At a glance
On , OSHA opened a planned health inspection of OCCIDENTAL CHEMICAL CORPORATION in 375 ARMAND HAMMER BOULEVARD, POTTSTOWN, PA 19464 (NAICS 000000). OSHA activity number 123260515.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- OCCIDENTAL CHEMICAL CORPORATION
- Site address
- 375 ARMAND HAMMER BOULEVARD
- City
- POTTSTOWN
- State
- PA
- ZIP
- 19464
- Mailing
- P.O. BOX 699, POTTSTOWN, PA 19464
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Health
- Advance notice
- No
- Union status
- Union (Y)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 2821
- Employees
- 480
- Ownership type
- Private (A)
Citations
118 citations on file for this inspection.
1910.36 B02
- Issued
- Sep 21, 1993
- Abate by
- Oct 25, 1993
- Penalty
- Initial $2,500 · Current $1,500 Reduced
Recent events (2)
- · I (S) $1500.00
- · Z (S) $2500.00
1910.119 C01
- Issued
- Sep 21, 1993
- Abate by
- Nov 30, 1993
- Penalty
- Initial $1,500 · Current $2,500
Recent events (2)
- · I (S) $2500.00
- · Z (S) $1500.00
1910.119 C02
- Issued
- Sep 21, 1993
- Abate by
- Nov 30, 1993
- Penalty
- Initial $2,500
Recent events (2)
- · I (S)
- · Z (S) $2500.00
1910.119 D02 I
- Issued
- Sep 21, 1993
- Abate by
- Dec 31, 1993
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- · I (S) $2500.00
- · Z (S) $2500.00
1910.119 E03 VI
- Issued
- Sep 21, 1993
- Abate by
- Mar 31, 1994
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- · I (S) $2500.00
- · Z (S) $2500.00
1910.119 E03 V
- Issued
- Sep 21, 1993
- Abate by
- Mar 31, 1994
- Penalty
- Initial $2,500
Recent events (2)
- · I (S)
- · Z (S) $2500.00
1910.119 E05
- Issued
- Sep 21, 1993
- Abate by
- Oct 25, 1993
- Penalty
- Initial $2,500 · Current $1,500 Reduced
Recent events (2)
- · I (S) $1500.00
- · Z (S) $2500.00
1910.119 E05
- Issued
- Sep 21, 1993
- Abate by
- Mar 31, 1994
Recent events (2)
- · I (S)
- · Z (S)
1910.119 F01
- Issued
- Sep 21, 1993
- Abate by
- Mar 1, 1994
- Penalty
- Initial $5,000 · Current $3,000 Reduced
Recent events (2)
- · I (S) $3000.00
- · Z (S) $5000.00
1910.119 F03
- Issued
- Sep 21, 1993
- Abate by
- Mar 1, 1994
Recent events (2)
- · I (S)
- · Z (S)
1910.119 F03
- Issued
- Sep 21, 1993
- Abate by
- Mar 1, 1994
Recent events (2)
- · I (S)
- · Z (S)
1910.119 F01 IB
- Issued
- Sep 21, 1993
- Abate by
- Mar 1, 1994
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- · I (S) $2500.00
- · Z (S) $2500.00
1910.119 F01 IC
- Issued
- Sep 21, 1993
- Abate by
- Mar 1, 1994
Recent events (2)
- · I (S)
- · Z (S)
1910.119 F01 IC
- Issued
- Sep 21, 1993
- Abate by
- Mar 1, 1994
Recent events (2)
- · I (S)
- · Z (S)
1910.119 F01 IE
- Issued
- Sep 21, 1993
- Abate by
- Mar 1, 1994
Recent events (2)
- · I (S)
- · Z (S)
1910.119 F01 II
- Issued
- Sep 21, 1993
- Abate by
- Mar 1, 1994
- Penalty
- Initial $2,500
Recent events (2)
- · I (S)
- · Z (S) $2500.00
1910.119 F01 IIIB
- Issued
- Sep 21, 1993
- Abate by
- Mar 1, 1994
- Penalty
- Initial $1,500 · Current $2,000
Recent events (2)
- · I (S) $2000.00
- · Z (S) $1500.00
1910.119 F01 IV
- Issued
- Sep 21, 1993
- Abate by
- Mar 1, 1994
- Penalty
- Initial $2,500
