GADSDEN, AL —
OSHA Inspection: MK MASONRY LLC
Unprogrammed Related inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Related safety inspection of MK MASONRY LLC in 200 BROAD STREET, GADSDEN, AL 35901 (NAICS 238140). OSHA activity number 348780461.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- MK MASONRY LLC
- Site address
- 200 BROAD STREET
- City
- GADSDEN
- State
- AL
- ZIP
- 35901
- Mailing
- 5304 DEWEY HEIGHTS ROAD, PINSON, AL 35126
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 10
- Ownership type
- A
Citations
8 citations on file for this inspection.
1926.25 A
- Issued
- Mar 30, 2026
- Abate by
- Apr 23, 2026
- Penalty
- Initial $4,256 · Current $2,554 Reduced
General-duty citation text
29 CFR 1926.25(a): During the course of construction, alteration, or repairs, debris was not kept cleared from work areas, passageways, and stairs, in and around buildings or other structures: (a) On or about 1/6/2026, on the east side of the jobsite, employees had access under and around scaffold that was cluttered with material, such as scaffold parts, wooden boards, and metal pieces to perform masonry related activities. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $2553.6
- — Z (S) $4256
1926.451 G04 I
- Issued
- Mar 30, 2026
- Abate by
- Apr 23, 2026
- Penalty
- Initial $4,256 · Current $2,554 Reduced
General-duty citation text
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms before being released for use by employees other than erection/dismantling crews: (a) On or about 1/6/2026, on the east side of the jobsite, employees performed masonry work from a supported scaffold more than 10 feet above the ground on the exterior of the building, which lacked the required guardrails on all open sides. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $2553.6
- — Z (S) $4256
1926.451 H01
- Issued
- Mar 30, 2026
- Abate by
- Apr 23, 2026
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(h)(1): Each employee on a scaffold was not provided with additional protection from falling hand tools, debris, and other small objects through the installation of toeboards, screens, guardrail systems, or through the erection of debris nets, catch platforms, or canopy structures that contain or deflect the falling objects. For falling objects too large, heavy or massive to be contained or deflected, the employer did not place and secure such potential falling objects away from the edge of the surface from which they could fall: (a) On or about 1/6/2026, on the east side of the jobsite, employees utilized a supported scaffold to perform masonry-related activities on the exterior of the building that did not have equipment in place to protect employees from falling objects. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.452 C04
- Issued
- Mar 30, 2026
- Abate by
- Apr 23, 2026
- Penalty
- Initial $4,256 · Current $2,554 Reduced
General-duty citation text
29 CFR 1926.452(c)(4): End frames of tubular welded frame scaffolding were not locked together vertically by use of pins or equivalent means in areas where uplift could occur: (a) On or about 1/6/2026, on the east side of the jobsite, employees utilized a supported scaffold to perform masonry-related activities on the exterior of the building, and the uprights were not locked together vertically. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $2553.6
- — Z (S) $4256
1926.454 A
- Issued
- Mar 30, 2026
- Abate by
- May 14, 2026
- Penalty
- Initial $4,256 · Current $2,554 Reduced
General-duty citation text
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards: (a) On or about 1/6/2026, on the east side of the jobsite, employees utilized a supported scaffold to perform masonry-related activities on the exterior of the building without having been trained to recognize scaffold-associated hazards. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $2553.6
- — Z (S) $4256
1926.454 B
- Issued
- Mar 30, 2026
- Abate by
- May 14, 2026
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.454(b): The employer did not have each employee who was involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the work in question: (a) On or about 1/6/2026, on the east side of the jobsite, employees assembled a supported scaffold without being trained by a competent person to recognize scaffold safety hazards. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.701 B
- Issued
- Mar 30, 2026
- Abate by
- Apr 23, 2026
- Penalty
- Initial $4,256 · Current $2,554 Reduced
General-duty citation text
29 CFR 1926.701(b): All protruding reinforcing steel, onto and/or into which employees could fall, was not guarded to eliminate the hazard of impalement: (a) On or about 1/6/2026, on the east side of the jobsite, employees performed masonry-related activities under and around the supported scaffold, which had unguarded reinforcing steel in the walking path. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $2553.6
- — Z (S) $4256
1910.1200 E01
- Issued
- Mar 30, 2026
- Abate by
- May 14, 2026
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.1200(e)(1): Employer had not developed or implemented a written hazard communication program that included the requirements outlined in 29 CFR 1910.1200(e)(1)(i) and (e)(1)(ii): (a) On or about 1/6/2026, the employer did not develop and maintain a written hazard communication program, even though employees throughout the site worked with hazardous materials, which included, but were not limited to, Quikrete Masonry and Mortar Cement, and bricks. The chemical hazards included, but were not limited to, skin irritation, serious eye damage, and respiratory irritation.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections in this industry (NAICS 238140)
More inspections in AL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348780461.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.