SELMA, AL ·
OSHA Inspection: HAMMERMILL PAPER, RIVERDALE PLANT
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of HAMMERMILL PAPER, RIVERDALE PLANT in RIVER RD., SELMA, AL 36701 (NAICS 000000). OSHA activity number 109694083.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- HAMMERMILL PAPER, RIVERDALE PLANT
- Site address
- RIVER RD.
- City
- SELMA
- State
- AL
- ZIP
- 36701
- Mailing
- P.O. BOX 1409, SELMA, AL 36701
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Union (Y)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 2621
- Employees
- 690
- Ownership type
- Private (A)
Citations
101 citations on file for this inspection.
5(a)(1)
- Issued
- Aug 26, 1992
- Abate by
- Sep 30, 1992
- Penalty
- Initial $2,500 · Current $2,735
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of being struck by the load line wire rope and snatch block (a whip lash action) where a base mounted hoist is used for horizontal pulling of the slasher deck scraper car. One feasible and acceptable method to correct this hazard is to comply with proper rigging where employees are required to work within the bight of the wire rope and snatch block: (a) The wire rope on the hoist is crushed and kinked on the base mounted hoist drum. This line must be replaced (b) The eye at the end of the wire rope which is attached to the scraper car is formed with knots, u-bolt and clips. Eyes shall be formed by approved wire rope eye forming devices and knots in wire rope cannot be used. (c) The wench operator shall be shielded behind a barrier to prevent exposure from whip lash if the wire rope breaks.
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2500.00
5(a)(1)
- Issued
- Aug 26, 1992
- Abate by
- Sep 30, 1992
- Penalty
- Initial $5,000 · Current $2,735 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees are exposed to the hazrd of being struck by falling conveyor return rollers at heights of greater that 20 feet. Among others, one feasible and acceptable method of abatement is to install an expanded metal wire mesh barrier underneath elevated conveyors to retain fallen conveyor return rollers: (a) #1 bark area at bark belt #237 (b) #1 bark area at bark belt #233 (c) Bark boiler conveyor, bark belt #238 (d) #1 wood yard, fines belt #2 (e) #1 wood yard, purchase chip belt (K210) (f) #1 wood yard, purchase chip belt (CB #1) (g) #1 wood yard, bark belt #3
Recent events (2)
- · F (S) $2734.94
- · Z (S) $5000.00
1910.261 A03 VI
- Issued
- Aug 26, 1992
- Abate by
- Sep 30, 1992
- Penalty
- Initial $2,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2500.00
1910.261 B01
- Issued
- Aug 26, 1992
- Abate by
- Sep 30, 1992
- Penalty
- Initial $5,000 · Current $2,735 Reduced
Recent events (2)
- · F (S) $2734.94
- · Z (S) $5000.00
1910.305 A01 I
- Issued
- Aug 26, 1992
- Abate by
- Sep 30, 1992
- Penalty
- Initial $2,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2500.00
1910.151 C
- Issued
- Aug 26, 1992
- Abate by
- Sep 30, 1992
- Penalty
- Initial $17,500 · Current $2,735 Reduced
Recent events (2)
- · F (R) $2734.94
- · Z (R) $17500.00
1910.261 A03XVIII
- Issued
- Aug 26, 1992
- Abate by
- Sep 30, 1992
- Penalty
- Initial $12,500 · Current $2,735 Reduced
Recent events (2)
- · F (R) $2734.94
- · Z (R) $12500.00
1910.261 B01
- Issued
- Aug 26, 1992
- Abate by
- Sep 30, 1992
- Penalty
- Initial $12,500 · Current $2,735 Reduced
Recent events (2)
- · F (R) $2734.94
- · Z (R) $12500.00
1910.261 B01
- Issued
- Aug 26, 1992
- Abate by
- Sep 30, 1992
- Penalty
- Initial $25,000 · Current $2,735 Reduced
Recent events (2)
- · F (R) $2734.94
- · Z (R) $25000.00
1910.261 B01
- Issued
- Aug 26, 1992
- Abate by
- Sep 30, 1992
Recent events (2)
- · F (R)
- · Z (R)
5(a)(1)
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $3,500 · Current $2,735 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of smoke inhalation and thermal burns due to backdraft of fire and smoke from the bark boilers at the #1 bark boiler,ground floor at the chutes to the bark boiler (confined space) to use an air lance with compressed air to force bark into the boiler which has jammed or plugged the feed chutes. They are required to open the inspection ports or doors of these bark feed chutes and blow the plugged bark into the boiler furnace. This action causes burning bark and flames to blow back onto them with heavy smoke. Among others, one feasible and acceptable method to correct this hazard is to install the inspection ports or doors on the front side of the bark feed chutes which would be at a downward angle, so that burning bark, fire and smoke would not fall out of the bark feed chutes onto employees. Also, employees will have an adequate escape route from this side.