Recent events (2)
- · I (S)
- · Z (S) $2500.00
1910.119 G01 I
- Issued
- Sep 21, 1993
- Abate by
- Jan 15, 1994
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- · I (S) $2500.00
- · Z (S) $2500.00
1910.119 G01 I
- Issued
- Sep 21, 1993
- Abate by
- Jan 15, 1994
Recent events (2)
- · I (S)
- · Z (S)
1910.119 G02
- Issued
- Sep 21, 1993
- Abate by
- Nov 30, 1993
- Penalty
- Initial $2,500
Recent events (2)
- · I (S)
- · Z (S) $2500.00
1910.119 H02 II
- Issued
- Sep 21, 1993
- Abate by
- Feb 1, 1994
- Penalty
- Initial $2,500 · Current $1,250 Reduced
Recent events (2)
- · I (S) $1250.00
- · Z (S) $2500.00
1910.119 H02 III
- Issued
- Sep 21, 1993
- Abate by
- Feb 1, 1994
Recent events (2)
- · I (S)
- · Z (S)
1910.119 H02 IV
- Issued
- Sep 21, 1993
- Abate by
- Feb 1, 1994
Recent events (2)
- · I (S)
- · Z (S)
1910.119 H02 V
- Issued
- Sep 21, 1993
- Abate by
- Dec 31, 1993
- Penalty
- Initial $2,500 · Current $1,500 Reduced
Recent events (2)
- · I (S) $1500.00
- · Z (S) $2500.00
1910.119 J02
- Issued
- Sep 21, 1993
- Abate by
- Mar 31, 1995
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- · I (S) $2500.00
- · Z (S) $2500.00
1910.119 J03
- Issued
- Sep 21, 1993
- Abate by
- Mar 31, 1995
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- · I (S) $2500.00
- · Z (S) $2500.00
1910.119 J04 I
- Issued
- Sep 21, 1993
- Abate by
- Mar 31, 1995
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- · I (S) $2500.00
- · Z (S) $2500.00
1910.119 J04 II
- Issued
- Sep 21, 1993
- Abate by
- Mar 31, 1995
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- · I (S) $2500.00
- · Z (S) $2500.00
1910.119 J04 III
- Issued
- Sep 21, 1993
- Abate by
- Mar 31, 1995
- Penalty
- Initial $5,000 · Current $5,000
Recent events (2)
- · I (S) $5000.00
- · Z (S) $5000.00
1910.119 J04 III
- Issued
- Sep 21, 1993
- Abate by
- Mar 31, 1995
Recent events (2)
- · I (S)
- · Z (S)
1910.119 J04 IV
- Issued
- Sep 21, 1993
- Abate by
- Mar 31, 1995
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- · I (S) $2500.00
- · Z (S) $2500.00
1910.119 J05
- Issued
- Sep 21, 1993
- Abate by
- Mar 31, 1995
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- · I (S) $2500.00
- · Z (S) $2500.00
1910.119 L01
- Issued
- Sep 21, 1993
- Abate by
- Dec 31, 1993
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- · I (S) $2500.00
- · Z (S) $2500.00
1910.119 G03
- Issued
- Sep 21, 1993
- Abate by
- Dec 31, 1993
Recent events (2)
- · I (S)
- · Z (S)
1910.119 M05
- Issued
- Sep 21, 1993
- Abate by
- Dec 31, 1993
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- · I (S) $2500.00
- · Z (S) $2500.00
1910.119 M05
- Issued
- Sep 21, 1993
- Abate by
- Dec 31, 1993
Recent events (2)
- · I (S)
- · Z (S)
1910.119 M06
- Issued
- Sep 21, 1993
- Abate by
- Dec 31, 1993
- Penalty
- Initial $2,500
Recent events (2)
- · I (S)
- · Z (S) $2500.00
1910.132 A
- Issued
- Sep 21, 1993
- Abate by
- Mar 31, 1994
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- · I (S) $2500.00
- · Z (S) $2500.00
1910.134 E05 I
- Issued
- Sep 21, 1993
- Abate by
- Sep 29, 1993
- Penalty
- Initial $2,500 · Current $1,000 Reduced
