Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: M & J CONSTRUCTION, LLC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of M & J CONSTRUCTION, LLC. in 1829 47TH PLACE, N.W., WASHINGTON, DC 20016 (NAICS 000000). OSHA activity number 303854244.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch M & J Construction, LLC. — free Get an email when a new federal OSHA severe-injury report for M & J Construction, LLC. is published. One employer, no account, unsubscribe in one click.
Site address
1829 47TH PLACE, N.W.
City
WASHINGTON
State
DC
ZIP
20016
Mailing
3512 6TH STREET, S.E. SUITE 2, WASHINGTON, DC 20032
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
1521
Employees
6
Ownership type
A

22 citations on file for this inspection.

1926.20 B01

Serious Gravity 01 1 instance 6 exposed
Issued
Mar 12, 2001
Abate by
Jun 29, 2001
Penalty
Initial $450 · Current $450
Recent events (2)
  • — I (S) $450.00
  • — Z (S) $450.00

1926.21 B02

Serious Gravity 01 1 instance 6 exposed
Issued
Mar 12, 2001
Abate by
Jun 29, 2001
Recent events (2)
  • — I (S)
  • — Z (S)

1926.95 A

Serious Gravity 01 1 instance 2 exposed
Issued
Mar 12, 2001
Abate by
Mar 15, 2001
Recent events (2)
  • — I (S)
  • — Z (S)

1926.100 A

Other-than-serious Gravity 01 1 instance 6 exposed
Issued
Mar 12, 2001
Abate by
Mar 16, 2001
Penalty
Initial $450
Recent events (2)
  • — I (O)
  • — Z (S) $450.00

1926.150 C01 IV

Other-than-serious Gravity 01 1 instance 6 exposed
Issued
Mar 12, 2001
Abate by
Mar 16, 2001
Penalty
Initial $450
Recent events (2)
  • — I (O)
  • — Z (S) $450.00

1926.304 F

Serious Gravity 02 3 instances 2 exposed
Issued
Mar 12, 2001
Abate by
Mar 16, 2001
Penalty
Initial $600 · Current $400 Reduced
Recent events (2)
  • — I (S) $400.00
  • — Z (S) $600.00

1926.403 I02 I

Serious Gravity 02 1 instance 2 exposed
Issued
Mar 12, 2001
Abate by
Mar 16, 2001
Penalty
Initial $600 · Current $400 Reduced
Recent events (2)
  • — I (S) $400.00
  • — Z (S) $600.00

1926.404 B01 I

Serious Gravity 01 1 instance 2 exposed
Issued
Mar 12, 2001
Abate by
Mar 15, 2001
Recent events (2)
  • — I (S)
  • — Z (S)

1926.405 A02 IIJ

Serious Gravity 01 1 instance 2 exposed
Issued
Mar 12, 2001
Abate by
Mar 16, 2001
Recent events (2)
  • — I (S)
  • — Z (S)

1926.451 B01

Deleted Serious Gravity 02 1 instance 2 exposed
Issued
Mar 12, 2001
Abate by
Mar 16, 2001
Penalty
Initial $600
Recent events (2)
  • — I (S)
  • — Z (S) $600.00

1926.451 B03

Deleted Serious Gravity 02 1 instance 2 exposed
Issued
Mar 12, 2001
Abate by
Mar 15, 2001
Recent events (2)
  • — I (S)
  • — Z (S)

1926.451 C01

Deleted Serious Gravity 02 1 instance 2 exposed
Issued
Mar 12, 2001
Abate by
Mar 16, 2001
Recent events (2)
  • — I (S)
  • — Z (S)

1926.451 C02 I

Deleted Serious Gravity 02 1 instance 2 exposed
Issued
Mar 12, 2001
Abate by
Mar 16, 2001
Recent events (2)
  • — I (S)
  • — Z (S)

1926.451 C02 II

Deleted Serious Gravity 02 1 instance 2 exposed
Issued
Mar 12, 2001
Abate by
Mar 16, 2001
Recent events (2)
  • — I (S)
  • — Z (S)

1926.451 C03

Deleted Serious Gravity 03 1 instance 2 exposed
Issued
Mar 12, 2001
Abate by
Mar 16, 2001
Recent events (2)
  • — I (S)
  • — Z (S)

1926.451 E01

Serious Gravity 01 1 instance 2 exposed
Issued
Mar 12, 2001
Abate by
Mar 16, 2001
Penalty
Current $100
Recent events (2)
  • — I (S) $100.00
  • — Z (S)

1926.451 F03

Serious Gravity 01 1 instance 2 exposed
Issued
Mar 12, 2001
Abate by
Mar 16, 2001
Recent events (2)
  • — I (S)
  • — Z (S)

1926.451 G01

Serious Gravity 02 1 instance 2 exposed
Issued
Mar 12, 2001
Abate by
Mar 16, 2001
Recent events (2)
  • — I (S)
  • — Z (S)

1926.454 A

Serious Gravity 05 1 instance 2 exposed
Issued
Mar 12, 2001
Abate by
Mar 21, 2001
Recent events (2)
  • — I (S)
  • — Z (S)

1926.501 B01

Serious Gravity 01 1 instance 2 exposed
Issued
Mar 12, 2001
Abate by
Mar 15, 2001
Penalty
Initial $450 · Current $350 Reduced
Recent events (2)
  • — I (S) $350.00
  • — Z (S) $450.00

1926.1052 C01 I

Deleted Serious Gravity 02 1 instance 6 exposed
Issued
Mar 12, 2001
Abate by
Mar 16, 2001
Penalty
Initial $600
Recent events (2)
  • — I (S)
  • — Z (S) $600.00

1926.1052 C01 II

Deleted Serious Gravity 02 1 instance 6 exposed
Issued
Mar 12, 2001
Abate by
Mar 16, 2001
Recent events (2)
  • — I (S)
  • — Z (S)

View M & J Construction, LLC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 303854244.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.