OSHA Inspection: STAINLESS TANK & EQUIPMENT

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of STAINLESS TANK & EQUIPMENT in I94 AND CTH N, COTTAGE GROVE, WI 53527 (NAICS 000000). OSHA activity number 105936561.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Stainless Tank & Equipment — free Get an email when a new federal OSHA severe-injury report for Stainless Tank & Equipment is published. One employer, no account, unsubscribe in one click.
Site address
I94 AND CTH N
City
COTTAGE GROVE
State
WI
ZIP
53527
Mailing
ROUTE 2, BOX 246, COTTAGE GROVE, WI 53527
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
Y
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
3443
Employees
76
Ownership type
A
Industry flags
Manufacturing safety.

24 citations on file for this inspection.

5(a)(1)

Serious Gravity 10 1 instance 40 exposed
Issued
Jan 25, 1990
Abate by
Apr 4, 1990
Penalty
Initial $900 · Current $250 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The
employer did not furnish employment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that employees were expsoed to:
Employees entering tanks (under construction or repair) for grinding
and preparation work are exposed to oxygen deficient and/or toxic
atmospheres.
Among other methods, one feasible and acceptable method to correct these
hazards is to establish and enforce an adequate plant confined space
entry procedure such as that stipulated by ANSI Z117.1-1977, American
National Standard for Working in Tanks and Other Confined Spaces.
Essential elements of this confined space entry procedure would include:
1) Written procedures covering a permit system, isolation, ventilation,
atmospheric testing, rescue procedures and employee training.
2) The completion and posting of a confined space entry permit which
requires authorization and approval in writing that specifiesthe
location and type of work to be done and certifies that all existing
and potential hazards have been evaluated by a qualified person and
necessary protective measures have been taken to ensure the safety
of each worker.
3) Isolation of the confined space to preclude the energy of hazardous
materials and/or activation of energy sources (e.g. electrical,
mechanical, hydraulic, etc.). Methods which can be used to prevent
the entry of hazardous materials or closing and locking two valves
of piping leading to the confined space and locking open a drain
valve leading to the atmosphere between the two closed valves (double
block & bleed).
Methods which can be used to prevent activation of energy sources
affecting the confined space include: locking out electrical line
switches to equipment controlling moving hazards, dissipating stored
energy in capacitors, air, steam, water and other pressure lines and
blocking or repositioning springs, elevated machine members and
rotating flywheels to prevent the release of stored energy.
4) Mechanical ventilation of the confined space prior to entry and
continued ventilation to provide a safe atmosphere, when determined
necessary as described in (2) above.
5) Testing the atmosphere of the confined space prior to entry and on a
regular basis for the presence of sufficient oxygen (19.5% or
greater) and absence of hazardous levels of toxic, flammable or
combustible gases or vapors, when determined necessary as described
in (2) above.
6) Emergency rescue procedures with a requirement that trained personnel
are available and stationed outside the confined space with proper
equipment to provide for rescue of person(s) entering the space. Such
equipment must include safety harness(es) and lifeline(s) with
provisions for hoisting employees from the confined space. If entry
is required for rescue, the rescuing employee(s) must be equipped
with approved supplied air respiratory equipment with escape
provisions or self-contained breathing apparatus (SCBA) plus other
appropriate personal protective equipment.
7) Training of any and all employees required to enter the confined
spaces. The training shall include procedures required prior to
entry, the hazards associated with work in confined spaces as well
as emergency rescue.
Recent events (2)
  • — I (S) $250.00
  • — Z (S) $900.00

1910.20 G01 I

Serious Gravity 03 1 instance 76 exposed
Issued
Jan 25, 1990
Abate by
Feb 26, 1990
Penalty
Initial $270 · Current $160 Reduced
Recent events (2)
  • — I (S) $160.00
  • — Z (S) $270.00

1910.20 G01 II

Serious Gravity 00 1 instance 76 exposed
Issued
Jan 25, 1990
Abate by
Feb 26, 1990

1910.20 G01 III

Serious Gravity 00 1 instance 76 exposed
Issued
Jan 25, 1990
Abate by
Feb 26, 1990

1910.20 G02

Serious Gravity 00 1 instance 76 exposed
Issued
Jan 25, 1990
Abate by
Jan 28, 1990