2580
Recent events (2)
- · I (O) $1000.00
- · Z (S) $2500.00
1910.146 C05 IIC
- Issued
- Sep 21, 1993
- Abate by
- Sep 29, 1993
- Penalty
- Initial $2,500 · Current $1,500 Reduced
Recent events (2)
- · I (S) $1500.00
- · Z (S) $2500.00
1910.146 D04 IV
- Issued
- Sep 21, 1993
- Abate by
- Sep 29, 1993
- Penalty
- Initial $2,500
Recent events (2)
- · I (O)
- · Z (S) $2500.00
1910.147 F03 IID
- Issued
- Sep 21, 1993
- Abate by
- Sep 29, 1993
- Penalty
- Initial $2,000 · Current $1,000 Reduced
Recent events (2)
- · I (O) $1000.00
- · Z (S) $2000.00
1910.147 C05 IID
- Issued
- Sep 21, 1993
- Abate by
- Sep 29, 1993
Recent events (2)
- · I (O)
- · Z (S)
1910.159 C02
- Issued
- Sep 21, 1993
- Abate by
- Oct 25, 1993
- Penalty
- Initial $2,500
Recent events (2)
- · I (S)
- · Z (S) $2500.00
1910.242 B
- Issued
- Sep 21, 1993
- Abate by
- Sep 29, 1993
- Penalty
- Initial $2,500 · Current $2,500
1910.1017 C01
- Issued
- Sep 21, 1993
- Abate by
- Jan 21, 1994
- Penalty
- Initial $2,500
2580
Recent events (2)
- · I (S)
- · Z (S) $2500.00
1910.107 C02
- Issued
- Sep 21, 1993
- Abate by
- Jan 31, 1995
- Penalty
- Current $1,250
2580
Recent events (3)
- · P (S) $1250.00
- · I (S) $1250.00
- · Z (S)
1910.1017 F01
- Issued
- Sep 21, 1993
- Abate by
- Jan 31, 1995
2580
Recent events (3)
- · P (S)
- · I (S)
- · Z (S)
1910.1017 F03
- Issued
- Sep 21, 1993
- Abate by
- Mar 31, 1994
2580
Recent events (2)
- · I (S)
- · Z (S)
1910.1017 G01
- Issued
- Sep 21, 1993
- Abate by
- Sep 29, 1993
- Penalty
- Initial $5,000 · Current $5,000
2580
1910.1017 H01 II
- Issued
- Sep 21, 1993
- Abate by
- Sep 24, 1993
- Penalty
- Initial $1,500 · Current $1,500
2580
1910.20 E01 IIIA
- Issued
- Sep 21, 1993
- Abate by
- Sep 29, 1993
- Penalty
- Initial $1,000 · Current $500 Reduced
Recent events (2)
- · I (O) $500.00
- · Z (O) $1000.00
1910.119 F01
- Issued
- Sep 21, 1993
- Abate by
- Oct 25, 1993
1910.119 F02
- Issued
- Sep 21, 1993
- Abate by
- Sep 24, 1993
1910.134 E05 I
- Issued
- Sep 21, 1993
- Abate by
- Oct 8, 1993
1910.134 E05 II
- Issued
- Sep 21, 1993
- Abate by
- Dec 15, 1993
Recent events (2)
- · I (O)
- · Z (O)
1910.146 D08
- Issued
- Sep 21, 1993
- Abate by
- Nov 30, 1993
Recent events (2)
- · I (O)
- · Z (O)
1910.147 C04 II
- Issued
- Sep 21, 1993
- Abate by
- Oct 25, 1993
1910.158 E02 III
- Issued
- Sep 21, 1993
- Abate by
- Oct 25, 1993
Recent events (2)
- · I (O)
- · Z (O)
1926.58 F02 I
- Issued
- Sep 21, 1993
- Abate by
- Sep 24, 1993
9020
5(a)(1)
- Issued
- Jun 11, 1993
- Abate by
- Jul 14, 1993
- Penalty
- Initial $2,125 · Current $2,125
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to a crushing hazard from a falling load: a) Number Four (4) Skimmer House - A continuous splice sling was made from a 1/2 inch wire rope. The splice was with two (2) wire rope clips and the wire rope was run through two (2) eye bolts on top of the spinner motor, on or about April 6, 1993. Among other methods, one feasible and acceptable abatement method to correct this hazard is to only use manufactured slings when hoisting equipment and not pull on the sides of eye bolts.
