OSWEGO, NY —
OSHA Inspection: CHARLES T. DRISCOLL MASONARY
Unprogrammed Related inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Related safety inspection of CHARLES T. DRISCOLL MASONARY in 26 EAST FIRST STREET, OSWEGO, NY 13126 (NAICS 000000). OSHA activity number 109861773.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- CHARLES T. DRISCOLL MASONARY
- Site address
- 26 EAST FIRST STREET
- City
- OSWEGO
- State
- NY
- ZIP
- 13126
- Mailing
- 4562 JORDAN ROAD, SKANEATELES FALLS, NY 13152
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 1743
- Employees
- 2
- Ownership type
- A
- Industry flags
- Construction safety.
Citations
3 citations on file for this inspection.
5(a)(1)
- Issued
- Jan 21, 1994
- Abate by
- Jan 25, 1994
- Penalty
- Initial $1,125 · Current $1,125
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of a collapse of a twopoint suspended scaffold: a.ON THE JOBSITE, SYRACUSE UNIVERSITY, SOUTH SIDE OF GGERS HALL. On or about September 15, 1993. Two (2) employees were exposed to a fall hazard while using a HitLo Climbers, model D800 Series twopoint suspended scaffolding while installing caulking material along the outside masonry wall seams. The following rigging procedures were not followed as required by the manufacturer of HiLo Climber; and the American National Standard Institute (ANSI A1081988) on Scaffolding Safety Requirements. 1.A Torque Wrench reading FTLBS t determine that the 5/16 inch first grip wire rope clips were tightened to 30 FTLBS onto the wire rope suspending the two point scaffold. 2.Applying a proof load to the wire rope to check first grip clips and then retorquing the clips to 30 FTLBS with the proof load applied. One feasible and acceptable abatement method, among others, to correct these hazards are: 1.Using a torque wrench which reads in FTLBS to adequately torque the fist grip wire rope clips to the wire rope according to the manufacturers specifications of 30 FTLBS. 2.Applying a proof load of 1,000 LBS to the wire rope to check the fist grip clips and then retorquing the fist grips again to 30 FTLBS with the proof load applied.
Recent events (2)
- — I (S) $1125.00
- — Z (S) $1125.00
1926.105 A
- Issued
- Jan 21, 1994
- Abate by
- Jan 25, 1994
- Penalty
- Initial $1,125 · Current $1,125
1926.451 A03
- Issued
- Jan 21, 1994
- Abate by
- Jan 26, 1994
- Penalty
- Initial $1,125 · Current $1,125
Recent events (2)
- — I (S) $1125.00
- — Z (S) $1125.00
More inspections at Charles T. Driscoll Masonary
View Charles T. Driscoll Masonary's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in NY
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 109861773.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.