2026
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1101(g)(4)(i): All Class I work, including the installation and operation of the control system, was not supervised by a competent person as defined in 29 CFR 1926.1101(b): a) On or about December 3, 2025, Luis Lopez dba HQ Construction employees working at 616 W. Arlington Pl. Chicago, IL 60614, were performing Class I asbestos work and were not supervised by a competent person. Employees were removing Thermal System Insulation (TSI) containing 27.5% chrysotile asbestos. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.1101 G07 I
- Issued
- May 11, 2026
- Abate by
- Jun 12, 2026
- Penalty
- Initial $0 · Current $0
9020
General-duty citation text
29 CFR 1926.1101(g)(7)(i): All Class II work was not supervised by a competent person as defined in 29 CFR 1926.1101(b): a) On or about December 3, 2025, Luis Lopez dba HQ Construction employees working at 616 W. Arlington Pl. Chicago, IL 60614, were performing Class II asbestos work and were not supervised by a competent person. Employees were removing floor tile and mastic containing 12% chrysotile asbestos. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.1101 G05
- Issued
- May 11, 2026
- Abate by
- Jun 12, 2026
- Penalty
- Initial $3,972 · Current $2,500 Reduced
General-duty citation text
29 CFR 1926.1101(g)(5): Class I asbestos work was not performed using one or more of the control methods required by 29 CFR 1926.1101(g)(5)(i) through (g)(5)(vi): a) On or about December 3, 2025, Luis Lopez dba HQ Construction did not ensure that Class I asbestos work was performed using wet methods, HEPA vacuums and that debris was promptly disposed of in leak-tight containers. Employees were removing Thermal System Insulation (TSI) containing 27.5% chrysotile asbestos at a worksite located at 616 W. Arlington Pl. Chicago, IL 60614. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $2500
- — Z (S) $3972
1926.1101 G07 IV
- Issued
- May 11, 2026
- Abate by
- Jun 12, 2026
- Penalty
- Initial $0 · Current $0
9020
General-duty citation text
29 CFR 1926.1101(g)(7)(iv): All Class II asbestos work was not performed using the work practices and requirements set out in 29 CFR 1926.1101(g)(1)(i) through (g)(1)(iii): a) On or about December 3, 2025, Luis Lopez dba HQ Construction did not ensure that Class II asbestos work was performed using wet methods, HEPA vacuums and that debris was promptly disposed of in leak-tight containers. Employees were removing tile flooring and mastic containing 12% chrysotile asbestos at a worksite located at 616 W. Arlington Pl. Chicago, IL 60614. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.1101 H01 I
- Issued
- May 11, 2026
- Abate by
- Jun 12, 2026
- Penalty
- Initial $3,972 · Current $2,500 Reduced
General-duty citation text
29 CFR 1926.1101(h)(1)(i): Respirators were not used during all Class I asbestos jobs: a) On or about December 3, 2025, employees at 616 W. Arlington Pl. Chicago, IL 60614, were performing Class I asbestos work. The employer did not ensure that employees used respirators when removing Thermal System Insulation (TSI) containing 27.5% chrysolite asbestos. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $2500
- — Z (S) $3972
1926.1101 H01 II
- Issued
- May 11, 2026
- Abate by
- Jun 12, 2026
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1101(h)(1)(ii):Respirators were not used during Class II work where asbestos containing material was not removed in a substantially intact state: a) On or about December 3, 2025, employees at 616 W. Arlington Pl. Chicago, IL 60614, were performing Class II asbestos work. Employees were removing tile flooring and mastic containing 12% chrysolite asbestos. The employer did not ensure that employees used respirators when removing asbestos tile flooring and mastic that was not removed in a substantially intact state. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.1101 K09 I
- Issued
- May 11, 2026
- Abate by
- Jun 12, 2026
- Penalty
- Initial $3,972 · Current $2,500 Reduced
9020
General-duty citation text
29 CFR 1926.1101(k)(9)(i): The employer did not institute, at no cost to employees, a training program for each employee who was likely to be exposed in excess of the permissible exposure limit (PEL) and for each employee who performed Class I through IV asbestos operations: a) On or about December 3, 2025, the employer did not institute a training program for employees conducting demolition activities likely to disturb asbestos containing material (Class I & II work) such as removing asbestos containing floor tile and disturbing Thermal System Insulation (TSI) at the worksite located at 616 W. Arlington Pl., Chicago IL 60614. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $2500
- — Z (S) $3972
More inspections at Luis Lopez DBA HQ Construction
View Luis Lopez DBA HQ Construction's full OSHA safety record →
More inspections in this industry (NAICS 236118)
More inspections in IL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348674185.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.