Recent events (2)
- · I (S) $2125.00
- · Z (S) $2125.00
5(a)(1)
- Issued
- Jun 11, 1993
- Abate by
- Jul 14, 1993
- Penalty
- Initial $2,125
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to a crushing hazard from a falling hopper because of rigging failure: a) Silo, Line 11 Derrick Screen - The large steel hopper was suspended by four (4) 1/2 inch wire ropes. There field fabricated slings only had two (2) wire rope clips per eye and some of them were on backwards. These slings were connected to shoulderless eye bolts and the slings were pulling on the side of the eye bolt, on or about April 14, 1993. Among other methods, one feasible and acceptable abatement method to correct this hazard is to use the proper amount of wire rope clips (3 each for 1/2 inch wire rope) on each eye and place the saddle on the line end of the rope. The eye bolts used should be the shoulder type.
Recent events (2)
- · I (S)
- · Z (S) $2125.00
5(a)(1)
- Issued
- Jun 11, 1993
- Abate by
- Jul 14, 1993
- Penalty
- Initial $2,125
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to multiple serious upper body injuries from a falling reactor flusher: a) Building One, Reactor Floor - The reactor flushing unit was hoisted by placing the hoist hook through a eye that was formed by bending a piece of "all thread". This connection was backed up by a piece of 1/4 inch steel chain that was held together by a bolt, on or about April 5, 1993. Among other methods, one feasible and acceptable abatement method to correct this hazard is to only use drop forged eyes when hoisting by the ey, never use a bolt as a fastener for a chain sling and only use alloy steel chain.
Recent events (2)
- · I (S)
- · Z (S) $2125.00
5(a)(1)
- Issued
- Jun 11, 1993
- Abate by
- Jun 18, 1993
- Penalty
- Initial $2,125 · Current $2,125
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to a potential 45 foot fall hazard if the main boom pin shears: a) Occidental Chemical - The grease fitting on the right side of the main boom pivot pin was broken and the bushing on that side of the pin was smashed out of round. Lack of lubrication will cause the main boom pivot pin to shear. Exposing employees to a maximum 45 foot fall hazard, on or about March 30, 1993. Among other methods, one feasible and acceptable abatement method to correct this hazard is to follow the manufacturer recommendation of lubricating the two (2) lubrication points on the main boom pivot pin every 10 hours of use.
5(a)(1)
- Issued
- Jun 11, 1993
- Abate by
- Jul 14, 1993
- Penalty
- Initial $2,125
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to a crushing hazard from the crane tipping over: a) Clarifier Tank, North End, Surface Water - The employee was hoisted in a work platform that was suspended from a 15 ton hydraulic grove crane, serial number 34710. The platform was lowered into a 15 foot deep clarifier tank to cut blades off the rotating shaft, on or about March 30, 1993. Among other methods, one feasible and acceptable abatement method to correct this hazard is to follow the crane and derrick suspended personnel platform standard contained in 29 CFR 1926.550(g)(1)-(8).
Recent events (2)
- · I (S)
- · Z (S) $2125.00
1910.23 C01
- Issued
- Jun 11, 1993
- Abate by
- Jun 29, 1993
- Penalty
- Initial $1,275 · Current $1,275
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to a twelve (12) foot, eight (8) inch fall hazard. a) The Hi-Jacker telescoping work platform, number 836-5, was 12 feet, 8 inches high and the chain mid rail was missing on 836.7. There was no mid rail on the 12 foot, eight inch high platform, the wire rope used to hoist the platform was very rusty, smashed from not properly wrapping it on the drum and the wire rope end that holds the rope on the drum had slipped very close to the end of the rope and a clip was not used on the drum to secure the hoist rope, on or about April 6, 1993. Among other methods, one feasible and acceptable abatement method to correct this hazard is to install proper railing, replace the hoist rope and properly fasten the hoist rope to the drum.
