OSHA Inspection: ADC GENERAL CONSTRUCTION, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of ADC GENERAL CONSTRUCTION, LLC in 1863 GETTYSBURG VILLAGE DRIVE 300 BLOCK OF BUILDINGS, OVER 310 AND 320, GETTYSBURG, PA 17325 (NAICS 238160). OSHA activity number 348806498.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch ADC General Construction, LLC — free Get an email when a new federal OSHA severe-injury report for ADC General Construction, LLC is published. One employer, no account, unsubscribe in one click.
Site address
1863 GETTYSBURG VILLAGE DRIVE 300 BLOCK OF BUILDINGS, OVER 310 AND 320
City
GETTYSBURG
State
PA
ZIP
17325
Mailing
96 BLUE RIDGE COURT, FREDERICK, MD 21703
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
238160
Employees
11
Ownership type
A

5 citations on file for this inspection.

1926.100 A

Serious Gravity 1 1 instance 2 exposed
Issued
Apr 14, 2026
Abate by
Apr 24, 2026
Penalty
Initial $2,128 · Current $1,200 Reduced
29 CFR  1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets:  a. Ground outside Suite 310 - On or about March 13, 2026, employees working on the ground cleaning up debris being thrown down and falling from the roof of the building were subject to struck by falling material hazards without head protection.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $1200
  • — Z (S) $2128

1926.501 B10

Serious Gravity 10 1 instance 4 exposed
Issued
Apr 14, 2026
Abate by
Apr 28, 2026
Penalty
Initial $4,965 · Current $4,000 Reduced
29 CFR  1926.501(b)(10): Each employee engaged in roofing activities on low-slope roofs, with unprotected sides and edges 6 feet (1.8 m) or more above lower levels, was not protected from falling by guardrail systems, safety net systems, personal fall arrest.   a. The Roof - On or about March 13, 2026, employees were engaged in shingle removal and replacement on the top of a tiered roof which included a low slope section of roof without fall protection.   Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $4000
  • — Z (S) $4965

1926.502 D17

Serious Gravity 10 1 instance 5 exposed
Issued
Apr 14, 2026
Abate by
Apr 28, 2026
Penalty
Initial $0 · Current $0
29 CFR  1926.502(d)(17): The attachment point of the body belt was not located in the center of the wearer's back. The attachment point of the body harness was not located in the center of the wearer's back near shoulder level, or above the wearer's head.  a. The Roof - On or about March 13, 2026, employees were using body belt rock climbing harnesses with a front attachment point while performing shingle removal and replacement activities over 15 feet above the paved concrete sidewalk. Employees were exposed to a fall hazard.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.503 A01

Serious Gravity 5 1 instance 9 exposed
Issued
Apr 14, 2026
Abate by
Apr 28, 2026
Penalty
Initial $3,547 · Current $2,000 Reduced
29 CFR  1926.503(a)(1): The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards:  a. 1863 Gettysburg Village Drive - On or about March 13, 2026, employees engaged in roofing work on low slope and steep pitched roofs, exposed to fall hazards without training on fall hazard recognition, appropriate means of fall protection, and policies and procedures to minimize those hazards.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $2000
  • — Z (S) $3547

1926.102 A01

Other-than-serious 2 instances 7 exposed
Issued
Apr 14, 2026
Abate by
Apr 24, 2026
Penalty
Initial $0 · Current $0
29 CFR  1926.102(a)(1): The employer did not ensure that each affected employee used appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation.  a. Ground outside Suite 310 - On or about March 13, 2026, employees working on the ground cleaning up debris being thrown down and falling from the roof of the building were subject to struck by flying material hazards without eye protection.  b. The Roof - On or about March 13, 2026, employees were engaged in removing shingles from the roof of the structure causing metal fasteners and torn and destroyed shingles and splintered wood to fly without eye protection.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348806498.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.