EAU CLAIRE, WI —
OSHA Inspection: DANIEL MILLER CONSTRUCTION
Unprogrammed Other inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Other safety inspection of DANIEL MILLER CONSTRUCTION in 4879 LYLE LANE, EAU CLAIRE, WI 54703 (NAICS 238130). OSHA activity number 348750738.
Where did this inspection happen?
- Establishment
- DANIEL MILLER CONSTRUCTION
- Site address
- 4879 LYLE LANE
- City
- EAU CLAIRE
- State
- WI
- ZIP
- 54703
- Mailing
- 1600 EAST MAIN ST., GILMAN, WI 54433
What kind of inspection was it?
- Inspection type
- Unprogrammed Other (I)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238130
- Employees
- 4
- Ownership type
- A
Citations
5 citations on file for this inspection.
1903.19 C01
- Issued
- Abate by
- Penalty
- Initial $319.00 · Current $319.00
General-duty citation text
29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated: (a) Citation 1, Item 1a; a serious violation of 29 CFR 1926.501(b)(1) with an abatement date of March 31, 2026. (b) Citation 1, Item 1b; a serious violation of 29 CFR 1926.503(a)(1) with an abatement date of March 31, 2026. (c) Citation 1, Item 1c; a serious violation of 29 CFR 1926.1051(a) with an abatement date of March 31, 2026.
Recent events (1)
- — Z (O) $319
1903.19 D01
- Issued
- Abate by
- Penalty
- Initial $319.00 · Current $319.00
General-duty citation text
29 CFR 1903.19(d)(1): The employer did not submit to the Agency documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required: (a) Citation 1, Item 1a; a serious violation of 29 CFR 1926.501(b)(1) with an abatement date of March 31, 2026. (b) Citation 1, Item 1b; a serious violation of 29 CFR 1926.503(a)(1) with an abatement date of March 31, 2026. (c) Citation 1, Item 1c; a serious violation of 29 CFR 1926.1051(a) with an abatement date of March 31, 2026.
Recent events (1)
- — Z (O) $319
1926.501 B01
- Issued
- Abate by
- Penalty
- Initial $3972.00 · Current $3972.00
General-duty citation text
29 CFR 1926.501(b)(1): Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems: (a) Under-construction ladder-frame pole building; On or about February 17, 2026, and dates prior, a means of fall protection was not provided during framing activities for employees who worked from wall top plates, roof trusses, girts, and purlins at approximate heights ranging between 16-feet to 25-feet above ground level.
Recent events (1)
- — Z (S) $3972
1926.503 A01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards: (a) Under-construction ladder-frame pole building; On or about February 17, 2026, and dates prior, employees performing framing activities were not provided with a training program to recognize fall hazards and the procedures to minimize them, while working at approximate heights ranging between 16 feet to 25 feet above ground level.
Recent events (1)
- — Z (S) $0
1926.1051 A
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.1051(a): Stairways or ladders were not provided at all personnel points of access where there was a break in elevation of 19 inches (48 cm) or more, and no ramp, runway, sloped embankment, or personnel hoist was provided: (a) Under-construction ladder-frame pole building; On or about February 17, 2026, and dates prior, employees were not provided with a safe means of access to elevated work areas and were required to climb horizontal wall girts and/or bracing members spaced approximately 24 to 30 inches on-center, with heights ranging between 16 feet (girts) to 22 feet (bracing) above ground level.
Recent events (1)
- — Z (S) $0
More inspections in this industry (NAICS 238130)
ENCINITAS, CA—2026-07-13
LOU RIDDLE CONSTRUCTION
MERIDIAN, ID—2026-07-10
IDAHO HOMES CONSTRUCTION LLC
KIMBERLY, WI—2026-07-10
ENRIQUE RESENDIC
METTER, GA—2026-07-10
M.A.P.C CONSTRUCTION, LLC
SLINGER, WI—2026-07-10
RAMIREZ HOME BUILDERS LLC
More inspections in WI
MUSCODA, WI—2026-07-10
SCOT INDUSTRIES, INC
FRANKLIN, WI—2026-07-10
EDGE BROADBAND SOLUTIONS LLC
APPLETON, WI—2026-07-10
LAWRENCE UNIVERSITY OF WISCONSIN
KIMBERLY, WI—2026-07-10
ENRIQUE RESENDIC
SLINGER, WI—2026-07-10
DYLAN MATTHEW SHELLEY LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348750738.