Recent events (2)
- · F (S) $2734.92
- · Z (S) $3500.00
5(a)(1)
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,500 · Current $2,735
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of thermal burns from hot smelt spitting from the boiler smelt spouts. This condition occurs when the boiler is sucking too much air causing the smelt to cool, lump up and plug the smelt spouts. When this condition occurs, employees were allowed to go to the boiler at the smelt spouts while it is spitting hot smelt to shut off the fuel supply (black liquor) by a manually-operated valve, and to remove the black liquor fueling nozzle/gun which exposes employees to the hazard of being burned by the hot smelt. Among others, one feasible and acceptable method to correct this hazard is to relocate the manual shut-off valve away from the boiler smelt spouts and to leave the fuel nozzle/gun in place. Additionally, written operating procedures should be developed and distributed to each affected employee outlining the procedures to take during a boiler blow-back.
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2500.00
5(a)(1)
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in tht employees were exposed to the hazard of thermal burns and blow-back of hot steam and ash at the #1 recovery boiler, 8th floor at southside man-door. The man-door latch is broken and the door is jammed with a steel rod. The steel rod does not keep the man-door completely closed which allows steam and ash to escape from the door openings. Among others, one feasible and acceptable method to correct this hazard is to repair the latch on the man-door to insure that the door effectively closers as intended by engineering and design.
Recent events (2)
- · F (S)
- · Z (S)
5(a)(1)
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,500 · Current $2,735
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of being struck by slasher table circular saw blades approxi- mately five feet in diameter and weighing 800-1000 pounds each. The saw blades are stored in a "saw rack", and when the rack is open employees are exposed to being struck by saw blades should the blades roll out of the rack. Among others, one feasible and acceptable method to correct this hazard is to re-construct a saw-rack" that will contain the circular saw blades when the saw rack gate is open, thus preventing the circular saw blades from rolling out of the rack onto employees.
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2500.00
5(a)(1)
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of being struck by falling logs. Employees are required to climb into the debarker frum to unchoke the debarker where logs are sometimes cut too long and the log will try to go through the debarkers circular opening in a vertical position causing a choke condition. Other logs will pile up behind the choke log. When this condition occurs, employees must go into the debarker to wrap a choker sling around the choke log to feed it. The debarker is then energized, and as it makes a revolution, the choke log is snatched free. Among others, one feasible and acceptable method to correct this hazard is to install an air tugger or winch somewhere above the debarker opening. An eyelet or other type pick-up device can be installed at the end of the winch load line and a pickroom or other long pole device can be used to pull the wire rope around the choke log back up to the operator. This method would not require an employee to enter the debarking drum to unchoke it. A special written operating procedure should be done to initiate employees with this procedure.
Recent events (2)
- · F (S)
- · Z (S)
5(a)(1)
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,500 · Current $2,735
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of falls into chipper knives and logs 22 feet into the infeed chute of the chipper. Employees use a fiber rope to lower themselves down the chipper chute into the base of the chipper to unclog or unjam it. One feasible and acceptable method to correct this hazard is to construct a swing and removable beam over the chipper chute where a control descent device can be hung or supported. The employee shall use a body harness hooked to the control descent device and he can be lowered into the infeed chute of the chipper. The chipper shall be locked out in accordance with lockout/tagout procedures.