Recent events (2)
- · I (S) $1275.00
- · Z (S) $1275.00
5(a)(1)
- Issued
- Jun 11, 1993
- Abate by
- Jun 18, 1993
- Penalty
- Initial $2,125 · Current $2,125
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of fluid injection into the spray painters body: a) The Binks and Graco airless spray guns were used to spray latex paint and no tip guard was used. Exposing employees to a injection wound, on or about April 15, 1993. Among other methods, one feasible and acceptable abatement method to correct this hazard is to install tip guard.
1910.23 B01 I
- Issued
- Jun 11, 1993
- Abate by
- Jun 18, 1993
- Penalty
- Initial $2,125 · Current $2,125
1910.23 C01
- Issued
- Jun 11, 1993
- Abate by
- Jul 14, 1993
- Penalty
- Initial $1,700 · Current $850 Reduced
Recent events (2)
- · I (S) $850.00
- · Z (S) $1700.00
1910.23 C03
- Issued
- Jun 11, 1993
- Abate by
- Jul 14, 1993
- Penalty
- Initial $2,125
Recent events (2)
- · I (S)
- · Z (S) $2125.00
1910.37 B03
- Issued
- Jun 11, 1993
- Abate by
- Oct 30, 1993
- Penalty
- Initial $2,125 · Current $2,125
Recent events (2)
- · I (S) $2125.00
- · Z (S) $2125.00
1910.37 G02
- Issued
- Jun 11, 1993
- Abate by
- Jul 14, 1993
- Penalty
- Initial $2,125 · Current $2,125
1910.95 G06
- Issued
- Jun 11, 1993
- Abate by
- Jun 29, 1993
- Penalty
- Initial $1,275
8111
Recent events (2)
- · I (O)
- · Z (S) $1275.00
1910.132 A
- Issued
- Jun 11, 1993
- Abate by
- Jun 29, 1993
- Penalty
- Initial $1,275 · Current $800 Reduced
Recent events (2)
- · I (S) $800.00
- · Z (S) $1275.00
1910.134 F01
- Issued
- Jun 11, 1993
- Abate by
- Jun 18, 1993
- Penalty
- Initial $2,125 · Current $2,125
1910.134 F02 I
- Issued
- Jun 11, 1993
- Abate by
- Jun 29, 1993
1910.134 F02 IV
- Issued
- Jun 11, 1993
- Abate by
- Jun 29, 1993
1910.176 B
- Issued
- Jun 11, 1993
- Abate by
- Jun 18, 1993
- Penalty
- Initial $1,700
Recent events (2)
- · I (O)
- · Z (S) $1700.00
1910.212 A03 II
- Issued
- Jun 11, 1993
- Abate by
- Jun 18, 1993
- Penalty
- Initial $1,700 · Current $1,700
1910.212 A05
- Issued
- Jun 11, 1993
- Abate by
- Jul 14, 1993
- Penalty
- Initial $1,700 · Current $1,700
1910.215 B09
- Issued
- Jun 11, 1993
- Abate by
- Jun 18, 1993
- Penalty
- Initial $1,700 · Current $1,700
1910.219 F03
- Issued
- Jun 11, 1993
- Abate by
- Jul 14, 1993
- Penalty
- Initial $2,125 · Current $2,125
1910.253 B04 III
- Issued
- Jun 11, 1993
- Abate by
- Jun 18, 1993
- Penalty
- Initial $1,275 · Current $1,275
1910.303 B01
- Issued
- Jun 11, 1993
- Abate by
- Jun 29, 1993
- Penalty
- Initial $2,125 · Current $2,125
1910.303 B02
- Issued
- Jun 11, 1993
- Abate by
- Jun 29, 1993
- Penalty
- Initial $2,125 · Current $2,125
1910.332 B01
- Issued
- Jun 11, 1993
- Abate by
- Sep 30, 1993
Recent events (2)
- · I (S)
- · Z (S)
1910.303 G02 I
- Issued
- Jun 11, 1993
- Abate by
- Jun 18, 1993
- Penalty
- Initial $2,125 · Current $2,125
1910.304 A02
- Issued
- Jun 11, 1993
- Abate by
- Jun 18, 1993
- Penalty
- Initial $2,125 · Current $2,125
1910.304 F04
- Issued
