2,042,423Injury reports 130,778Establishments Most recent incident 2025-12-31
Safety Incidents OSHA Severe Injury Reports · 2015–2025

OSHA Injury Report: Design Ready Controls - BP9

Injury · Days away from work

On , an injury at Design Ready Controls - BP9 in Brooklyn Park, MN 55445 resulted in days away from work. Employee was shipping Clerk in computerized environmental control systems for buildings manufacturing.

Establishment
Design Ready Controls - BP9
Parent company
Design Ready Controls
Street
9901 Winnetka Ave North
City
Brooklyn Park
State
MN
ZIP
55445
On-site location
Shipping
Outcome
Days away from work (code 2)
Type
Injury (code 1)
Days away from work
63
Days restricted or transferred
33

Loading back panel weighing 30-50 lbs

Employee was carrying loading a back panel and when holding one side down and pushing another side they felt a strain on lower middle back

lower middle back strain

larger back panel

Lower back strain

Job description
Shipping Clerk
SOC code
43-5071 — Shipping, Receiving, and Inventory Clerks
NAICS code
334512 — Computerized environmental control systems for buildings manufacturing
NAICS vintage
2022
Avg employees
32
Total hours worked
65786
EIN
411649617
Establishment ID
1051693
Employer case #
Y3WC80233
Date of incident
Shift started
5:00:00.000
Time of incident
19:00:00.000
Submitted
07FEB24:21:09:00

Data from OSHA ITA Form 300/301 electronic submissions, filing year unspecified. ITA Case Detail records are establishment-reported submissions, not OSHA inspections — no per-record IMIS deep link exists.