EAST GREENVILLE, PA ·
OSHA Inspection: KNOLL, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of KNOLL, INC. in 1235 WATER STREET, P.O. BOX 157, EAST GREENVILLE, PA 18041 (NAICS 000000). OSHA activity number 110049251.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- KNOLL, INC.
- Site address
- 1235 WATER STREET, P.O. BOX 157
- City
- EAST GREENVILLE
- State
- PA
- ZIP
- 18041
- Mailing
- P.O. BOX 157, EAST GREENVILLE, PA 18041
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (N)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 2521
- Employees
- 1180
- Ownership type
- Private (A)
- Industry flags
- Manufacturing safety.
Citations
58 citations on file for this inspection.
5(a)(1)
- Issued
- May 30, 1990
- Abate by
- Jun 29, 1990
- Penalty
- Initial $400 · Current $200 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to burn injuries: a) Employees in the Flat Panel Finishing Area walk and work in close proximity to the TFS Steam Tunnel. Steam pipes at 150 degrees F are uninsulated thus exposing employees injury from burns, 2/9/90. Among other methods, one feasible and acceptable method to correct this hazard. 1) Insulate pipes with material to asborb heat.
Recent events (2)
- · F (S) $200.00
- · Z (S) $400.00
5(a)(1)
- Issued
- May 30, 1990
- Abate by
- Mar 31, 1992
- Penalty
- Initial $560 · Current $280 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to serious injury from lifting tasks without effective administrative or engineering controls: a) Woodshop employees stack 48 pound wood panel veneers on a conveyor prior to the panels being placed in a hot press. The evaluation of this manual lifting task indicates that employees are exposed to an increased risk of musculoskeletal injuries in population exposed to similar lifting conditions. The injury and illness records for 1989 and employee interviews documented that there was a pattern of musculoskeletal/overexertion injuries, 2/28/90. STEP 1 - EFFECTIVE ADMINISTRATIVE PROTECTION, SUCH AS EMPLOYEE TRAINING, PHYSICAL ASSESSMENT, JOB ROTATION, ETC. SHALL BE PROVIDED AS AN INTERIM PROTECTIVE MEASURE UNTIL FEASIBLE ENGINEERING OR PERMANENT ADMINISTRATIVE CONTROLS CAN BE IMPLEMENTED WHICH WILL REDUCE EMPLOYEE EXPOSURE TO NOMINAL RISK. STEP 2 - SUBMIT TO THE AREA DIRECTOR A WRITTEN, DETAILED PLAN OF ABATEMENT OUTLINING A SCHEDULE FOR THE IMPLEMENTATION OF ENGINEERING OR ADMINISTRATIVE MEASURES TO CONTROL EMPLOYEE INJURY DUE TO MANUAL LIFTING TASKS. ENGINEERING CONTROLS TO REDUCE MUSCULOSKELETAL STRESSES INCLUDE, BUT ARE NOT LIMITED TO JOB REDESIGN, REDUCTION OF THE HORIZONTAL AND VERTICAL LOAD DISTANCE FROM THE BODY, REDUCTION OF THE LIFTING AIDS. THIS PLAN SHALL INCLUDE AT A MINIMUM, TARGET DATES FOR THE FOLLOWING ACTIONS WHICH MUST BE CONSISTENT WITH THE DATES REQUIRED BY THIS CITATION. 1) EVALUATION OF THE CONDITIONS, LOCATIONS AND MANUAL LIFTING ACTIVITIES THAT THE EMPLOYEES ARE PERFORMING AT THE ONSET OF MUSCULOSKELETAL INJURIES. 2) EVALUATION OF INSTALLATION AND OPERATION OF SELECTED CONTROL MEASURES. 