TEMPLE, TX —
OSHA Inspection: ARTCO-BELL CORPORATION
Complaint inspection · Health discipline
At a glance
On , OSHA opened a complaint health inspection of ARTCO-BELL CORPORATION in 2204 NORTH GENERAL BRUCE DR, TEMPLE, TX 76503 (NAICS 000000). OSHA activity number 300438462.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ARTCO-BELL CORPORATION
- Site address
- 2204 NORTH GENERAL BRUCE DR
- City
- TEMPLE
- State
- TX
- ZIP
- 76503
- Mailing
- PO BOX 608, TEMPLE, TX 76503
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 3999
- Employees
- 50
- Ownership type
- A
Citations
1 citation on file for this inspection.
5(a)(1)
- Issued
- Sep 9, 1998
- Abate by
- Sep 15, 1998
- Penalty
- Initial $2,500 · Current $1,500 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to excessive levels of heat stress during the performance of their duties working on the paint lines and drying area. (a) The Wet Bulb Globe Temperature (WBGT) index in the paint line drying area on July 22,1998 ranged from 9703$F to greater than 91$F during the 2 hour 10 minute sampling period. Such exposure(s) may lead to the development of serious heat induced illness(es), such as heat stroke, heat exhaustion, heat cramps, heat syncope, heat rash and transient heat fatigue. (b) The estimated metabolic workload for employees on the paint line put them in the "moderate" workload category as correlated with the guidelines established by the American Conference of Governmental Industrial Hygienists (ACGIH) and the National Institute for Occupational Safety and Health (NIOSH). The paint line crew is responsible for hanging and unhanging items to be painted. Means of feasible abatement include, but may not be limited to: 1) Establishment of provisions for a work/rest regimen so that exposure time to high temperatures is decreased and/or the work rate is decreased. 2) Development of a formal heat stress program which incorporates: (a) a training program informing employees about the effects of heat stress, symptoms of heat-induced illnesses, and prevention of heat-induced illnesses; (b) use of heat stress instruments to monitor the work environment; (c) an acclimation program for new employees and employees returning from periods of absence of three or more days; (d) a screening program to identify health conditions aggravated by elevated temperatures; (e) provisions for providing cool drinking water and/or electrolytes; and, (f) provisions to provide rest areas with cooler temperatures.
Recent events (2)
- — I (S) $1500.00
- — Z (S) $2500.00
More inspections at Artco-Bell Corporation
View Artco-Bell Corporation's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in TX
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 300438462.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.