ST CROIX, VI —
OSHA Inspection: HOVENSA LLC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of HOVENSA LLC in 1 ESTATE HOPE, CHRISTIANSTED, ST CROIX, VI 00820 (NAICS 324110). OSHA activity number 306195124.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- HOVENSA LLC
- Site address
- 1 ESTATE HOPE, CHRISTIANSTED
- City
- ST CROIX
- State
- VI
- ZIP
- 00820
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 324110
- SIC code (legacy)
- 2911
- Employees
- 2500
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
72 citations on file for this inspection.
1910.22 A01
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,000
General-duty citation text
29 CFR 1910.22(a)(1): Place(s) of employment were not kept clean and orderly, or in a sanitary condition: a- Hovensa St. Croix Refinery, Caustic Area South of the Penex Unit - Operators making rounds, performing procedures and responding to emergencies were exposed to tripping and slipping hazards while using concrete stairs with debris on their treads. Condition noted on or about 07/06/09.
Recent events (2)
- — F (S)
- — Z (S) $2000.00
1910.22 B01
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,000
General-duty citation text
29 CFR 1910.22(b)(1): Aisle(s) or passageway(s) were not kept clear and in good repair: a- Hovensa St. Croix Refinery, Penex Unit - A section of concrete floor in the walking area was removed and left open with plywood and dimensional lumber lying across it exposing workers to tripping hazards. Condition noted on or about 07/01/09.
Recent events (2)
- — F (S)
- — Z (S) $2000.00
1910.23 C01
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
29 CFR 1910.23(c)(1): Open sided floor(s) or platform(s) 4 feet or more above the adjacent floor or ground level were not guarded by standard railings (or the equivalent as specified in 29 CFR 1910.23(e)(3)(i) through (v)), on all open sides: a- Hovensa St. Croix Refinery, SRU East - Operators performing procedures and responding to emergencies were exposed to fall hazards of over 14 feet while accessing the Fabri valve. Condition noted on or about 06/03/09. b- Hovensa St. Croix Refinery, 5DD Low Pressure Flash Drums - Operators performing procedures and responding to emergencies were exposed to fall hazards of approximately 14 feet. No fall protection was provided between the existing platform and the drum. Condition noted on 06/03/09. c- Hovensa St. Croix Refinery, Penex Unit Compressor Building - Employees were exposed to fall hazards of 7 feet while working on the compressor platforms which were only provided with a single 34 inch high guardrail. Condition noted on or about 07/01/09. d- Hovensa St. Croix Refinery, Penex Unit, D-200 Charge Drum - Employees were exposed to falls of 14 feet while working on the platform. No fall protection was in place between the platform and the drum. Condition noted on or about 07/06/09. e- Hovensa St. Croix Refinery, Area 1 Control Room Exterior South Side - Employees were exposed to falls of over 9 feet while working on the building air handling platform. There was no proper top rail, and a mid rail was missing for a portion of the work platform. Condition noted on or about 07/06/09.
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.23 E06
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,000
General-duty citation text
29 CFR 1910.23(e)(6): All handrails and railings were not provided with a clearance of not less than 3 inches between the handrail or railing and any other object: a- Hovensa St. Croix Refinery, Control Tower - The handrail for the stairs leading to the second floor was in contact with the wall and within 3 inches of the wall for over 1/3 of the travel distance. Condition noted on or about 07/10/09.
Recent events (2)
- — F (S)
- — Z (S) $2000.00
1910.24 F
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,000
General-duty citation text
29 CFR 1910.24(f): The treads of fixed stairs were not reasonably slip-resistant with a nonslip finish on nosings: a- Hovensa St. Croix Refinery, Caustic Area South of Penex Unit - Operators making rounds, performing procedures and responding to emergencies were exposed to tripping hazards while using concrete stairs that had damaged steps and nosings. Condition noted on or about 07/06/09.
Recent events (2)
- — F (S)
- — Z (S) $2000.00
1910.27 C04
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,500 · Current $2,500
General-duty citation text
29 CFR 1910.27(c)(4): The distance from the centerline of rungs, cleats, or steps to the nearest permanent object in back of the ladder was less than 7 inches: a- Hovensa St. Croix Refinery, East side of the Fin Fan Platform, Penex Unit - Employees were exposed to fall hazards of 14 feet while using a fixed metal ladder which had a conduit within 1-2 inches of it's rung. Condition noted on or about 07/01/09. b- Hovensa St. Croix Refinery, West side of the Fin Fan Platform, Penex Unit - Employees were exposed to fall hazards of 4 feet while using a fixed metal ladder with railings located within 1 inch of it's rungs. Condition noted on or about 07/06/09. c- Hovensa St. Croix Refinery, D-203, Penex Unit - Employees were exposed to fall hazards of 14 feet while using a fixed metal ladder with rungs within 3 inches of the vessel's concrete support. Condition noted on or about 07/06/09.