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2500.00
5(a)(1)
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $5,000
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of being struck by falling crane loads in the rear of the slasher deck, Grove hydraulic extensible boom crane, Model AP308, SN 70082, the anti two-block device is not functioning. One feasible and acceptable method to correct this hazard is to comply with concensus standard, American National Standard Insti- tute, Mobile Hydraulic Cranes, ANSI B30-1973, Section 15-1.3.3(d): Telescoping boom cranes were not provided with a two-blocking pre- venting device to prevent damage to the hoist rope or other machine components.
Recent events (2)
- · F (S)
- · Z (S) $5000.00
5(a)(1)
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of being struck by falling crane loads at the south end of the slasher deck, Grove hydraulic extensible boom crane, model AP308,SN 73156. One of the cranes' outriggers is not functioning. Only three outriggers were extended. One feasible and acceptable method to correct this hazard is to comply with concensus standards, American National Standard Institute, Mobile Hydraulic Cranes, ANSI B30.15-1973, Section 15-1.9.3(a): Means were not provided when blocked for hoisting.
Recent events (2)
- · F (S)
- · Z (S)
1910.24 B
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $1,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $1500.00
1910.24 F
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2500.00
1910.24 I
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2500.00
1910.28 A01
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $3,500 · Current $2,735 Reduced
Recent events (2)
- · F (S) $2734.94
- · Z (S) $3500.00
1910.28 D03
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,000
Recent events (2)
- · F (S)
- · Z (S) $2000.00
1910.37 F02
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $1,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $1500.00
1910.103 B01 IC
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,000 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2000.00
1910.103 B02 IID
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,000 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2000.00
1910.103 B03 IIE
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,000 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2000.00
1910.106 E02 III
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,000 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2000.00
1910.106 E07
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,000 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2000.00
1910.106 E09 I
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,000 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2000.00
1910.106 F03 IV
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $1,500
Recent events (2)
- · F (S)
- · Z (S) $1500.00
1910.106 F06
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,000 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2000.00
1910.106 G03 III
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,000 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2000.00
1910.147 C04 I
- Issued
- Aug 5, 1992
- Abate by
- Aug 14, 1992
- Penalty
- Initial $5,000 · Current $2,735 Reduced
Recent events (2)
- · F (S) $2734.94
- · Z (S) $5000.00
1910.157 D01
- Issued
- Aug 5, 1992
- Abate by
- Aug 14, 1992
- Penalty
- Initial $1,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $1500.00
1910.184 I01
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2500.00
1910.184 I09 III
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
Recent events (2)
- · F (S)
- · Z (S)
1910.215 A04
- Issued
- Aug 5, 1992
- Abate by
- Aug 8, 1992
- Penalty
- Initial $1,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $1500.00
1910.215 B09
- Issued
- Aug 5, 1992
- Abate by
- Aug 14, 1992
- Penalty
- Initial $1,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $1500.00
1910.253 B01 II
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,000 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2000.00
1910.253 B02 II
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
Recent events (2)
- · F (S)
- · Z (S)
1910.253 B04 III
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,000 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2000.00
1910.254 C03
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $1,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $1500.00
1910.261 A03 VI
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $5,000 · Current $2,735 Reduced
Recent events (2)
- · F (S) $2734.94
- · Z (S) $5000.00
1910.261 A03 VI
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2500.00