- Jun 11, 1993
- Abate by
- Jun 29, 1993
- Penalty
- Initial $2,125 · Current $2,125
1910.305 B02
- Issued
- Jun 11, 1993
- Abate by
- Jun 18, 1993
- Penalty
- Initial $2,125 · Current $2,125
1910.305 B02
- Issued
- Jun 11, 1993
- Abate by
- Jun 18, 1993
1910.305 J04 IVA
- Issued
- Jun 11, 1993
- Abate by
- Jun 18, 1993
- Penalty
- Initial $2,125 · Current $2,125
1910.307 B
- Issued
- Jun 11, 1993
- Abate by
- Jun 18, 1993
- Penalty
- Initial $1,700 · Current $700 Reduced
Recent events (2)
- · I (S) $700.00
- · Z (S) $1700.00
1910.1001 K01
- Issued
- Jun 11, 1993
- Abate by
- Jun 18, 1993
- Penalty
- Initial $1,700
Recent events (2)
- · I (O)
- · Z (S) $1700.00
1910.1200 F05 I
- Issued
- Jun 11, 1993
- Abate by
- Jun 18, 1993
- Penalty
- Initial $1,700 · Current $850 Reduced
Recent events (2)
- · I (S) $850.00
- · Z (S) $1700.00
1910.1200 F05 II
- Issued
- Jun 11, 1993
- Abate by
- Jun 18, 1993
1910.1200 F08
- Issued
- Jun 11, 1993
- Abate by
- Jun 18, 1993
1904.2 A
- Issued
- Jun 11, 1993
- Abate by
- Jun 29, 1993
- Penalty
- Initial $5,000 · Current $4,000 Reduced
Recent events (3)
- · F (R) $4000.00
- · I (R) $4000.00
- · Z (R) $5000.00
1910.22 A01
- Issued
- Jun 11, 1993
- Abate by
- Jul 14, 1993
- Penalty
- Initial $850 · Current $425 Reduced
Recent events (2)
- · I (O) $425.00
- · Z (O) $850.00
1910.22 A02
- Issued
- Jun 11, 1993
- Abate by
- Jul 14, 1993
- Penalty
- Initial $850 · Current $425 Reduced
Recent events (2)
- · I (O) $425.00
- · Z (O) $850.00
1910.23 C01
- Issued
- Jun 11, 1993
- Abate by
- Jul 14, 1993
- Penalty
- Initial $850 · Current $425 Reduced
Recent events (2)
- · I (O) $425.00
- · Z (O) $850.00
1910.23 D01 II
- Issued
- Jun 11, 1993
- Abate by
- Jun 29, 1993
- Penalty
- Initial $850 · Current $425 Reduced
Recent events (2)
- · I (O) $425.00
- · Z (O) $850.00
1910.27 B01 II
- Issued
- Jun 11, 1993
- Abate by
- Jul 14, 1993
1910.27 B01 III
- Issued
- Jun 11, 1993
- Abate by
- Jul 14, 1993
1910.27 C04
- Issued
- Jun 11, 1993
- Abate by
- Jul 14, 1993
1910.95 M02 IIE
- Issued
- Jun 11, 1993
- Abate by
- Jul 14, 1993
8111
1910.151 C
- Issued
- Jun 11, 1993
- Abate by
- Jun 18, 1993
1910.215 A04
- Issued
- Jun 11, 1993
- Abate by
- Jun 18, 1993
1910.303 B02
- Issued
- Jun 11, 1993
- Abate by
- Jul 14, 1993
1910.303 C
- Issued
- Jun 11, 1993
- Abate by
- Jun 18, 1993
1910.305 B01
- Issued
- Jun 11, 1993
- Abate by
- Jul 14, 1993
1910.305 G01 III
- Issued
- Jun 11, 1993
- Abate by
- Jul 14, 1993
1910.303 G02 I
- Issued
- Jun 11, 1993
- Abate by
- Jun 18, 1993
1910.305 G02 III
- Issued
- Jun 11, 1993
- Abate by
- Jun 16, 1993
1910.1200 F05 I
- Issued
- Jun 11, 1993
- Abate by
- Jun 18, 1993
1910.1200 F05 II
- Issued
- Jun 11, 1993
- Abate by
- Jun 18, 1993
1910.1200 G01
- Issued
- Jun 11, 1993
- Abate by
- Jun 29, 1993
More inspections at Occidental Chemical Corporation
View Occidental Chemical Corporation's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 123260515.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.