Recent events (2)
- — F (S) $2500.00
- — Z (S) $2500.00
1910.27 D02
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,500
General-duty citation text
29 CFR 1910.27(d)(2): Fixed ladder(s), used to ascend to heights exceeding 20 feet and provided with cages or wells not provided with a landing platform for each 30 feet of height or fraction thereof: a- Hovensa St. Croix Refinery, R204 Reactor 2B platform, Penex Unit - Operators making rounds, performing procedures and responding to emergencies were were exposed to fall hazards of up to 37 feet while using a fixed metal ladder which was not provided with a rest platform. Condition noted on or about 07/01/09. b- Hovensa St. Croix Refinery, R201 Reactor 1A platform, Penex Unit - Operators making rounds, performing procedures and responding to emergencies were exposed to fall hazards of 34 feet while using a fixed metal ladder which was not provided with a rest platform. Condition noted on or about 07/01/09. c- Hovensa St. Croix Refinery, No. 2 Crude Unit - Operators making rounds, performing procedures and responding to emergencies were exposed to fall hazards of up to 38 feet while using a fixed metal ladder which was not provided with a rest platform. Condition noted on or about 07/06/09.
Recent events (2)
- — F (S)
- — Z (S) $2500.00
1910.27 F
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,500
General-duty citation text
29 CFR 1910.27(f): All ladders were not maintained in a safe condition and were not inspected regularly: a- Hovensa Refinery St. Croix, No. 2 Crude Unit West of Column D-2402 - Workers were exposed to fall hazards of up to 14 feet when required to access No.2 Platform process equipment via a caged ladder with bent side rails. Condition noted on or about 05/28/09. b- Hovensa Refinery St. Croix, Area 1 North of Column 2429 - Workers were exposed to fall hazards of up to 14 feet when required to access process equipment via fixed ladder which had a broken concrete base. Condition noted on or about 05/28/09.
Recent events (2)
- — F (S)
- — Z (S) $2500.00
1910.36 H04
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,000 · Current $2,000
General-duty citation text
29 CFR 1910.36(h): Each outdoor exit route did not meet the minimum height and width requirements for indoor exit routes: a- Hovensa Refinery St. Croix, SRU East Beavon Unit Cooling Tower - Access to the distribution valves located on top of the Cooling Tower was blocked by a 24" pipeline that diagonally intersected the tubular frame stairway leading to this area. Condition noted on or about 06/03/09.
Recent events (2)
- — F (S) $2000.00
- — Z (S) $2000.00
1910.37 B01
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,500
General-duty citation text
29 CFR 1910.37(b)(1): Each exit route was not adequately lighted so that an employee with normal vision could see along the exit route: a- Hovensa St. Croix Refinery, Penex Electrical Sub Station - There was no emergency lighting on the interior of the sub station which employees are required to access to lockout/tagout equipment. Condition noted on or about 07/10/09.
Recent events (2)
- — F (S)
- — Z (S) $2500.00
1910.37 B02
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,500
General-duty citation text
29 CFR 1910.37(b)(2): Each exit was not clearly visible and marked by a sign reading "Exit": a- Hovensa St. Croix Refinery, Penex Electrical Sub Station - Employees are required to access the sub station to isolate motor control centers for process equipment. During such operations the sub station door was not marked with an exit sign. Condition noted on or about 07/10/09.
Recent events (2)
- — F (S)
- — Z (S) $2500.00
1910.37 B05
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,500
General-duty citation text
29 CFR 1910.37(b)(5): Each doorway or passage along an exit access that could be mistaken for an exit was not marked "Not an Exit" or similar designation, or was not identified by a sign indicating its actual use: a- Hovensa St. Croix Refinery, Penex Electrical Sub Station - Employees are required to access the sub station to isolate motor control centers for process equipment. A door inside the substation leading to transformers was not marked accordingly. Condition noted on or about 07/10/09.
Recent events (2)
- — F (S)
- — Z (S) $2500.00
1910.119 D03 IB
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
29 CFR 1910.119(d)(3)(i)(B): Process safety information pertaining to the equipment in the process did not include the piping and instrument diagrams: a- Hovensa St. Croix Refinery, Penex Unit - On E-217, the 3 inlet and 3 outlet isolation valves were not correctly indicated on P&ID #0200-D-002 sheet 9 with only 1 inlet and 1 outlet valve shown on the drawing. Condition noted on or about 07/03/09. b- Hovensa St. Croix Refinery, Penex Unit - Pressure Safety Valve (PSV)-671 outlet isolation valve located at the relief header inlet is not shown as chain locked open (CLO) on P&ID #0200-D-0006 sheet 2. Condition noted on or about 07/03/09. c- Hovensa St. Croix Refinery, Penex Unit - The E-1101 Hot Slop Cooler Box which has been out of service for 3-4 years but was shown as active equipment on P&ID #0200-D-0004 sheet 1. Condition noted on or about 07/03/09. d) Hovensa St. Croix Refinery, Penex Unit - Set pressures for rupture disks (RDs) associated with PSVs were not listed on P&IDs to include but not limited to PSE-278, 273, 363 and 366 on P&ID #0200D-002 sheet 3. Condition noted on or about 07/03/09. e) Hovensa St. Croix Refinery, Alkylation Unit - Set pressures for RDs associated with PSVs were not listed on P&IDs to include but not limited to PSE-97 and PSE- 107 on P&ID 7200-D-0011. Condition noted on or about 07/03/09.