1910.261 A03 VI
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
Recent events (2)
- · F (S)
- · Z (S)
1910.261 A03 VI
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2500.00
1910.261 A03 VI
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $5,000 · Current $2,735 Reduced
Recent events (2)
- · F (S) $2734.94
- · Z (S) $5000.00
1910.261 A03 VI
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,000 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2000.00
1910.261 A03 VI
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $5,000 · Current $2,735 Reduced
Recent events (2)
- · F (S) $2734.94
- · Z (S) $5000.00
1910.261 A03 VI
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2500.00
1910.261 A03 VI
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2500.00
1910.261 A03 X
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2500.00
1910.261 A03 XII
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2500.00
1910.261 A03 XIII
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2500.00
1910.261 A03 XIII
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2500.00
1910.261 A03 XIII
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2500.00
1910.261 A03 XIII
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2500.00
1910.261 A03 XIII
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2500.00
1910.261 A03 XIII
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2500.00
1910.261 B01
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $1,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $1500.00
1910.261 B01
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $1,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $1500.00
1910.261 B03
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $1,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $1500.00
1910.261 B03
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,000 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2000.00
1910.261 C08 VII
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,500
Recent events (2)
- · F (S)
- · Z (S) $2500.00
1910.261 C15 II
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2500.00
1910.261 E01
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,000
Recent events (2)
- · F (S)
- · Z (S) $2000.00
1910.261 E12 I
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,000 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2000.00
1910.261 E12 II
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,000 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2000.00
1910.261 G18 IV
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1994
- Penalty
- Initial $2,000 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2000.00
1910.261 G23
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,000 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2000.00
1910.303 B01
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $5,000 · Current $2,735 Reduced
Recent events (2)
- · F (S) $2734.94
- · Z (S) $5000.00
1910.303 C
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2500.00
1910.304 F05 IVA
- Issued
- Aug 5, 1992
- Abate by
- Aug 10, 1992
- Penalty
- Initial $2,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2500.00
1910.304 F05 V
- Issued
- Aug 5, 1992
- Abate by
- Aug 10, 1992
Recent events (2)
- · F (S)
- · Z (S)
1910.305 A02 IIIG
- Issued
- Aug 5, 1992
- Abate by
- Aug 10, 1992
- Penalty
- Initial $5,000 · Current $2,735 Reduced
Recent events (2)
- · F (S) $2734.94
- · Z (S) $5000.00
1910.305 B01
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $3,500 · Current $2,735 Reduced
Recent events (2)
- · F (S) $2734.94
- · Z (S) $3500.00
1910.305 B02
- Issued
- Aug 5, 1992
- Abate by
- Aug 8, 1992
- Penalty
- Initial $5,000 · Current $2,735 Reduced
Recent events (2)
- · F (S) $2734.94
- · Z (S) $5000.00
1910.305 G01 I
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $2,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2500.00
1910.305 G02 II
- Issued
- Aug 5, 1992
- Abate by
- Aug 28, 1992
- Penalty
- Initial $2,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2500.00
1910.307 B
- Issued
- Aug 5, 1992
- Abate by
- Aug 8, 1992
- Penalty
- Initial $2,500 · Current $2,735
Recent events (2)
- · F (S) $2734.94
- · Z (S) $2500.00
5(a)(1)
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $25,000 · Current $13,582 Reduced
General-duty citation text
