BETHLEHEM, PA ·
OSHA Inspection: APOLLO METALS LTD.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of APOLLO METALS LTD. in 1001 14TH AVE., BETHLEHEM, PA 18018 (NAICS 000000). OSHA activity number 123260291.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- APOLLO METALS LTD.
- Site address
- 1001 14TH AVE.
- City
- BETHLEHEM
- State
- PA
- ZIP
- 18018
- Mailing
- P.O. BOX 4045, BETHLEHEM, PA 18018
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Union (Y)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 3471
- Employees
- 143
- Ownership type
- Private (A)
- Industry flags
- Manufacturing safety.
Citations
36 citations on file for this inspection.
5(a)(1)
- Issued
- Apr 16, 1993
- Abate by
- Apr 26, 1993
- Penalty
- Initial $1,100 · Current $660 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to hazard of being struck by falling load in the event of lifting device failure: a) Paper Slitting Area - Employees used two gates hi-power II v-belts as lifting devices to attach paper rolls up to 28" wide to the hook of an overhead hoist. No rolls were then hoisted onto the paper slitter using the v-belts as slings. Employees were thus exposed to injury in the event of v-belt failure resulting from v-belts being used in a manner for which they were not designed, condition last existed about January 1993. Among others, one feasible and acceptable abatement method to abate the hazard is to discontinue use of v-belts in this manner and to supply proper slings to perform the job.
Recent events (2)
- · I (S) $660.00
- · Z (S) $1100.00
1910.23 C03
- Issued
- Apr 16, 1993
- Abate by
- May 10, 1993
- Penalty
- Initial $1,100 · Current $660 Reduced
Recent events (2)
- · I (S) $660.00
- · Z (S) $1100.00
1910.106 E02 IIB2
- Issued
- Apr 16, 1993
- Abate by
- Apr 26, 1993
- Penalty
- Initial $1,375 · Current $825 Reduced
Recent events (2)
- · I (S) $825.00
- · Z (S) $1375.00
1910.108 F02
- Issued
- Apr 16, 1993
- Abate by
- Apr 29, 1993
- Penalty
- Initial $1,925 · Current $1,155 Reduced
Recent events (2)
- · I (S) $1155.00
- · Z (S) $1925.00
1910.108 F02
- Issued
- Apr 16, 1993
- Abate by
- Apr 29, 1993
1910.120 Q02
- Issued
- Apr 16, 1993
- Abate by
- Jul 1, 1993
- Penalty
- Initial $1,375 · Current $825 Reduced
Recent events (2)
- · I (S) $825.00
- · Z (S) $1375.00
1910.120 Q06
- Issued
- Apr 16, 1993
- Abate by
- Jul 1, 1993
- Penalty
- Initial $1,375 · Current $825 Reduced
Recent events (2)
- · I (S) $825.00
- · Z (S) $1375.00
1910.120 Q11 II
- Issued
- Apr 16, 1993
- Abate by
- Jul 1, 1993
- Penalty
- Initial $1,375 · Current $825 Reduced
Recent events (2)
- · I (S) $825.00
- · Z (S) $1375.00
1910.134 E05
- Issued
- Apr 16, 1993
- Abate by
- Jul 1, 1993
Recent events (2)
- · I (S)
- · Z (S)
1910.134 F02 II
- Issued
- Apr 16, 1993
- Abate by
- Jul 1, 1993
Recent events (2)
- · I (S)
- · Z (S)
1910.134 F02 IV
- Issued
- Apr 16, 1993
- Abate by
- Jul 1, 1993
Recent events (2)
- · I (S)
- · Z (S)
1910.147 C04 II
- Issued
- Apr 16, 1993
- Abate by
- Jul 1, 1993
- Penalty
- Initial $1,925 · Current $1,155 Reduced
Recent events (2)
- · I (S) $1155.00
- · Z (S) $1925.00
1910.147 C06 I
- Issued
- Apr 16, 1993
- Abate by
- Jul 1, 1993