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.119 D03 ID
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000
General-duty citation text
29 CFR 1910.119(d)(3)(i)(D): Process safety information pertaining to the equipment in the process did not include the relief system design and design basis: a- Hovensa St. Croix Refinery, Penex Unit - Relief header system design and design basis was not developed and/or maintained by the employer. Condition noted on or about 08/25/09.
Recent events (2)
- — F (S)
- — Z (S) $5000.00
1910.119 D03 IE
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000
General-duty citation text
29 CFR 1910.119(d)(3)(i)(E): Process safety information pertaining to the equipment in the process did not include the ventilation system design: a- Hovensa St. Croix Refinery, Penex Unit - The employer failed to develop and/or maintain the design and design basis for the HVAC/pressurized system for the Area 1 Control Room. Condition noted on or about 08/28/09.
Recent events (2)
- — F (S)
- — Z (S) $5000.00
1910.119 D03 II
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
29 CFR 1910.119(d)(3)(ii): The employer did not document that the equipment in the process complied with recognized and generally accepted good engineering practices (RAGAGEP): The employer could not document in their PSI that equipment in the process complied with RAGAGEP in the following cases: a- The employer did not comply with RAGAGEP such as but not limited to ASME Boiler and Pressure Vessel Code, Division 1 (BPVC), Section VIII, UG-135(d) when it failed to provide adequate controls to ensure that intervening valves on the upstream or downstream lines to/from relief devices remained in the open position during pressure vessel operation. A number of such valves were found closed, chain locked closed or were open but not chain locked open. The following valves were not chain-locked open: C-200A,C- 200B, C200C 2" and 4" block valves to/from PSVs on the make-up and unifiner recycle sides, E-211 3" outlet isolation valves (4 valves), PSV-491 1" inlet isolation valve, PSV-491 1.5" outlet isolation valve, E-205A/B/C/D 4" shellside outlet isolation valves (2 valves), E-217 6"/6"/4" inlet isolation valves (3 valves) and 4" outlet isolation valves (3 valves), PSV-4 3" inlet isolation valve (also partially closed), PSV-4 3" outlet isolation valve (also fully closed), PSV-973 3" inlet isolation valve, PSV-973 3" outlet isolation valve, D-302 3" inlet line valve upstream of check valve, D-302 3" inlet line valve downstream of check valve, PRCV-184 3" bypass valve, PSV-635 1.5" inlet isolation valve (also fully closed, and bypass valve closed thereby isolating system), PRCV-128 3" outlet valve located at relief header inlet (also closed), PSV-671 1.5" inlet valve, PSV-671 2" outlet valve (also chain-locked closed, and bypass valve closed thereby isolating system), E-260B 6" block valve between shellside inlet and FRCV-32, FT-609 3" downstream block valve (also car-seal closed), E-201 6" shellside outlet block valve, block valve 4" downstream of FT-317 and line #2-812-B-3". Conditions noted on or about 07/03/09 and 07/06/09. b- Hovensa St. Croix Refinery, Penex Unit - Reinforced concrete supports for equipment to include but not limited to pipelines containing highly hazardous chemicals (HHC) were observed in disrepair with concrete spalling off and exposed steel re-bar. Structural concrete assessments performed at Hovensa in 2006 and 2008 noted that pipe support racks throughout operating units had extensive spalling of reinforced concrete and oxidation of rebar. The employer failed to comply with their own Engineering Standards such as but not limited to 420.1 Pipe Support Design, 430.1 Concrete Construction, 430.2 Concrete Materials and Testing, 430.3 Concrete Reinforcing and 430.5 Concrete Foundations and Structures. Condition noted on or about 07/01/09. c- Hovensa St. Croix Refinery, Penex Unit - The employer did not comply with RAGAGEP such as but not limited to API 576 Section 4.9.2 when itfailed to install a tell-tale indicator between the RD (PSE-889) and PSV-199 for the E-277A/B Drier Regeneration Heater. Condition noted on or about 07/06/09. d- Hovensa St. Croix Refinery, Penex Unit - On or about 07/06/09 the drain near the D-161 Flash Drum was plugged, allowing water to accumulate in the area. The employer did not comply with RAGAGEP such as but not limited to CCPS Guidelines for Engineering Design for Process Safe Section 16.5.6 which requires that drainage/spill control systems be inspected on a regular basis to ensure they do not contain any blockages. e- Hovensa St. Croix Refinery, Penex Unit - The employer did not comply with RAGAGEP such as but not limited to ASME Boiler and Pressure Vessel Code, Division 1, Section VIII, UG-120(a) when it failed to maintain U-1 or U-1A forms for the following pressure vessels: E-7221A, E-7221B, E-206A, D-214, R-202 and D-7201B. Condition noted on or about 09/15/09. f- Hovensa St. Croix Refinery, Penex Unit - The employer did not comply with RAGAGEP such as but not limited to API 570 Piping Inspection Code - Inspection, Repair, Alteration, and Rerating of In-Service Piping Systems Section 6.2 when it failed to document piping service class for Penex piping systems. Such piping circuits include but are not limited to 100, 410 and 4260 found throughout the unit. Condition noted on or about 09/16/09.