The alleged violations below have been grouped because they involve similar or related hazards that may increase the potential for injury resulting from an accident: Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to burns from contact with steam, steam and condensate pipes, valves, valve bonnets, and/or hot water: (a) Tall Oil Area at Tall Oil Reactor - The #150 steam line to the sample tank was not insurlated or barracaded to protect employees from thermal burns. (b) #2 Bark Boiler, 2nd Floor, South Wall - The minimun flow line was not insulation or barracaded exposing employees to thermal burns. (c) #2 Bark Boiler, 3rd Floor, South Wall - The feedwater line was not insulated or barracadee,exposing employees to thermal burns. (d) #2 Bark Boiler 150# Steam to Tall Oil - The 150# steam line valve bonnet was not barracaded or insulated exposing employees to the hazard of thermal burns. (e) #1 Bark Boiler, Top of the Steam Drum - The crossover line from the steam drum to the superheater 600# boiler was not insulated or barracaded, exposing employees to the hazard of thermal burns. (f) #1 Bark Boiler, 5th floor, East Side, Steam Drum - Drum level taps were not insulated or barracaded exposing employees to the hazard of thermal burns. (g) #1 Bark Boiler, 3rd floor elevation, East Side - Steam lines to the sootblowers were not insulated or barracaded exposing employees to the hazard thermal burns. (h) #1 Bark Boiler, Ground floor, North side at Boiler Ash Hopper - The re-injection lines were not insulated or barracaded, exposing employees to the hazard of thermal burns. (i) #1 Bark Boiler, East side of Trubine Room, 2nd floor Level - 60# steam bleed line was not barracaded or insulated exposing employees to the hazard of thermal burns. (j) #1 Bark Boiler, West sied at Feed water Regulator Platform - The steel piping at the regulator was not barracaded or insulated exposing employeess to the hazard of thermal burns. (k) Feedwater Bldg., 3rd floor, Deaerator heater - The #30 steam line to the heater is not insulated or barracaded exposing employees to the hazard of thermal burns. (l) Feedwater Bldg., Trubine driven feedwater pump to the #1 Bark Boiler - The 60# exhaust off the trubine was not insulated or barracaded exposing exployees to thermal burns. (m) #2 Recovery, 4th floor - The 60# steam line, valve and bonnet was not insulated or barracaded exposing employees to the hazard of thermal burns. (n) #2 Recovery, 5th floor, CE Boiler - The 60# steam pipe to the Air Heater was not insulated or barraceded exposing employees to thermal burns. (o) #2 Recovery, 2nd floor, near Precipitator - The three bonnets and valves were not insulated or barracaded (60# headed from 650 to 60 PRV) exposing employees to the hazard of thermal burns. (p) #2 Recovery, #2 Concentrator - Insulation had been torn away from the 60# steam line to the concentrator exposing employees to the hazard of thermal burns. (q) #2 Recovery, #1 concentrator - The 60# steam line to the concentrator was not insulated or barracaed exposing employees to thermal burns. (r) #2 Recovery Boiler, 3rd floor - The mud drum flow down valve and pipe was not insulated or barracaded exposing employees to the hazard of theremal burns. (s) #2 Recovery Boiler. 4th floor - The black liquor outlet pipe to the sample bowl was not insulated or barracaed exposing employees to the hazard of thermal burns. (t) #2 Bark Boiler, Ground floor, #2 Feedwater Turbine Inlet Water Valve - When employees must access the inlet water valve, he/she is exposed to thermal burrns from un insulated 650 # steam line, valve and bonnet. (u) #1 Recovery Boiler, 2nd floor, South East corner - The 60# steam valve is leaking hing pressure stem exposing employees the the hazard of thermal burns. (v) Tall Oil Area, Tall Oil Reactor at Ground Level - The 150# steam line discharge to the tall oil reactor was not insulated or barracaded exsposing employees to thermal burns. (w) Tall Oil Reactor - The 150# steam line to the Tall Oil reactor was not insulated or barracaded exposing employees to the hazard of thermal burns. (x) Tall Oil Reacotor Platform at South End - The 150# steam line to the Tall Oil Reacotr - The valve bonnet was leaking high pressure steam exposing employees to the hazard of thermal burns. (y) Tall Oil Area, Platform at South End - The 150# steam line going to the Tall Oil Reactor the steam line and its valve bonnet was not inlulated or barracaded exposing employees to the hazard of thremal burns. (z) Tall oil Reactor Tank T930 - The 150# steam line was not insulated or barracaded exposing employees to the hazard of thermal burns. (aa) Tall Oil Wet Storage, Steam line to the Heaterr in the Control Room - The 60# steam line was not insulated or barracaded exposing employees to the hazard of thermal burns. (bb) Tall Oil Storage - The 60# steam line to P904 was not insulated or barracaded exposing employees to the hazard of thermal burns. (cc) The 60# manual valve to the #2 effect evaporator - The valve bonnet was not insulated or barracaed exposing employees to the