3) PROCUREMENT, INSTALLATION AND OPERATION OF SELECTED CONTROL MEASURES. ALL PROPOSED CONTROL MEASURES SHALL BE APPROVED FOR EACH PARTICULAR USE BY A PERSON TRAINED IN THE EVALUATIONOF WORKPLACE CONDITIONS WHICH CAUSE MUSULOSKETETAL DISORDERS, THIRTY (30) DAY PROGRESS REPORTS ARE REQUIRED DURING THE ABATEMENT PERIOD. STEP 3 - DEVELOP A REHABILATION PROGRAM FOR INJURED WORKERS. THE PROGRAM IS EXPECTED TO INCLUDE EXERCISE, BUILDING STAMINA. TRAINING IN SAFE LIFTING TECHNIQUES, WORK CONDITIONING AND DEMONSTRATION THAT THE WORKER IS ABLE TO RESUME WORK. ABATEMENT SHALL HAVE BEEN COMPLETED BY THE IMPLEMENTATION OF FEASIBLE ENGINEERING AND/OR ADMINISTRATIVE CONTROLS. WHERE THE LIFTING TASK ANALYSES IN NIOSH'S WORK PRACTICES GUIDE FOR MANUAL LIFTING HAS BEEN UTILIZED. COMPLIANCE WILL BE ACHIEVED WHEN THE CALCULATED ACTION LEVEL IS MET. b) Assembly employees had various sized boxes of finished furniture case goods and lift the boxes from the 32 inch high bander to 4 inch high pallets on the floor. The boxes are stacked two high on the pallets and weigh 61 to 64 pounds. The evaluation of this manual lifting task indicates that employees are exposed to an increased risk of musculoskeletal injuries in populations exposed to similar lifting conditions. The injury and illness records for 1989 documented that there was a pattern of musculoskeletal/overexertion injuries, 3/6/90. STEP 1- EFFECTIVE ADMINISTRATIVE PROTECTION, SUCH AS EMPLOYEE TRAINING, PHYSICAL ASSESSMENT, JOB ROTATION, ETC. SHALL BE PROVIDED AS AN INTERIM PROTECTIVE MEASURE UNTIL FEASIBLE ENGINEERING OR PERMANENT ADMINISTRATIVE CONTROLS CAN BE IMPLEMENTED WHICH WILL REDUCE EMPLOYEE EXPOSURE TO NOMAL RISK. STEP 2- SUBMIT TO THE AREA DIRECTOR A WRITTEN, DETAILED PLAN OF ABATEMENT OUTLINING A SCHEDULE FOR THE IMPLEMENTATION OF ENGINEERING OR ADMINISTRATIVE MEASURES TO CONTROL EMPLOYEE INJURY DUE TO MANUAL LIFTING TASKS. ENGINEERING CONTROLS TO REDUCE MUSCULOSKELETAL STRESSES INCLUDE, BUT ARE NOT LIMITED TO, JOB REDESIGN, REDUCTION OF THE HORIZONTAL AND VERTICAL LOAD DISTANCE FROM THE BODY, REDUCTION OF THE LIFTING FREQUENCY OR WEIGHT, AND USE OF MECHANICAL LIFTING AIDS. THIS PLAN SHALL INCLUDE AT A MINIMUM, TARGET DATES FOR THE FOLLOWING ACTIONS WHICH MUST BE CONSISTENT WITH THE DATES REQUIRED BY THIS CITATION. 1) EVALUATION OF THE CONDITIONS, LOCATIONS AND MANUAL LIFTING ACTIVITIES THAT THE EMPLOYEES ARE PERFORMING AT THE ONSET OF MUSCULOSKELETAL INJURIES. 2) EVALUATION OF APPLICABLE CONTROL MEASURES. 3) PROCUREMENT, INSTALLATION AND OPERATION OF SELECTED CONTROL MEASURES. ALL PROPOSED CONTROL MEASURES SHALL BE APPROVED FOR EACH PARTICULAR USE BY A PERSON TRAINED IN THE EVALUATION OF WORKPLACE CONDITIONS WHICH CAUSE MUSCULOSKELETAL DISORDERS. THIRTY (30) DAY PROGRESS REPORTS ARE REQUIRED DURING THE ABATEMENT PERIOD. STEP 3- DEVELOP A REHABILATION PROGRAM FOR INJURED WORKERS. THE PROGRAM IS EXPECTED TO INCLUDE EXERCISE, BUILDING STAMINA, TRAINING IN SAFE LIFTING TECHNIQUES, WORK CONDITIONING AND DEMONSTRATION THAT THE WORKER IS ABLE TO RESUME WORK. ABATEMENT SHALL HAVE BEEN COMPLETED BY THE IMPLEMENTATION OF FEASIBLE ENGINEERING AND/OR ADMINISTRATIVE CONTROLS. WHERE THE LIFTING TASK ANALYSES IN NIOSH'S WORK PRACTICES GUIDE FOR MANUAL LIFTING HAS BEEN UTILIZED. COMPLIANCE WILL BE ACHIEVED WHEN THE CALCULATED ACTION LEVEL IS MET.
