Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,197,549Inspections Most recent open 2026-08-27 Last loaded 2026-08-31

OSHA Inspection: DANNY'S CONSTRUCTION COMPANY INC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of DANNY'S CONSTRUCTION COMPANY INC in (AUTO PLANT) 5500 ST.RD. 38 E, LAFAYETTE, IN 47903 (NAICS 000000). OSHA activity number 103990602.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Danny'S Construction Company INC for free Get an email when a new federal OSHA severe-injury report for Danny'S Construction Company INC is published. One employer, no account, unsubscribe in one click.
Site address
(AUTO PLANT) 5500 ST.RD. 38 E
City
LAFAYETTE
State
IN
ZIP
47903
Mailing
O B O'BRIEN 3549 EAGLE CR, SHAKAPEE, MN 55379
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
Union (A)
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
1791
Employees
135
Ownership type
Private (A)
Industry flags
Construction safety.

36 citations on file for this inspection.

1926.303 C03

Other-than-serious Gravity 04 2 instances 3 exposed
Issued
Oct 26, 1988
Abate by
Jun 14, 1988

1926.20 B02

Serious 2 instances 65 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988
Penalty
Initial $240 · Current $120 Reduced
Recent events (2)
  • · F (S) $120.00
  • · Z (S) $240.00

1926.28 A

Deleted Serious 1 instance 2 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988
Penalty
Initial $400 · Current $400
Recent events (2)
  • · F (S) $400.00
  • · Z (S) $400.00

1926.500 D01

Serious 2 instances 11 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988
Penalty
Current $100
Recent events (2)
  • · F (S) $100.00
  • · Z (S)

1926.105 A

Serious 2 instances 3 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988
Penalty
Initial $480 · Current $480

1926.153 J

Serious 1 instance 65 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988
Penalty
Initial $320 · Current $320

1926.303 C03

Deleted Serious 2 instances 3 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988
Penalty
Initial $320 · Current $320
Recent events (2)
  • · F (S) $320.00
  • · Z (S) $320.00

1926.404 B01 II

Serious 1 instance 2 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988
Penalty
Initial $320 · Current $320

1926.405 J01 I

Serious 2 instances 1 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988

1926.404 A02

Serious 1 instance 6 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988

1926.404 F06

Serious 3 instances 65 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988

1926.405 A02 IIE

Serious 2 instances 10 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988

1926.405 A02 III

Serious 1 instance 2 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988

1926.416 E01

Serious 3 instances 65 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988

1926.451 E01

Serious 1 instance 1 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988
Penalty
Initial $320 · Current $160 Reduced
Recent events (2)
  • · F (S) $160.00
  • · Z (S) $320.00

1926.451 C04

Serious 2 instances 2 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988

1926.451 E08

Serious 1 instance 1 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988

1926.451 E10

Serious 2 instances 2 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988

1926.500 B01

Serious 1 instance 1 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988
Penalty
Initial $240 · Current $100 Reduced
Recent events (2)
  • · F (S) $100.00
  • · Z (S) $240.00

1926.550 B02

Serious 1 instance 2 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988
Penalty
Initial $480 · Current $480

1926.550 A05

Serious 2 instances 6 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988

1926.556 B02 V

Serious 1 instance 1 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988
Penalty
Initial $240 · Current $240

4000405

Other-than-serious 1 instance 65 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988

1926.150 E01

Other-than-serious 1 instance 65 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988

1926.152 A01

Other-than-serious 1 instance 1 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988

1926.152 D04

Other-than-serious 1 instance 1 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988

1926.152 G09

Other-than-serious 1 instance 65 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988

1926.153 G

Other-than-serious 1 instance 5 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988

1926.153 H10

Other-than-serious 1 instance 65 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988

1926.153 L

Other-than-serious 1 instance 5 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988

1926.350 A09

Other-than-serious 1 instance 5 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988

1926.351 B04

Other-than-serious 2 instances 10 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988

1926.352 D

Other-than-serious 2 instances 2 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988

1926.601 B14

Other-than-serious 1 instance 65 exposed
Issued
Jun 9, 1988
Abate by
Jun 16, 1988

1926.602 A09 I

Other-than-serious 1 instance 65 exposed
Issued
Jun 9, 1988
Abate by
Jun 20, 1988

1926.602 A09 II

Other-than-serious 1 instance 1 exposed
Issued
Jun 9, 1988
Abate by
Jun 14, 1988

View Danny'S Construction Company INC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 103990602.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.