hazard of thermal burnss. (dd) ID Fan Turbine - 60# exhaust off the turbine was not insulated or barracaded, exposing employees to the hazard of thermal burns. (ee) #2 Evoporator - 60# pure condensate line was not insulated or barracaded exposing employees to the hazad of thermal burns. (ff) Liquor Tank Area, between the two heavy tanks - The Stanless steel line between thest two tanks was not insulated or barracaded exposing employees to thermal burns. (gg) Liquior Tank Area, valve station between the tow heavy tanks - The line between these two tanks were not insulated, or barracaded exposing employees to the hazard of thermal burns. (hh) Liquor Tank Area, Soap Transfer to Tall Oil Pump - Insulation had been removed from the steam line exposing employees to the hazard of thermal burns. (ii) Liquor Tank Area, #2 Effect Evaperators at Feed Pumps #1 - The weak block liquor feed line to the #1 Evaperator was not insulated or baracaded exposing employees to the hazard of thermal burns. (jj) #1 Recovery Boiler Under the precipitator, North side ID Fan steam line - Insulation was removed exposing employees to thermal burns. (kk) #1 Recovery Boiler, #1 Concentrated Liquor Storage Piping at the #1 Pump - Insaulation had been removed from the pipe exposing employees to thermal burns. (ll) #1 Recovery Boiler, Line form the #3 Condensate Receiver - Insulation had been removed exposing employees to the hazard of thermal burns. (mm) Evaporator Area, 60# steam to the concentrator - The automatic valve to the concentrator was not barracaded or insulated exsposing employees to the hazard of thermal burns. (nn) Top of Evaporator at Hogging Jets - The 150# steam line's of the hogging jets were not barrocaded or insulated exposing employes to the hazard of thermal burns. (oo) Primary Injectors to the steam Evaporator - The steam lines were not insulated or barracaded exposing employees to the hazard of thermal burns. (pp) #1 Recovery Boiler, 9th Level - Steam Drum Vent lines at 760 Fahrenheit were ot insulated or barracaded exposing employers to the hazard of thremal burns. (qq) #1 Recovery Boiler, 9th floor, Superheater Outlet line North of non-return valve - An elevated platform was located adjacent to a 650# steam line(750 Fahernheit) was not barracadedf or insulated exposing employees to thermal burns. (rr) #1 Recovery Boiler, 9th floor, IK Sootblower Steam valve, South Wall - The 650# steam valve was not barracaded or insulated exposing employees to the hazard of thermal burns. (ss) #1 Recovery Boiler, South-end of Steam Room, Hydro - Step level indicator - Employees were exposed to the hazard of thermal burns where piping at 600 Farenheit was not insulated or barracaded. (tt) #1 Recovery Boiler, South-end of Steam Room, Piping to DP Cell - DP cell piping was not insulated or barracaded, exposing employees to the hazard of thermal burns. (uu) #1 Recovery Boiler, 9th floor South-end of Steam Room - The feedwater line to the Ecomonizer and Feed Drum was not barracaded or insulated exposing employees to thermal burns. (vv) #1 Recovery Boiler, 8th floor, Southside at #2 Sootblower - IK steam line was not insulated or barracaded exposing employees to the hazard of thermal burns. (ww) #1 Recovery Boiler, 6th floor, Southwall Sootblower - The IK steam lines were not barracaded or insulated exposing employees to the hazard of thermal burns. (xx) #1 Recovery Boiler, DA Tank - Derarator lines were not barracaded or insulated exsposing employees to the hazard of thermal burns. (yy) #1 Recovery Boiler, 650# steam line, South Pipe Chase - The line was not insulated dorr barracaded exposing employees to the hazard of thermal burns. (zz) #1 Recovery Boiler, 3rd floor, Feedwater Regulator to the Power Boiler - The control valve is leaking water at 270 Farenheit exsposing employees to the hazard of thermal burns. (aaa) #1 Recovery Boiler, Eric City power Boiler Superheater Drain - Power piping was not barracaded or insulated exposing employees to the hazard of thermal burns. (bbb) #1 Recovery Boiler, 2nd floor, Southside at Stairway - 650# steam line was not barracaded or insulated exposing employees to the hazard of thermal burns. (ccc) #1 Recovery Boiler, 2nd floor, Southeast Corner - 60# Steam line was not barracaded or insulated exposing employees to the hazard of thermal burns. (ddd) #1 Recovery Boiler, 2nd floor, At the #1 Precipitator - Both level control valves were malfunctioning exposing employees to thermal and/or chemical burns from falling black liquor at 250 Farenheit. (eee) #1 Recovery Boiler, Ground floor, Feedwater Pump - Steam valve was leaking (steam at 150 Farenheit) and employees were exposed to the hazard of thermal burns. (fff) #1 Recovery Boiler, Ground