Recent events (3)
- · P (S) $280.00
- · F (S) $280.00
- · Z (S) $560.00
5(a)(1)
- Issued
- May 30, 1990
- Abate by
- Mar 31, 1992
- Penalty
- Initial $560 · Current $280 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to increased risk of developing cumulative trauma disorders from the tasks that they were performing and effective administrative or engineering controls were not provided: a) Upholstery workers in the Lubin Buildings manually stretch and tuck upholstery fabric over metal/foam chair seats and backs. The evaluation of this repetitive motion task indicates that employees are exposed to an increased risk of repetitive motion hand/wrist/arm disclosed a case of cumulative trauma disease and interviews with employees disclosed numerous symptoms of early stage disease, 3/6/90. Among other methods, one feasible and acceptable abatement method to correct this hazard is the fomulation, and implementation of a comprehensive repetitive strain injury prevention program. This program should include, at a minimum, the following elements: 1) Periodic identification of all employees with symptoms generally associated with repetitive motion disorders. This permits appropriate and timely evaluation and treatment before the symtoms disable the employee. Periodic identification should detect any significant change in the prevalence incidence, and/or location of the reported symptoms. It will also help to determine the effectiveness of the medical management and ergonomic programs. 2) Ergonomic assessment of each existing, planned, new and modified operation to identify ergonomic stressors which may be produced by the environment, tools or work methods. Ergonomic job hazard, analysis should then be routinely performed by qualified persons for operations which have been identified as putting workers at risk of developing cumulative trauma disorders of the analysis will serve to establish effective, safe job procedures, to verify low risk factors for light duty work, and to determine if risk factors (stressors) for a position have been reduced or eliminated to the extent feasible. 3) Implementation of control measures for reducing job repetiveness. The following specific methods should be consisdered at the cited operations. a) Increase frequency/diviation of rest pauses and/or job rotation. b) Increase the number of employees assigned to the task. c) Give new workers time to condition their muscle/tendon/nerve groups. 4) Implementation of control measures for reducing biomechanical forces. The following specific methods should be considered at the cited operation. a) Mechanical device (press) to force material into slot. b) Jig to position and hold work piece while fabric is applied. c) Reduce wrist flexion and palmer pressure of ice pick usage by redesigning their handles (thicker, softer, no sharp groove edges, shaped to fit palm). d) Learn chairs to reduce prolonged standing. e) Use tool to stretch fabric instead of fingers. 5) Implementation of control measures for reducing awkward postures. The following specific methods should be considered at the cited operations. a) Adjustable work table height to reduce bending at the waist. b) Angle work table to reduce the need for flexed wrist force motions. 6) Training sessions to familiarize managers, supervisors and employees with the various cumulative trauma disorders and with their causes, symptoms, prevention and treatment. Employees should be given job specific training in the types of movement and postures which can reduce the chance of cumulative trauma strains. After training proper work procedures should be monitored, feedback from employees received, adjustments made and proper proceduresenforced. 