2,042,423Injury reports 130,778Establishments Most recent incident 2025-12-31
Safety Incidents OSHA Severe Injury Reports · 2015–2025

OSHA Injury Report: Design Ready Controls - BP9

Injury · Job transfer or restriction

On , an injury at Design Ready Controls - BP9 in Brooklyn Park, MN 55445 resulted in job transfer or restriction. Employee was assembler in computerized environmental control systems for buildings manufacturing.

Establishment
Design Ready Controls - BP9
Parent company
Design Ready Controls
Street
9901 Winnetka Ave North
City
Brooklyn Park
State
MN
ZIP
55445
On-site location
Assembly workstation
Outcome
Job transfer or restriction (code 3)
Type
Injury (code 1)
Days restricted or transferred
37

unknown cause for severe right elbow pain

Employee noticed pain in their elbow over multiple days believed to be from repetitive motion

right elbow pain

Crimper Torque drill

Right elbow pain

Job description
Assembler
SOC code
51-2099 — Assemblers and Fabricators, All Other
NAICS code
334512 — Computerized environmental control systems for buildings manufacturing
NAICS vintage
2022
Avg employees
32
Total hours worked
65786
EIN
411649617
Establishment ID
1051693
Employer case #
Y3WC80355
Date of incident
Shift started
5:00:00.000
Submitted
07FEB24:21:12:00

Data from OSHA ITA Form 300/301 electronic submissions, filing year unspecified. ITA Case Detail records are establishment-reported submissions, not OSHA inspections — no per-record IMIS deep link exists.