AUBURN, ME —
OSHA Inspection: PIONEER PLASTICS
Referral inspection · Health discipline
At a glance
On , OSHA opened a referral health inspection of PIONEER PLASTICS in 1 PIONITE ROAD, AUBURN, ME 04210 (NAICS 000000). OSHA activity number 301669537.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- PIONEER PLASTICS
- Site address
- 1 PIONITE ROAD
- City
- AUBURN
- State
- ME
- ZIP
- 04210
- Mailing
- P. O. BOX 1014, AUBURN, ME 04211
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 3083
- Employees
- 700
- Ownership type
- A
Citations
12 citations on file for this inspection.
5(a)(1)
- Issued
- Aug 19, 2002
- Abate by
- Sep 21, 2002
- Penalty
- Initial $4,500 · Current $3,200 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazards of gas and vapor explosions: a)At the Polyester Reactors, including the Let Down Kettle Reactor - Employees were exposed to the hazards of gas explosions or gas and vapor explosions from the ignition of the flammable decomposition products of chemical additives. b)Specialty Resins Department, Reactors, including the Polyester Reactors and the Let Down Kettle Reactor - Employees were exposed to the potential hazards of gas and/or vapor fires and explosions in the manufacture of resins. Will abate item (6) as was done in item (a) completion date 01/31/03 Included among the feasible controls for these fire and explosion hazards were: 1.Instead of charging additives through large material charge openings (manways) in reactors, design and install closed pots at the reactors to be able to charge additives without opening the large manway openings. 2.Calculate, provide, control, and specify in operating procedures an adequate flow of nitrogen through the reactors to ensure a nitrogen purge of oxygen from the headspace of the reactors when the manway doors are opened. Test for oxygen in the reactor headspace and test for concentrations of vapors at the face of the manway openings to ensure that vapor concentrations do not exceed 10of the lower explosive limit. 3.Identify all other potentially hazardous additives that could potential trigger incidents of fire or explosion. For these additives institute the controls described in items 1.and 2. above. 4.Conduct Process Hazard Analyses (PHAs) on written procedures involving potentially hazardous additives. Provide written hazard danger warnings in written manufacturing procedures at steps prior to a danger in which an operator mistake could lead to a serious incident. Consider engineering or administrative controls to limit these hazardous steps. Where PSM (Process Safety Management) processes are involved, conduct PHAs on the standard operating procedures and add appropriate danger warnings prior to potential hazardous steps in the procedures. 5.Add potentially hazardous additives to other materials to lower their hazard potential when they are being added to reactors. 6.Train operators in the explosive and decomposition hazards of resin ingredients, including additives. List decomposition temperatures of materials that are belowthe highest operating temperatures. List the flash points of liquids that are below the highest operating temperatures. Train operators in the specific hazards identified by these lists and add appropriate danger warnings to the written operating procedures involving these materials. 7.Install alarmed sensors or monitors at the face of the reactor manways when they are opened to assure no vapors concentrations above 10of the Lower Explosive Limit (LEL) existed at the open manways.
Recent events (2)
- — I (S) $3200.00
- — Z (S) $4500.00
1910.23 C01
- Issued
- Aug 19, 2002
- Abate by
- Sep 21, 2002
- Penalty
- Initial $1,800 · Current $1,260 Reduced
Recent events (2)
- — I (S) $1260.00
- — Z (S) $1800.00
1910.27 D03
- Issued
- Aug 19, 2002
- Abate by
- Sep 21, 2002
- Penalty
- Initial $1,800 · Current $1,260 Reduced
Recent events (2)
- — I (S) $1260.00
- — Z (S) $1800.00
1910.119 E05
- Issued
- Aug 19, 2002
- Abate by
- Sep 21, 2002
- Penalty
- Initial $4,500 · Current $3,200 Reduced
Recent events (2)
- — I (S) $3200.00
- — Z (S) $4500.00
1910.119 E06
- Issued
- Aug 19, 2002
- Abate by
- Sep 21, 2002
Recent events (2)
- — I (S)
- — Z (S)
1910.119 H02 I
- Issued
- Aug 19, 2002
- Abate by
- Dec 1, 2002
- Penalty
- Initial $4,500 · Current $2,150 Reduced
Recent events (2)
- — I (S) $2150.00
- — Z (S) $4500.00
1910.119 J04 I
- Issued
- Aug 19, 2002
- Abate by
- Sep 21, 2002
- Penalty
- Initial $4,500 · Current $3,200 Reduced
Recent events (2)
- — I (S) $3200.00
- — Z (S) $4500.00
1910.119 J04 IV
- Issued
- Aug 19, 2002
- Abate by
- Sep 21, 2002
Recent events (2)
- — I (S)
- — Z (S)
1910.119 O04
- Issued
- Aug 19, 2002
- Abate by
- Dec 1, 2002
- Penalty
- Initial $4,500 · Current $2,150 Reduced
Recent events (2)
- — I (S) $2150.00
- — Z (S) $4500.00
1910.119 O01
- Issued
- Aug 19, 2002
- Abate by
- Dec 1, 2002
Recent events (2)
- — I (S)
- — Z (S)
1910.1200 E01 I
- Issued
- Aug 19, 2002
- Abate by
- Sep 21, 2002
- Penalty
- Initial $3,150 · Current $2,280 Reduced
Recent events (2)
- — I (S) $2280.00
- — Z (S) $3150.00
1910.1200 H03 II
- Issued
- Aug 19, 2002
- Abate by
- Sep 21, 2002
- Penalty
- Initial $4,500 · Current $3,200 Reduced
Recent events (2)
- — I (S) $3200.00
- — Z (S) $4500.00
More inspections at Pioneer Plastics
View Pioneer Plastics's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in ME
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 301669537.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.