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.119 E03 V
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
29 CFR 1910.119(e)(3)(v): The process hazard analysis did not address facility siting: a- Hovensa St. Croix Refinery, Penex Unit - The PHA performed in 2005 and subsequent facility siting studies performed thereafter did not address the hazard of flammable and/or toxic gases entering the Area 1 Control Room during emergency events such as but not limited to the loss of positive pressure or the release of HHCs from process equipment under high temperature and pressure. The air intake for the building HVAC system was only 9 feet above the ground with holes noted in the unit's metal housing. In addition, there were numerous holes in the control room's masonry walls. Condition noted on or about 09/15/09. b- Hovensa St. Croix Refinery, Penex Unit - The 2005 PHA did not address hazards involving the exposure of employees in the Area 1 Control Room to severe blast injuries from flying projectiles and falling concrete (walls/roof) as a result of exposure to an overpressure of 5.0 psi. The resulting pressure wave will cause major damage to total collapse of the structure. Condition noted on or about 09/15/09. Abatement Note The employer must comply with RAGAGEP such as but not limited to API 752 Management of Hazards Associated with Location of Process Plant Buildings Section 3.3.7.2 which requires mitigation measures such as relocating personnel, reinforcing buildings, installing external walls and/or constructing a new explosion-resistant structures.
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.119 E03 VI
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000
General-duty citation text
29 CFR 1910.119(e)(3)(vi): The process hazard analysis (PHA) did not address human factors: a- Hovensa St. Croix Refinery, Penex Unit - The 2005 PHA did not adequately address employee exposure to fall hazards while performing work operations on process equipment. A platform around the edge of the D-200 Charge Surge Drum used by operators to access valves and to check site glasses was not adequately guarded. There was a gap of 34 inches between the open sided platform edge and the drum exterior exposing workers to fall hazards of 14 feet to the ground below. Condition noted on or about 07/06/09. b- Hovensa St. Croix Refinery, Penex Unit - The 2005 PHA did not adequately address employee exposure to fall hazards while using fixed ladders to access process equipment. On or about 07/06/09 an operator was observed standing on the exterior cage of a fixed ladder on the D-202 Unifier. The employee was exposed to a fall hazards of 10 feet to the ground below when climbing through the cage in order to read the sight glass on the drum. c- Hovensa St. Croix Refinery, Penex Unit - The 2005 PHA human factors node did not address operator fatigue, appropriate shift length and the amount of days employees can work without a day off. Condition noted on or about 07/06/09. d- Hovensa St. Croix Refinery, Alkylation Unit - The 2006 PHA human factors node did not adequately consider operator fatigue, appropriate shift length and the number of days employees can work without a day off. Condition noted on or about 07/08/09.
Recent events (2)
- — F (S)
- — Z (S) $5000.00
1910.119 E05
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
29 CFR 1910.119(e)(5): The employer did not establish a system to promptly address the team's findings and recommendations; assure that the recommendations were completed in a timely manner and that the resolution was documented: a- HOVENSA St. Croix Refinery - Procedure 35-0019 Process Hazard Analysis and Procedure 35-0027 Audit/Incident/PHA Recommendations Resolutions along with PHAs conducted for PENEX and Alkylation units failed to set a specific time period/date by which recommendations are to be completed. Recommendations were risk-ranked with rankings from level A (very high risk) to level E (very low risk) with response times ranging from immediate management attention to work notification/change management. Condition noted on or about 07/03/09. b- HOVENSA St. Croix Refinery - The following PHA recommendations/remarks were not completed at the time of the inspection: 1) PENEX 1995 PHA, node 1, p. 1 - Consider modifying the Standard Operating Procedure: "Switching from PENEX to Butamer Operation" Step 3 to also ensure that the LCV-249 valve is wide open. This recommendation was noted in the PHA as a repeat recommendation but cannot be found elsewhere in the PHA document. 2) PENEX 1995 PHA, node 2, p. 3 - Consider chain-locking open the 3" 150 psig block valve downstream of FT-609 in Line No. 2-2014-B-3". This recommendation was noted in the PHA as a repeat recommendation but cannot be found elsewhere in the PHA document. 3) PENEX 1995 PHA, node 5, p. 2 - Consider chain-locking open the 6" block valve on the shellside outlet of E-201 in Line No. 2-819-C-6"-IH. This recommendation was noted in the PHA as a repeat recommendation but cannot be found elsewhere in the PHA document. 