Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: RS WELDING/CONSTRUCTION LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of RS WELDING/CONSTRUCTION LLC in S SONCY RD, AMARILLO, TX 79104 (NAICS 238120). OSHA activity number 348787615.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch RS Welding/Construction LLC — free Get an email when a new federal OSHA severe-injury report for RS Welding/Construction LLC is published. One employer, no account, unsubscribe in one click.
Site address
S SONCY RD
City
AMARILLO
State
TX
ZIP
79104
Mailing
710 COUNTY RD 289, OLTON, TX 79064
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
238120
Employees
7
Ownership type
A

2 citations on file for this inspection.

1926.453 B02 V

Serious Gravity 5 1 instance 3 exposed
Issued
Mar 20, 2026
Abate by
Apr 17, 2026
Penalty
Initial $2,894 · Current $2,894
29 CFR  1926.453(b)(2)(v): A body belt with lanyard attached to the boom or basket was not worn by employee(s) working from an aerial lift  On or about March 04, 2026, at the Western bank new construction, employees utilized a boom lift without the adequate fall protection while performing welding operations
Recent events (1)
  • — Z (S) $2894

1926.453 B02 IV

Serious Gravity 5 1 instance 3 exposed
Issued
Mar 20, 2026
Abate by
Apr 17, 2026
Penalty
Initial $2,894 · Current $2,894
29 CFR  1926.453(b)(2)(iv): Employee(s) working in an aerial lift were sitting or climbing on the edge of the basket:   On or about March 04, 2026, at the Western bank new construction site, employee(s) worked in boom lifts by climbing over and sitting on the railing while performing welding operations on metal framing.
Recent events (1)
  • — Z (S) $2894

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348787615.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.