floor, Norht conddensate Pump - The flange gasket isleaking steam at high pressure exposing employees to the hazard of thermal burns. (ggg) #1 Recovery Boiler, 8th floor, Southside, #1 IK Sootblower - The steam valve (packing) is leaking high pressure steam exposing employers to hazard of thermal burns. (hhh) #1 Recovery Boiler, floor #2 1/2, 650# Steam to 150# PRV at 650# steam line - The east and west lines were not insulated or barracaded exposing employees to the hazard of thermal burns. (iii) #1 Recovery Boiler, floor #2 1/2, 650# steam to 150# PRV - The west steam line bonnet was leaking high pressure steam exposing employees to the hazard of thermal burns. (jjj) #1 Recovery Boiler, Ground floor, at 60#, 150# and 650# Steam headers - The steam lines and bonnets were not barracaded or insulated exposing employees to the hazard of thermal burns. (kkk) #1 Recovery Boiler, 350 floor, 650# Steam to the 150 # PRV - The insulation had been removed exposing employees to the hazard of thermal burns. (lll) #1 Recvery Boiler, 3rd floor, Steam line from the PRV to the 150# steam header - Insulation had been removed exposing employees to the hazard of thermal burns. (mmm) #1 Recovery Boiler, Bottom floor manual valve at the 60# steam header - The manual valve bonnet was not barracaded or insulated exposing employees to the hazard of thermal burns. (nnn) #1 Recovery Boiler, ground floor, North condensate Pump - The flange gasket is leaking high pressure steam exposing employees to the hazard of thermal burns. (ooo) #1 Recovery Boiler, ground floor, Feedwater Pump - Steam valves are leaking high pressure steam exposing employees to the hazard of thermal burns. (ppp) #1 Recovery Boiler, Moter Driven Feedwater Pump - Insulation was removed from the pump (275 Farenheit) exposing employees to the hazard of thermal burns. (qqq) #1 Recovery Boiler, ground floor, Manual valve bonnets on the 60#, 150#, and the 650# headers were not barracaded or insulated exposing employees the hazard of thermal burns. (rrr) #1 Recovery Boiler, ground floor, 150# Steam to the 260# Reducing station - TEH insulation had been removed exposing employees to the hazard of thermal burns. (sss) #1 Recovery Boiler, ground floor, Blow-down Tank for the #1 and #2 Trubine Generators Bleed-off lines - the lines were not barracaded or insulated exposing employees to the hazard of thermal burns. (ttt) #1 Recovery, ground floor, Outside area, 60# Stream to the #1 Evaporator from the 60# Header - The flange at the manual valve was leaking high pressure steam exopsing employees to the hazard of thermal burns. (uuu) #1 Recovery Boiler, ground floor, 150# Extraciton Steam flow meter - The gasket at the flange was leaking high pressure steam exposing employees to the hazars of thermal burns. (vvv) #1 Recovery Boilerr, 3rd Floor, Consensate Power Boiler Drum Level Transfer - The line was not barracaded or inslulated exposing employees to the hazard of thermal burns. (www) #1 Recovery Boiler, 650# Steam to the 150# PRV - The 650# steam line was not insulated or barracaded exposing employees to the hazard of thermal burns. (xxx) #1 Recovery Boiler, 650# Steam to the 150# PRV - The valve bonnet at the west side steam line was leaking high pressure steam exposing employees the the hazard of thermal burns. (yyy) #1 Recovery Boiler, 3rd floor, 1500# steam line to the 650# PRV - The line was not barracaded or insulated exposing employees to the hazard of thermal burns. (zzz) Caustic area non condensable gas unit - Employees exposed to thermal burns due to steam piping for demister line was not insulated. (aaaa) Caustic area, Top of #3 slaker - Employees exposed to thermal burns. (bbbb) Meggane Paper Machine, VLV6751 - Employees exposed to thermal burns due to un-insulated steam line. (cccc) #1 Bleach Plant - Steam line to digester blow line sampler was insulated exposing employees to thermal burns. (dddd) #1 Recovery Bailer, 4th floor at continous blowdown line - Hot water pipe is secured with thin gauge safety wire. (eeee) #1 Recovery Boiler, Roof Area - The supper outlet safety vent stack is rusted out and is less than one feet above the floor exposing employees to the hazard of thermal burns. (ffff) #1 Recovery Boiler at Continous Blowdown Line - Thin gauge wire is used to support hot water pipes exposing employees to the hazard of thermal burns is the support broke and the hot water pipe falls and break. INTERNATIONAL PAPER COMPANY WAS PREVIOUSLY CITED FOR A VIOLATION OF THIS OCCUPATIONAL SAFETY AND HEALTH STANDARD OR ITS EQUIVALENT STANDARD 29 CFR 1910.261(k)(11) or GENERAL DUTY CLAUSE SECTION 5(a)(1) WHICH WAS CONTAINED IN OSHA INSPECTION 102306214, CITATION 02, ITEM 18, ISSUED ON 07/20/90.