Recent events (2)
- · I (S)
- · Z (S)
1910.147 C07 I
- Issued
- Apr 16, 1993
- Abate by
- Jul 1, 1993
- Penalty
- Initial $1,925 · Current $1,155 Reduced
Recent events (2)
- · I (S) $1155.00
- · Z (S) $1925.00
1910.147 D03
- Issued
- Apr 16, 1993
- Abate by
- Jul 1, 1993
- Penalty
- Initial $1,925 · Current $1,155 Reduced
Recent events (2)
- · I (S) $1155.00
- · Z (S) $1925.00
1910.147 D04 I
- Issued
- Apr 16, 1993
- Abate by
- Jul 1, 1993
- Penalty
- Initial $1,925 · Current $1,155 Reduced
Recent events (2)
- · I (S) $1155.00
- · Z (S) $1925.00
1910.147 E03
- Issued
- Apr 16, 1993
- Abate by
- Jul 1, 1993
- Penalty
- Initial $1,925 · Current $1,155 Reduced
Recent events (2)
- · I (S) $1155.00
- · Z (S) $1925.00
1910.147 F04
- Issued
- Apr 16, 1993
- Abate by
- Jul 1, 1993
Recent events (2)
- · I (S)
- · Z (S)
1910.147 F03 I
- Issued
- Apr 16, 1993
- Abate by
- Jul 1, 1993
- Penalty
- Initial $1,100 · Current $660 Reduced
Recent events (2)
- · I (S) $660.00
- · Z (S) $1100.00
1910.212 A03 II
- Issued
- Apr 16, 1993
- Abate by
- May 26, 1993
- Penalty
- Initial $1,100 · Current $660 Reduced
Recent events (2)
- · I (S) $660.00
- · Z (S) $1100.00
1910.213 C03
- Issued
- Apr 16, 1993
- Abate by
- Apr 29, 1993
- Penalty
- Initial $1,375 · Current $825 Reduced
Recent events (2)
- · I (S) $825.00
- · Z (S) $1375.00
1910.215 B09
- Issued
- Apr 16, 1993
- Abate by
- Apr 21, 1993
- Penalty
- Initial $825 · Current $495 Reduced
Recent events (2)
- · I (S) $495.00
- · Z (S) $825.00
1910.217 C02 IA
- Issued
- Apr 16, 1993
- Abate by
- May 19, 1993
- Penalty
- Initial $1,100 · Current $660 Reduced
Recent events (2)
- · I (S) $660.00
- · Z (S) $1100.00
1910.217 C03 VIIIC
- Issued
- Apr 16, 1993
- Abate by
- May 3, 1993
- Penalty
- Initial $1,375
Recent events (2)
- · I (S)
- · Z (S) $1375.00
1910.305 D
- Issued
- Apr 16, 1993
- Abate by
- Apr 26, 1993
- Penalty
- Initial $1,375 · Current $825 Reduced
Recent events (2)
- · I (S) $825.00
- · Z (S) $1375.00
1910.305 G02 III
- Issued
- Apr 16, 1993
- Abate by
- Apr 26, 1993
- Penalty
- Initial $1,100 · Current $660 Reduced
Recent events (2)
- · I (S) $660.00
- · Z (S) $1100.00
1910.334 A02 I
- Issued
- Apr 16, 1993
- Abate by
- May 3, 1993
Recent events (2)
- · I (S)
- · Z (S)
1910.333 B02 I
- Issued
- Apr 16, 1993
- Abate by
- Jul 1, 1993
- Penalty
- Initial $1,375 · Current $825 Reduced
Recent events (2)
- · I (S) $825.00
- · Z (S) $1375.00
1910.23 D01 III
- Issued
- Apr 16, 1993
- Abate by
- May 10, 1993
1910.27 B01 III
- Issued
- Apr 16, 1993
- Abate by
- May 19, 1993
1910.27 B07 I
- Issued
- Apr 16, 1993
- Abate by
- May 19, 1993
Recent events (2)
- · I (O)
- · Z (O)
1910.27 D02 II
- Issued
- Apr 16, 1993
- Abate by
- May 19, 1993
Recent events (2)
- · I (O)
- · Z (O)
1910.27 F
- Issued
- Apr 16, 1993
- Abate by
- May 19, 1993
1910.37 K02
- Issued
- Apr 16, 1993
- Abate by
- Apr 26, 1993
1910.303 B02
- Issued
- Apr 16, 1993
- Abate by
- May 4, 1993
1910.305 G01 III
- Issued
- Apr 16, 1993
- Abate by
- May 4, 1993
More inspections at Apollo Metals LTD.
View Apollo Metals LTD.'s full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 123260291.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.