4) PENEX 1995 PHA, node 6, p. 1 - Consider chain-locking open the 4" block valve downstream of FT-317 on Line No. 2-176-B-4". This recommendation was noted in the PHA as a repeat recommendation but cannot be found elsewhere in the PHA document. 5) PENEX 1995 PHA, node 11, p. 1 - Consider chain-locking open the 6" block valve between E-260B shellside inlet and FRCV-32 since it could be subject to high pressure from deadheaded pumps. This recommendation was noted in the PHA as a repeat recommendation but cannot be found elsewhere in the PHA document. 6) PENEX 1995 PHA, node 12, p. 2 - Consider adding a paddle blind isolation between the two normally closed 3" block valves in the evacuation line from reactors: R-203 and R-204 in Line No. 2-632-B-3". This recommendation was noted in the PHA as a repeat recommendation but cannot be found elsewhere in the PHA document. No paddle blind was observed on the union 07/03/09. 7) PENEX 2005 PHA, node 4, p. 68 - Provide adequate overpressure protection for E-200, H-200, R-200 in the event E-200A is blocked bycatalyst. This will reduce the likelihood for the release of flammable material to atmosphere which may lead to fire, personnel injury, or environmental impact. This recommendation included the wording "By matter of HOVENSA practice, the justification was not recorded for the rejection of the following recommendation." When requested, no explanation regarding the rejection or status of this recommendation was provided. 8) Alkylation 1998 PHA, p. 139 - Consider providing permanent safe access to the equipment. This item was noted in the PHA as a remark and refers to a punchlist. The copy of the punchlist provided by the company lists the item but does not document completion. This item is considered a deficiency discovered during the PHA and should be captured as a recommendation in the PHA recommendation tracking system. 9) Alkylation 1998 PHA, p. 139 - Consider labeling the exchangers. This item was noted in the PHA as a remark and refers to a punchlist. The copy of the punchlist provided by the company lists the item but does not document completion. This item is considered a deficiency discovered during the PHA and should be captured as a recommendation in the PHA recommendation tracking system. 10) Alkylation 1998 PHA, p. 140 - Consider re-tagging the PSV-363 and update P&ID as necessary. This item was noted in the PHA as a remark and refers to a punchlist. The copy of the punchlist provided by the company lists the item but does not document completion. 11) Alkylation 1998 PHA, p. 159 - Consider connecting the ground cable to the Pump, P-7201C. This item was noted in the PHA as a remark and refers to a punchlist. The copy of the punchlist provided by the company lists the item but does not document completion. 12) Alkylation 1998 PHA, p. 160 - Consider closing the 1" line and repair the local damage. This item was noted in the PHA as a remark and refers to a punchlist. The copy of the punchlist provided by the company lists the item but does not document completion. 13) Alkylation 1998 PHA, p. 160 - Consider installing the missing guard on the Pumps, P-7215A/C. This item was noted in the PHA as a remark and refers to a punchlist. The copy of the punchlist provided by the company lists the item but does not document completion. 14) Alkylation 1998 PHA, p. 160 - Fan guard not bolted to the structural support. Consider bolting the fan guard to the structure. This item was noted in the PHA as a remark and refers to a punchlist. The copy of the punchlist provided by the company lists the item but does not document completion. 15) 15) Alkylation 1998 PHA, p. 167. Consider cleaning up the area...Debris obstructing personnel platform, sample bottle clamp is missing. This item was noted in the PHA as a remark and refers to a punchlist. The copy of the punchlist provided by the company lists the item but does not document completion. 16) Alkylation 1998 PHA, p. 168. Consider completing Instrumentation Punchlist Report...Tubing tray clamps are missing, not installed properly, leaking or corroded. This item was noted in the PHA as a remark and refersto a punchlist. The copy of the punchlist provided by the company lists the item but does not document completion. 17) Alkylation 2004 PHA, p. 93 - Consider reprogramming the engineered low alarm on AI-283 pH analyzer on alkaline water wash. This recommendation was noted in the PHA as a repeat recommendation but cannot be found elsewhere in the PHA document. 18) Alkylation 2006 PHA, Node 5, p. 70 - Take daily samples of water from S-7201 for pH testing. This recommendation was noted in the PHA as a repeat recommendation but cannot be found elsewhere in the PHA document. 19) PENEX 1995 PHA, recommendation #0200-028 - Consider posting sign or label indicating hydrogen supply to D-209, LSR Sump level instrument bubblers. On 07/03/09 no signs or labels were observed on unit equipment. 20) PENEX 1995 PHA, recommendation #0200-035 - Consider evaluating current policy with regards to installing 5 minute escape packs in Control Room and in various locations through unit. 21) PENEX 2000 PHA, recommendation #0200-005R1 - Consider rotating the downstream isolation valve from the vertical position to the horizontal position for PSV-479 on D-288; HOVENSA standards require relief valve isolation valves to be installed in the horizontal position. 22) Alkylation 1995 PHA, recommendation #7200-001 - Suggest high-flow alarm on FV-447. 23) Alkylation 2006 PHA, recommendation #7200-004R3 - Provide a high level alarm on Acid KO Drum D-7203 to reduce potential for acid carryover to effluent treating that would cause severe downstream corrosion. Equipment failure from corrosion may release concentrated acid and hydrocarbons leading to fire, explosion, and personnel exposure to hazardous material. (Duplicate to incident #05-769 and PSM incident #P320-05). Conditions noted on or about 07/03/09.s