Recent events (2)
- · F (R) $13581.92
- · Z (R) $25000.00
1904.2 A
- Issued
- Aug 5, 1992
- Abate by
- Sep 23, 1992
- Penalty
- Initial $14,000 · Current $13,582 Reduced
Recent events (2)
- · F (R) $13581.93
- · Z (R) $14000.00
1910.22 B01
- Issued
- Aug 5, 1992
- Abate by
- Aug 8, 1992
- Penalty
- Initial $12,500 · Current $13,582
Recent events (2)
- · F (S) $13581.93
- · Z (R) $12500.00
1910.37 K02
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $10,000 · Current $13,582
Recent events (2)
- · F (R) $13581.93
- · Z (R) $10000.00
1910.261 A03XVIII
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $17,500 · Current $13,582 Reduced
Recent events (2)
- · F (R) $13581.93
- · Z (R) $17500.00
1910.261 B01
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $25,000 · Current $2,735 Reduced
Recent events (2)
- · F (S) $2734.94
- · Z (R) $25000.00
1910.261 B03
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $17,500 · Current $2,735 Reduced
Recent events (2)
- · F (S) $2734.94
- · Z (R) $17500.00
1910.261 B03
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $25,000 · Current $2,735 Reduced
Recent events (2)
- · F (R) $2734.94
- · Z (R) $25000.00
1910.261 B03
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $17,500 · Current $2,735 Reduced
Recent events (2)
- · F (R) $2734.94
- · Z (R) $17500.00
1910.261 B03
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $25,000 · Current $2,735 Reduced
Recent events (2)
- · F (R) $2734.94
- · Z (R) $25000.00
1910.261 B03
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
Recent events (2)
- · F (R)
- · Z (R)
1910.261 B03
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
Recent events (2)
- · F (R)
- · Z (R)
1910.261 B03
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $17,500 · Current $2,735 Reduced
Recent events (2)
- · F (R) $2734.94
- · Z (R) $17500.00
1910.261 C15 IV
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $25,000 · Current $2,735 Reduced
Recent events (2)
- · F (R) $2734.94
- · Z (R) $25000.00
1910.303 G02 I
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $25,000 · Current $2,735 Reduced
Recent events (2)
- · F (R) $2734.94
- · Z (R) $25000.00
1910.305 G01 III
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
- Penalty
- Initial $12,500 · Current $2,735 Reduced
Recent events (2)
- · F (R) $2734.94
- · Z (R) $12500.00
1904.4
- Issued
- Aug 5, 1992
- Abate by
- Sep 23, 1992
- Penalty
- Initial $7,000 · Current $7,000
1910.22 D01
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
1910.37 G01
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
1910.147 C06 II
- Issued
- Aug 5, 1992
- Abate by
- Sep 8, 1992
More inspections at Hammermill Paper, Riverdale Plant
View Hammermill Paper, Riverdale Plant's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in AL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 109694083.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.