LAWRENCE, MA —
OSHA Inspection: MALDEN MILLS INDUSTRIES
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of MALDEN MILLS INDUSTRIES in 46 STAFFORD STREET, LAWRENCE, MA 01842 (NAICS 000000). OSHA activity number 108933797.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- MALDEN MILLS INDUSTRIES
- Site address
- 46 STAFFORD STREET
- City
- LAWRENCE
- State
- MA
- ZIP
- 01842
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 2262
- Employees
- 1939
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
34 citations on file for this inspection.
5(a)(1)
- Issued
- Feb 11, 1993
- Abate by
- May 16, 1993
- Penalty
- Initial $1,500 · Current $750 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to caustic and corrosive chemicals such as soduim hydroxide dripping from the ceiling which could cause serious injury: (a) Main Mill, Second Floor, Below Tank Form: Chemicals such as sodium hydroxide, leak from the tank farm through the ceiling and onto the employees or the floor below. Among other methods to abate the hazard is to seal the tank room floor and drains.
Recent events (2)
- — I (S) $750.00
- — Z (S) $1500.00
1910.23 A03
- Issued
- Feb 11, 1993
- Abate by
- Feb 15, 1993
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1500.00
1910.23 B01 I
- Issued
- Feb 11, 1993
- Abate by
- Feb 21, 1993
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1500.00
1910.23 C01
- Issued
- Feb 11, 1993
- Abate by
- Feb 21, 1993
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1500.00
1910.106 E02 IVA
- Issued
- Feb 11, 1993
- Abate by
- Feb 21, 1993
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1500.00
1910.106 E02 IVD
- Issued
- Feb 11, 1993
- Abate by
- Feb 21, 1993
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1500.00
1910.133 A01
- Issued
- Feb 11, 1993
- Abate by
- Feb 21, 1993
- Penalty
- Initial $1,875 · Current $1,832 Reduced
Recent events (2)
- — I (S) $1832.00
- — Z (S) $1875.00
1910.212 A03 II
- Issued
- Feb 11, 1993
- Abate by
- Mar 16, 1993
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1500.00
1910.213 I01
- Issued
- Feb 11, 1993
- Abate by
- Mar 16, 1993
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1500.00
1910.215 A04
- Issued
- Feb 11, 1993
- Abate by
- Feb 16, 1993
- Penalty
- Initial $1,125 · Current $560 Reduced
Recent events (2)
- — I (S) $560.00
- — Z (S) $1125.00
1910.215 B09
- Issued
- Feb 11, 1993
- Abate by
- Feb 16, 1993
- Penalty
- Initial $1,125 · Current $560 Reduced
Recent events (2)
- — I (S) $560.00
- — Z (S) $1125.00
1910.219 C02 I
- Issued
- Feb 11, 1993
- Abate by
- Feb 21, 1993
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1500.00
1910.219 C04 I
- Issued
- Feb 11, 1993
- Abate by
- Feb 21, 1993
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1500.00
1910.219 F01
- Issued
- Feb 11, 1993
- Abate by
- Mar 16, 1993
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1500.00
1910.219 F03
- Issued
- Feb 11, 1993
- Abate by
- Mar 16, 1993
- Penalty
- Initial $2,625 · Current $1,325 Reduced
Recent events (2)
- — I (S) $1325.00
- — Z (S) $2625.00
1910.242 B
- Issued
- Feb 11, 1993
- Abate by
- Mar 16, 1993
- Penalty
- Initial $1,125 · Current $560 Reduced
Recent events (2)
- — I (S) $560.00
- — Z (S) $1125.00
1910.262 C05
- Issued
- Feb 11, 1993
- Abate by
- May 16, 1993
- Penalty
- Initial $1,125 · Current $600 Reduced
Recent events (2)
- — I (S) $600.00
- — Z (S) $1125.00
1910.262 O
- Issued
- Feb 11, 1993
- Abate by
- May 16, 1993
- Penalty
- Initial $3,750 · Current $1,875 Reduced
Recent events (2)
- — I (S) $1875.00
- — Z (S) $3750.00
1910.262 D01
- Issued
- Feb 11, 1993
- Abate by
- Mar 16, 1993
- Penalty
- Initial $1,875 · Current $1,875
Recent events (2)
- — I (S) $1875.00
- — Z (S) $1875.00
1910.303 B02
- Issued
- Feb 11, 1993
- Abate by
- Feb 16, 1993
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1500.00
1910.303 G02 I
- Issued
- Feb 11, 1993
- Abate by
- Mar 16, 1993
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1500.00
1910.303 F
- Issued
- Feb 11, 1993
- Abate by
- May 16, 1993
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1500.00
1910.305 B02
- Issued
- Feb 11, 1993
- Abate by
- Mar 16, 1993
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1500.00
1910.305 G01 I
- Issued
- Feb 11, 1993
- Abate by
- Feb 16, 1993
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1500.00
1910.305 G02 III
- Issued
- Feb 11, 1993
- Abate by
- Feb 16, 1993
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1500.00
1910.22 A02
- Issued
- Feb 11, 1993
- Abate by
- Feb 21, 1993
1910.22 B01
- Issued
- Feb 11, 1993
- Abate by
- Mar 16, 1993
1910.27 F
- Issued
- Feb 11, 1993
- Abate by
- Feb 21, 1993
1910.36 B04
- Issued
- Feb 11, 1993
- Abate by
- Feb 21, 1993
1910.37 G02
- Issued
- Feb 11, 1993
- Abate by
- Mar 16, 1993
1910.37 Q01
- Issued
- Feb 11, 1993
- Abate by
- Feb 21, 1993
1910.178 P01
- Issued
- Feb 11, 1993
- Abate by
- Feb 15, 1993
1910.303 G01 II
- Issued
- Feb 11, 1993
- Abate by
- Feb 15, 1993
1910.305 G01 III
- Issued
- Feb 11, 1993
- Abate by
- Feb 16, 1993
More inspections at Malden Mills Industries
View Malden Mills Industries's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in MA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 108933797.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.