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.119 F01
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
29 CFR 1910.119(f)(1): The employer did not develop and implement written operating procedures that provided clear instructions for safely conducting activities in each covered process consistent with the process safety information: a- Hovensa St. Croix Refinery, Penex Unit - The written procedure, Area 1 Chain Lock/Carseal Survey checklist, which is used to ensure that chain locked and car sealed valves remain open did not include the following valves: PSV-4 3" inlet isolation valve, PSV-4 3" outlet isolation valve, PSV-973 3" inlet isolation valve, PSV-973 3" outlet isolation valve, D-302 3" inlet line valve upstream of check valve, D-302 3" outlet line valve downstream of check valve, PSV-671 8" outlet valve located at relief header inlet, PRCV-128 3" outlet valve located at relief header inlet, These valves were also found not chained locked open. Condition note on or about 07/03/09. b- Hovensa St. Croix Refinery, Penex Unit - The following valves were inspected using the Area 1 Chain Lock/Carseal Survey checklist on 02/16/09, and found by HOVENSA to be not CLO as required: PSV-491 1.5" outlet isolation valve, E-205A/B/C/D 4" shellside outlet isolation valves (2 valves), PRCV-184 3" outlet isolation valve, Block valve 6" between E-260B shellside inlet and FRCV-32, Block valve 3" downstream of FT-609 (valve observed as car-sealed closed). On or about 07/03/09 the above noted valves were observed by OSHA to be in the same position. The company failed to implement procedures to correct these deficiencies. c- Hovensa St. Croix Refinery, Penex Unit - There was no written operating procedures for isolating the sample recovery surge drum D-281 with specific measures for draining and venting the drum as required by PHA recommendation no. 0200-021. Condition noted on or about 07/10/09. d- Hovensa St. Croix Refinery, Area 1 Control Room - There were no written procedures covering the loss of positive pressure or necessary actions required if hydrocarbon or toxic gas was detected in the HVAC system. Condition noted on or about 07/06/09. e- Hovensa St. Croix Refinery, Penex Unit - There was no written procedure for theuse of snuffing steam used to extinguish fires on process equipment. Condition noted on or about 07/07/09.
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.119 F01 II
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000
General-duty citation text
29 CFR 1910.119(f)(1)(ii): The employer's written operating procedure did not address the requirements for the operating limits listed in 29 CFR 1910.119(f)(1)(ii)(A) and (B): a- Hovensa Refinery St. Croix, Penex unit - Unit 0200 Upper Lower Limits chart printed 7/16/09 as well as Operating Procedure No. 1 Penex, Butamer Switching Operation (0200-426 dated 08-29-08) did not indicate the safe operating limits or consequences of deviations and steps required to correct or avoid deviation for P-1218 A/B LSR ( Light Straight Run ). Condition noted on or about 09/03/09
Recent events (2)
- — F (S)
- — Z (S) $5000.00
1910.119 F03
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000
General-duty citation text
29 CFR 1910.119(f)(3): The employer did not certify annually that the operating procedures are current and accurate: a- Hovensa St. Croix Refinery, Penex Unit - Operating Procedure 0220-336 Emergency Procedure Loss of CCl4 Chemical Injection (P-278 A/B) was not reviewed by the employer and certified as current and accurate. Condition noted on or about 08/28/09. b- Hovensa St. Croix Refinery, Penex Unit - Operating Procedures throughout the unit rely on a separate Unit 200 Safe Operating Limits and Consequences of Deviation Table. There is no certification that this table has been reviewed by the employer to ensure it's accuracy. Condition noted on or about 08/28/09.
Recent events (2)
- — F (S)
- — Z (S) $5000.00
1910.119 H02 I
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000
General-duty citation text
29 CFR 1910.119(h)(2)(i): The employer, when selecting a contractor, did not obtain and evaluate information regarding the contract employer's safety performance and programs: a- Hovensa St. Croix Refinery - The employer failed to obtain contractor safety program information for Wyatt Virgin Islands and Triangle Construction. Condition noted on or about 09/01/09.