7) Medical management program for the prevention and treatment of cumulative trauma disorders should be established. The program should contain the following elements: a) A trained and available health care provider should conduct periodic systematic workplace walk through to become knowledgeable about operations and work practices, to identify potential light duty jobs and potential cumulative trauma disorders stressors. The periodic symptom survey indicated in element number one can be conducted by the health care provider. b) All new and reassigned employees who are to be assigned to jobs involving exposure to cumulative trauma should be given initial and annual health examinations. The purpose is to establish a base against which changes in health status can be evaluated not to preclude people from the job. The annual examination can detect early signs of cumulative trauma disorders so appropriate measures can be instituted so a more serious conditon can be prevented. c) New employees and employees who have returned to work after a cumulative trauma disorder should be given the opportunity to condition their muscle/tendon-nerve groups to working at capacity. This should be accomplished through slower paced lines or light duty jobs. STEP 1 - EFFECTIVE ADMINISTRATIVE PROTECTION, SUCH AS EMPLOYEE TRAINING, MEDICAL MANAGEMENT, JOB ROTATION, ETC. SHALL BE PROVIDED AS AN INTERIM PROTECTIVE MEASURE UNTIL FEASIBLE ENGINEERING OR PERMANENT ADMINISTRATIVE CONTROLS CAN BE IMPLEMENTED WHICH WILL REDUCE EMPLOYEE EXPOSURE TO NOMINAL RISK. STEP 2 - SUBMIT TO THE AREA DIRECTOR A WRITTEN, DETAILED PLAN OF ABATEMENT OUTLINING A SCHEDULE FOR THE IMPLEMENTATION OF ENGINEERING AND/OR ADMINISTRATIVE MEASURES TO CONTROL EMPLOYEE INJURY DUE TO REPETITIVE MOTION TASKS. THIS PLAN SHALL INCLUDE AT A MINIMUM, TARGET DATES FOR THE FOLLOWING ACTIONS WHICH MUST BE CONSISTENT WITH THE DATES REQUIRED BY THIS CITATION. 1) ERGONOMIC EVALUATION OF THE REPETATIVE MOTION TASKS THAT EMPLOYEES ARE PERFORMING AT THE CITED OPERATIONS. 2) EVALUATION OF APPLICABLE CONTROL MEASURES. 3) PROCUREMENT, INSTALLATION AND OPERATION OF SELECTED CONTROL MEASURES. ALL PROPOSED CONTROL MEASURES SHALL BE APPROVED FOR EACH PARTICULAR USE BY A PERSON TRAINED IN THE EVALUATION OF WORK PLACE CONDITIONS WHICH CAUSE REPETITIVE MOTION DISORDERS. (30) DAY PROGRESS REPORTS ARE REQUIRED. STEP 3 - DEVELOP A REHABILITATION PROGRAM FOR INJURED WORKERS. THE PROGRAM IS EXPECTED TO INCLUDE EXERCISE, BUILDING STAMINA. TRAINING IN SAFE LIFTING TECHNIQUES, WORK CONDITIONING AND DEMONSTRATION THAT THE WORKER IS ABLE TO RESUME WORK. ABATEMENT SHALL HAVE BEEN COMPLETED BY THE IMPLEMENTATION OF FEASIBLE ENGINEERING AND/OR AMDINISTRATIVE CONTROLS. WHERE THE LIFTING TASK ANALYSIS IN NIOSH'S WORK PRACTICES GUIDE FOR MANUAL LIFTING HAS BEEN UTILIZED, COMPLIANCE WILL BE ACHIEVED WHEN THE CALCULATED ACTION LEVEL IS MET.
Recent events (3)
- · P (S) $280.00
- · F (S) $280.00
- · Z (S) $560.00
1910.22 C
- Issued
- May 30, 1990
- Abate by
- Jun 14, 1990
- Penalty
- Initial $480 · Current $240 Reduced
Recent events (2)
- · F (S) $240.00
- · Z (S) $480.00
1910.22 C
- Issued
- May 30, 1990
- Abate by
- Jun 4, 1990
Recent events (2)
- · F (S)
- · Z (S)
1910.23 C01
- Issued
- May 30, 1990
- Abate by
- Jun 29, 1990
- Penalty
- Initial $400 · Current $200 Reduced
Recent events (2)
- · F (S) $200.00
- · Z (S) $400.00
1910.106 D04 I
- Issued
