On , OSHA opened a planned safety inspection of ADC GENERAL CONSTRUCTION, LLC in 1863 GETTYSBURG VILLAGE DRIVE 300 BLOCK OF BUILDINGS, OVER 310 AND 320, GETTYSBURG, PA 17325 (NAICS 238160). OSHA activity number 348806498.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ADC GENERAL CONSTRUCTION, LLC
- Site address
- 1863 GETTYSBURG VILLAGE DRIVE 300 BLOCK OF BUILDINGS, OVER 310 AND 320
- City
- GETTYSBURG
- State
- PA
- ZIP
- 17325
- Mailing
- 96 BLUE RIDGE COURT, FREDERICK, MD 21703
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238160
- Employees
- 11
- Ownership type
- A
Citations
5 citations on file for this inspection.
1926.100 A
- Issued
- Apr 14, 2026
- Abate by
- Apr 24, 2026
- Penalty
- Initial $2,128 · Current $1,200 Reduced
General-duty citation text
29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets: a. Ground outside Suite 310 - On or about March 13, 2026, employees working on the ground cleaning up debris being thrown down and falling from the roof of the building were subject to struck by falling material hazards without head protection. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $1200
- — Z (S) $2128
1926.501 B10
- Issued
- Apr 14, 2026
- Abate by
- Apr 28, 2026
- Penalty
- Initial $4,965 · Current $4,000 Reduced
General-duty citation text
29 CFR 1926.501(b)(10): Each employee engaged in roofing activities on low-slope roofs, with unprotected sides and edges 6 feet (1.8 m) or more above lower levels, was not protected from falling by guardrail systems, safety net systems, personal fall arrest. a. The Roof - On or about March 13, 2026, employees were engaged in shingle removal and replacement on the top of a tiered roof which included a low slope section of roof without fall protection. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $4000
- — Z (S) $4965
1926.502 D17
- Issued
- Apr 14, 2026
- Abate by
- Apr 28, 2026
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.502(d)(17): The attachment point of the body belt was not located in the center of the wearer's back. The attachment point of the body harness was not located in the center of the wearer's back near shoulder level, or above the wearer's head. a. The Roof - On or about March 13, 2026, employees were using body belt rock climbing harnesses with a front attachment point while performing shingle removal and replacement activities over 15 feet above the paved concrete sidewalk. Employees were exposed to a fall hazard. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.503 A01
- Issued
- Apr 14, 2026
- Abate by
- Apr 28, 2026
- Penalty
- Initial $3,547 · Current $2,000 Reduced
General-duty citation text
29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards: a. 1863 Gettysburg Village Drive - On or about March 13, 2026, employees engaged in roofing work on low slope and steep pitched roofs, exposed to fall hazards without training on fall hazard recognition, appropriate means of fall protection, and policies and procedures to minimize those hazards. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $2000
- — Z (S) $3547
1926.102 A01
- Issued
- Apr 14, 2026
- Abate by
- Apr 24, 2026
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.102(a)(1): The employer did not ensure that each affected employee used appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation. a. Ground outside Suite 310 - On or about March 13, 2026, employees working on the ground cleaning up debris being thrown down and falling from the roof of the building were subject to struck by flying material hazards without eye protection. b. The Roof - On or about March 13, 2026, employees were engaged in removing shingles from the roof of the structure causing metal fasteners and torn and destroyed shingles and splintered wood to fly without eye protection. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections in this industry (NAICS 238160)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348806498.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.