Recent events (2)
- — F (S)
- — Z (S) $5000.00
1910.119 J02
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
29 CFR 1910.119(j)(2): The employer did not establish and implement written procedures to maintain the on-going integrity of process equipment: a- Hovensa St. Croix Refinery - The employer failed to implement written procedures for inspecting and testing piping outside battery limits. Condition noted on or about 07/10/9. b- Hovensa St. Croix Refinery - The employer failed to implement their CUI program with pipe systems identified as susceptible to CUI to include but not limited to piping throughout the Penex Unit observed with damaged and/or missing insulation. Condition noted on or about 07/10/09. c- Hovensa St. Croix Refinery - The employer failed to establish and implement procedures to address anomalous readings such as growths at TMLs. Condition noted on or about 09/18/09. d- Hovensa St. Croix Refinery, Alkylation Unit - There was no written procedure developed for periodic inspection of acid tanks as required by PHA recommendation no. 7200-009R3. Condition noted on or about 07/10/09.
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.119 J03
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
29 CFR 1910.119(j)(3): The employer did not train each employee involved in maintaining the on-going mechanical integrity of process equipment in an overview of that process and its hazards and in the procedures applicable to the employee's job tasks to assure that the employee can perform the job tasks in a safe manner: a- Hovensa St. Croix Refinery - Maintenance employees to include but not limited to electricians and millwrights working throughout the refinery were not trained on an overview of process units and respective hazards such as exposure to highly hazardous chemicals. Condition noted on or about 07/09/09.
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.119 J04 I
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000
General-duty citation text
29 CFR 1910.119(j)(4)(i): Inspections and tests were not performed on process equipment to maintain its mechanical integrity: a- Hovensa St. Croix Refinery, Penex Unit - Critical instruments such as control valves, level switches and transmitters found on process equipment were not calibrated. Such equipment includes but is not limited to 0200-VSHH-00544C, 0200- XV-00553B, 0200-XV-00612A and 0200-XV-00613B. Condition noted on or about 09/15/09. b- Hovensa St. Croix Refinery, Penex Unit - Visual inspections were not performed on the following critical instruments such as but not limited to: 200-TSHH-00574B, 0200-TSHH-00578B and 0200-FT-00612A. Condition noted on or about 09/15/09. c- Hovensa St. Croix Refinery, Penex Unit - Readings were not taken for pipe circuit 410, TMLs 430-495 and pipe circuit 4260, TMLs 72-92. Condition noted on or about 09/15/09.
Recent events (2)
- — F (S)
- — Z (S) $5000.00
1910.119 J04 II
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
29 CFR 1910.119(j)(4)(ii): Inspections and testing procedures performed on process equipment to maintain its mechanical integrity did not follow recognized and generally accepted good engineering practices (RAGAGEP): a- Hovensa St. Croix Refinery, Alkylation Unit - The employer did not comply with RAGAGEP such as but not limited to API 510 Section 6.6 requirements when it failed to reduce the inspection interval of PSV-00277 which was which heavily fouled and leaked at pretest. Condition noted on or about 09/15/09. b- Hovensa St. Croix Refinery, Alkylation Unit - The employer did not comply with RAGAGEP such as but not limited to API 510 Section 6.6 when PSVs were replaced and were not inspected after removing them from service to determine if their inspection intervals were appropriate. Such valves included but were not limited to serial numbers: TJ-82127, TJ-48042, TJ-48046, TJ-48051, TJ-82130, unknown ser. no. model 601HG01-AM PSV01529, 92332060 and 92332063. Condition noted on or about 09/15/09. c- Hovensa St. Croix Refinery, Penex Unit - The employer did not comply with RAGAGEP such as but not limited to API 510 Section 6.6 when PSVs were replaced and were not inspected after removing them from service to determine if their inspection intervals were appropriate. Such valves included but were not limited to serial numbers: TB-95934, TL-66485 and TL-66484. Condition noted on or about 09/15/09. d- Hovensa St. Croix Refinery, Penex Unit - The employer did not comply with RAGAGEP such as but not limited to API 510 Section 6.6 when it failed to perform a pretest for valve, serial number TM-58561. Condition noted on or about 09/15/09. e- Hovensa St. Croix Refinery, Penex Unit - The employer did not comply with RAGAGEP such as but not limited to API 574 Section 6.3.3.2 requirements when it failed to ensure that insulation plugs were replaced and sealed after taking piping thickness measurements on insulated piping throughout the unit. Condition noted on or about 07/06/09.
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.119 J04 III
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
29 CFR 1910.119(j)(4)(iii): The frequency of inspections and tests of process equipment to maintain its mechanical integrity, was not consistent with applicable manufacturer's recommendations and good engineering practices, or more frequently determined to be necessary by prior operating experience: a- Hovensa St. Croix Refinery, Alkylation Unit - External/visual inspections were not performed at the required frequency for E-7223A Lube oil Cooler (last visual in 1997 with UTs performed in 2000), E-7221A Ejector Condenser (last visual in 1997 with UTs performed in 2007) and E-7221B Ejector Condenser (no visual inspection report with last UTs in 2000). Condition noted on or about 09/15/09. b- Hovensa St. Croix Refinery, Alkylation Unit - Pressure vessels were not inspected at their required due dates. The D-7210 Alkyline Water Wash Drum was last inspected in May 2006. The vessel was not inspected by its scheduled due date of 06/18/09. The T-7204 Acid Flash Vapor Scrubber was last inspected in December 2000. The vessel was not inspected by its scheduled due date of 08/30/08. Conditions noted on or about 09/15/09. c-Hovensa St. Croix Refinery, Penex Unit - TML readings were not taken every 5 years with the last UTs taken in 1998 for Pipe Circuit 100 - stripper bottoms drain to U/G sewer, DWG-200-1595. Condition noted on or about 09/15/09.