- May 30, 1990
- Abate by
- Jun 29, 1990
- Penalty
- Initial $560 · Current $280 Reduced
Recent events (2)
- · F (S) $280.00
- · Z (S) $560.00
1910.106 D04 III
- Issued
- May 30, 1990
- Abate by
- Jun 29, 1990
- Penalty
- Initial $480 · Current $240 Reduced
Recent events (2)
- · F (S) $240.00
- · Z (S) $480.00
1910.106 D04 IV
- Issued
- May 30, 1990
- Abate by
- Jun 29, 1990
- Penalty
- Initial $560 · Current $280 Reduced
Recent events (2)
- · F (S) $280.00
- · Z (S) $560.00
1910.106 E02 IVA
- Issued
- May 30, 1990
- Abate by
- Jun 4, 1990
- Penalty
- Initial $560 · Current $280 Reduced
Recent events (2)
- · F (S) $280.00
- · Z (S) $560.00
1910.184 I09 III
- Issued
- May 30, 1990
- Abate by
- Jun 4, 1990
- Penalty
- Initial $400 · Current $200 Reduced
Recent events (2)
- · F (S) $200.00
- · Z (S) $400.00
1910.212 A01
- Issued
- May 30, 1990
- Abate by
- Jun 11, 1990
- Penalty
- Initial $400 · Current $200 Reduced
Recent events (2)
- · F (S) $200.00
- · Z (S) $400.00
1910.212 A01
- Issued
- May 30, 1990
- Abate by
- Mar 1, 1991
Recent events (2)
- · F (S)
- · Z (S)
1910.212 A03 II
- Issued
- May 30, 1990
- Abate by
- Jun 29, 1990
- Penalty
- Initial $640 · Current $270 Reduced
Recent events (2)
- · F (S) $270.00
- · Z (S) $640.00
1910.212 A05
- Issued
- May 30, 1990
- Abate by
- Jun 19, 1990
- Penalty
- Initial $320 · Current $160 Reduced
Recent events (2)
- · F (S) $160.00
- · Z (S) $320.00
1910.213 B03
- Issued
- May 30, 1990
- Abate by
- Jun 25, 1990
- Penalty
- Initial $480 · Current $240 Reduced
Recent events (2)
- · F (S) $240.00
- · Z (S) $480.00
1910.213 H01
- Issued
- May 30, 1990
- Abate by
- Jun 25, 1990
- Penalty
- Initial $480 · Current $240 Reduced
Recent events (2)
- · F (S) $240.00
- · Z (S) $480.00
1910.213 H04
- Issued
- May 30, 1990
- Abate by
- Jun 25, 1990
- Penalty
- Initial $480 · Current $240 Reduced
Recent events (2)
- · F (S) $240.00
- · Z (S) $480.00
1910.213 M01
- Issued
- May 30, 1990
- Abate by
- Jun 19, 1990
- Penalty
- Initial $480 · Current $240 Reduced
Recent events (2)
- · F (S) $240.00
- · Z (S) $480.00
1910.213 M01
- Issued
- May 30, 1990
- Abate by
- Jun 19, 1990
- Penalty
- Initial $240 · Current $120 Reduced
Recent events (2)
- · F (S) $120.00
- · Z (S) $240.00
1910.215 A01
- Issued
- May 30, 1990
- Abate by
- Jun 19, 1990
- Penalty
- Initial $480 · Current $240 Reduced
Recent events (2)
- · F (S) $240.00
- · Z (S) $480.00
1910.215 B09
- Issued
- May 30, 1990
- Abate by
- Jun 14, 1990
- Penalty
- Initial $480 · Current $240 Reduced
Recent events (2)
- · F (S) $240.00
- · Z (S) $480.00
1910.219 D01
- Issued
- May 30, 1990
- Abate by
- Jun 14, 1990
- Penalty
- Initial $320 · Current $160 Reduced
Recent events (2)
- · F (S) $160.00
- · Z (S) $320.00
1910.219 E03 I
- Issued
- May 30, 1990
- Abate by
- Jun 14, 1990
Recent events (2)
- · F (S)
- · Z (S)
1910.242 B
- Issued
- May 30, 1990
- Abate by
- Jun 25, 1990
- Penalty
- Initial $400 · Current $200 Reduced
Recent events (2)
- · F (S) $200.00
- · Z (S) $400.00
1910.252 A02 IVC
- Issued
- May 30, 1990
- Abate by
- Jun 11, 1990
- Penalty
- Initial $480 · Current $240 Reduced
Recent events (2)
- · F (S) $240.00
- · Z (S) $480.00
1910.252 C01 IV
- Issued
- May 30, 1990
- Abate by
- Jun 14, 1990
- Penalty
- Initial $320 · Current $160 Reduced
Recent events (2)
- · F (S) $160.00
- · Z (S) $320.00
1910.252 C02 V
- Issued
- May 30, 1990
- Abate by
- Jun 14, 1990
- Penalty
- Initial $240 · Current $120 Reduced
Recent events (2)
- · F (S) $120.00
- · Z (S) $240.00
1910.303 B01
- Issued
- May 30, 1990
- Abate by
- Jun 19, 1990
- Penalty