1910.23 C01

Serious Gravity 07 2 instances 20 exposed
Issued
Jan 25, 1990
Abate by
Mar 26, 1990
Penalty
Initial $630 · Current $380 Reduced
Recent events (2)
  • — I (S) $380.00
  • — Z (S) $630.00

1910.252 E01 I

Serious Gravity 00 2 instances 20 exposed
Issued
Jan 25, 1990
Abate by
Mar 26, 1990
Recent events (2)
  • — I (S)
  • — Z (S)

1910.147 C01

Serious Gravity 07 1 instance 5 exposed
Issued
Jan 25, 1990
Abate by
Feb 26, 1990
Penalty
Initial $630 · Current $380 Reduced
Recent events (2)
  • — I (S) $380.00
  • — Z (S) $630.00

1910.157 G01

Serious Gravity 02 1 instance 76 exposed
Issued
Jan 25, 1990
Abate by
Mar 26, 1990
Penalty
Initial $180 · Current $100 Reduced
Recent events (2)
  • — I (S) $100.00
  • — Z (S) $180.00

1910.157 G02

Serious Gravity 00 1 instance 76 exposed
Issued
Jan 25, 1990
Abate by
Mar 26, 1990

1910.212 A03 II

Serious Gravity 06 2 instances 2 exposed
Issued
Jan 25, 1990
Abate by
Feb 26, 1990
Penalty
Initial $540 · Current $325 Reduced
Recent events (2)
  • — I (S) $325.00
  • — Z (S) $540.00

1910.217 B08 I

Serious Gravity 05 1 instance 3 exposed
Issued
Jan 25, 1990
Abate by
Feb 26, 1990
Penalty
Initial $450 · Current $270 Reduced
Recent events (2)
  • — I (S) $270.00
  • — Z (S) $450.00

1910.217 D09 I

Serious Gravity 00 1 instance 3 exposed
Issued
Jan 25, 1990
Abate by
Feb 26, 1990

1910.217 C02 IA

Serious Gravity 04 2 instances 3 exposed
Issued
Jan 25, 1990
Abate by
Jan 26, 1990
Penalty
Initial $360 · Current $220 Reduced
Recent events (2)
  • — I (S) $220.00
  • — Z (S) $360.00

1910.217 E01 I

Serious Gravity 04 1 instance 3 exposed
Issued
Jan 25, 1990
Abate by
Feb 26, 1990
Penalty
Initial $360 · Current $220 Reduced
Recent events (2)
  • — I (S) $220.00
  • — Z (S) $360.00

1910.217 F02

Serious Gravity 00 1 instance 3 exposed
Issued
Jan 25, 1990
Abate by
Feb 26, 1990

1910.244 B

Serious Gravity 04 1 instance 1 exposed
Issued
Jan 25, 1990
Abate by
Jan 26, 1990
Penalty
Initial $360 · Current $220 Reduced
Recent events (2)
  • — I (S) $220.00
  • — Z (S) $360.00

1910.212 A03 II

Willful Gravity 05 2 instances 5 exposed
Issued
Jan 25, 1990
Abate by
Jan 28, 1990
Penalty
Initial $4,500 · Current $2,500 Reduced
Recent events (2)
  • — I (W) $2500.00
  • — Z (W) $4500.00

1904.2 A

Other-than-serious Gravity 00 1 instance 76 exposed
Issued
Jan 25, 1990
Abate by
Jan 31, 1990

1910.107 E03

Other-than-serious Gravity 00 1 instance 3 exposed
Issued
Jan 25, 1990
Abate by
Jan 26, 1990

1910.132 A

Serious Gravity 02 8 instances 9 exposed
Issued
Jan 25, 1990
Abate by
Feb 8, 1990

1910.184 I09 III

Other-than-serious Gravity 03 1 instance 21 exposed
Issued
Jan 25, 1990
Abate by
Jan 26, 1990

1910.303 B02

Other-than-serious Gravity 02 1 instance 21 exposed
Issued
Jan 25, 1990
Abate by
Jan 26, 1990

1910.1200 F05 II

Other-than-serious Gravity 00 1 instance 3 exposed
Issued
Jan 25, 1990
Abate by
Jan 26, 1990

View Stainless Tank & Equipment's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 105936561.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.