- Initial $480 · Current $240 Reduced
Recent events (2)
- · F (S) $240.00
- · Z (S) $480.00
1910.303 G02 I
- Issued
- May 30, 1990
- Abate by
- Jun 4, 1990
- Penalty
- Initial $480 · Current $480
Recent events (2)
- · F (S) $480.00
- · Z (S) $480.00
1910.304 F04
- Issued
- May 30, 1990
- Abate by
- Jun 14, 1990
- Penalty
- Initial $560 · Current $280 Reduced
Recent events (2)
- · F (S) $280.00
- · Z (S) $560.00
1910.305 B01
- Issued
- May 30, 1990
- Abate by
- Jun 19, 1990
- Penalty
- Initial $400 · Current $200 Reduced
Recent events (2)
- · F (S) $200.00
- · Z (S) $400.00
1910.305 B01
- Issued
- May 30, 1990
- Abate by
- Jun 11, 1990
Recent events (2)
- · F (S)
- · Z (S)
1910.305 J01 II
- Issued
- May 30, 1990
- Abate by
- Jun 14, 1990
- Penalty
- Initial $560 · Current $280 Reduced
Recent events (2)
- · F (S) $280.00
- · Z (S) $560.00
1904.2 A
- Issued
- May 30, 1990
- Abate by
- Jun 29, 1990
- Penalty
- Initial $80 · Current $40 Reduced
Recent events (2)
- · F (O) $40.00
- · Z (O) $80.00
1904.2 A
- Issued
- May 30, 1990
- Abate by
- Jun 29, 1990
Recent events (2)
- · F (O)
- · Z (O)
1904.2 B02
- Issued
- May 30, 1990
- Abate by
- Jun 29, 1990
Recent events (2)
- · F (O)
- · Z (O)
1904.4
- Issued
- May 30, 1990
- Abate by
- Jun 29, 1990
- Penalty
- Initial $80 · Current $40 Reduced
Recent events (2)
- · F (O) $40.00
- · Z (O) $80.00
1910.23 C01
- Issued
- May 30, 1990
- Abate by
- Jun 19, 1990
Recent events (2)
- · F (O)
- · Z (O)
1910.26 C02 VII
- Issued
- May 30, 1990
- Abate by
- Jun 14, 1990
Recent events (2)
- · F (O)
- · Z (O)
1910.107 B05 I
- Issued
- May 30, 1990
- Abate by
- Jun 29, 1990
Recent events (2)
- · F (O)
- · Z (O)
1910.108 G06 I
- Issued
- May 30, 1990
- Abate by
- Jun 14, 1990
Recent events (2)
- · F (O)
- · Z (O)
1910.120 G02 VII
- Issued
- May 30, 1990
- Abate by
- Jun 29, 1990
Recent events (2)
- · F (O)
- · Z (O)
1910.120 Q03 IV
- Issued
- May 30, 1990
- Abate by
- Jun 29, 1990
Recent events (2)
- · F (O)
- · Z (O)
1910.120 Q09 I
- Issued
- May 30, 1990
- Abate by
- Jun 29, 1990
Recent events (2)
- · F (O)
- · Z (O)
1910.147 C05 IIC
- Issued
- May 30, 1990
- Abate by
- Jun 29, 1990
Recent events (2)
- · F (O)
- · Z (O)
1910.147 C07 IV
- Issued
- May 30, 1990
- Abate by
- Mar 1, 1991
Recent events (2)
- · F (O)
- · Z (O)
1910.212 A01
- Issued
- May 30, 1990
- Abate by
- Mar 1, 1991
Recent events (2)
- · F (O)
- · Z (O)
1910.212 B
- Issued
- May 30, 1990
- Abate by
- Jun 11, 1990
Recent events (2)
- · F (O)
- · Z (O)
1910.215 A04
- Issued
- May 30, 1990
- Abate by
- Jun 19, 1990
Recent events (2)
- · F (O)
- · Z (O)
1910.219 C02 I
- Issued
- May 30, 1990
- Abate by
- Jun 29, 1990
Recent events (2)
- · F (O)
- · Z (O)
1910.303 B01
- Issued
- May 30, 1990
- Abate by
- Jun 11, 1990
Recent events (2)
- · F (O)
- · Z (O)
1910.305 B01
- Issued
- May 30, 1990
- Abate by
- Jun 14, 1990
Recent events (2)
- · F (O)
- · Z (O)
1910.305 B02
- Issued
- May 30, 1990
- Abate by
- Jun 14, 1990
Recent events (2)
- · F (O)
- · Z (O)
1910.305 G01 III
- Issued
- May 30, 1990
- Abate by
- Jun 19, 1990
Recent events (2)
- · F (O)
- · Z (O)
1910.305 G02 II
- Issued
- May 30, 1990
- Abate by
- Jun 4, 1990
Recent events (2)
- · F (O)
- · Z (O)
1910.305 G02 III
- Issued
- May 30, 1990
- Abate by
- Jun 11, 1990
Recent events (2)
- · F (O)
- · Z (O)
1910.1200 H
- Issued
- May 30, 1990
- Abate by
- Jun 29, 1990
Recent events (2)
- · F (O)
- · Z (O)
More inspections at Knoll, INC.
View Knoll, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 110049251.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.