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.119 J04 IV
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
General-duty citation text
29 CFR 1910.119(j)(4)(iv): The employer did not document each inspection and test that had been performed on process equipment to maintain its mechanical integrity: a- Hovensa St. Croix Refinery, Alkylation Unit - External/visual inspections were not documented for E-7223A Lube oil Cooler (last visual in 1997 with UTs performed in 2000), E-7221A Ejector Condenser (last visual in 1997 with UTs performed in 2007) and E-7221B Ejector Condenser (no visual inspection report with last UTs in 2000). Condition noted on or about 09/15/09. b- Hovensa St. Croix Refinery, Alkylation Unit - Pressure vessels were not inspected at their required due dates. The D-7210 Alkyline Water Wash Drum was last inspected in May 2006. The vessel was not inspected by its scheduled due date of 06/18/09. The T-7204 Acid Flash Vapor Scrubber was last inspected in December 2000. The vessel was not inspected by its scheduled due date of 08/30/08. Conditions noted on or about 09/15/09. c- Hovensa St. Croix Refinery, Penex Unit - TML readings were not taken every 5 years with the last UTs taken in 1998 for Pipe Circuit 100 - stripper bottoms drain to U/G sewer, DWG-200-1595. Condition noted on or about 09/15/09.
Recent events (2)
- — F (S)
- — Z (S)
1910.119 J05
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
29 CFR 1910.119(j)(5): The employer did not correct deficiencies in equipment that were outside acceptable limits (as defined by the process safety information in 29 CFR 1910.119(d)) before further use or in a safe and timely manner: a- Hovensa St. Croix Refinery, Penex Unit - The RD for PSV-0973 D-302 Knock- Out Drum had burst as indicated by a pressure reading of 70-80 psi on the tell tale pressure gauge. Condition noted on or about 07/01/09. b- Hovensa St. Croix Refinery, Alkylation Unit - The RD for PSV-22 R-7201A Contactor had burst as indicated by a pressure reading of 50 psi on the tell tale pressure gauge. Condition noted on or about 07/06/09. c- Hovensa St. Croix Refinery, Alkylation Unit - The RD for PSV-71 D-7201B Acid Settler was leaking as indicated by a pressure reading of 18 psi on the tell tale pressure gauge. Condition noted on or about 07/06/09. d- Hovensa St. Croix Refinery, Alkylation Unit - The pressure gauge for the E-7221A Ejector Condenser was inoperative with the needle bent and the gauge reading over 100 psi. Condition noted on or about 07/06/09. e- Hovensa St. Croix Refinery, Penex Unit - Excessive vibration was observed on fin fan motors to include but not limited to FFD 0617-C and FFD 0167-D with visible movement of structural steel decking and supports. Condition noted on or about 07/01/09. f- Hovensa St. Croix Refinery, Penex Unit - The pressure gauge for the E-160 Fractionator Bottoms Exchanger was inoperative with the needle pegged and gauge reading over 800 psi. Condition noted on or about 07/06/09. g- Hovensa St. Croix Refinery, Penex Unit - The C-200B Make-Up Compressor and C-200C Make-Up Recycle Compressor was observed in use with their reset buttons missing. Condition noted on or about 07/01/09. h- Hovensa St. Croix Refinery, Penex Unit - A 1 inch pipe containing flammable liquid located on the South side of the P-0201-A Unifiner Stripper Reboiler was not adequately supported. Condition noted on or about 07/01/09. i- Hovensa St. Croix Refinery, Penex Unit - A 1 inch pipe containing liquid butane located on the upper fin fan platform, South side, was not adequately supported. Condition noted on or about 07/03/09. j- Hovensa St. Croix Refinery, Penex Unit - A 4 inch pipe containing flammable liquid located between the Regen Stripper Bottoms and Penex Surge Drum was not adequately supported. Condition noted on or about 07/06/09.
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.119 J06 II
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000
General-duty citation text
29 CFR 1910.119(j)(6)(ii): Appropriate checks and inspections were not performed to assure that equipment was installed properly and consistent with design specifications and the manufacturer's instructions: a- Hovensa St. Croix Refinery, Penex Unit - Inspections did not detect the improper installation of flange bolts on the 2.5 inch line to flare off PSV-836 located on the fin fan deck. Such bolts were not properly installed in that 2 to 4 threads were not showing beyond the nut after bolt-up as required by Hovensa Piping Engineering Standards. Condition noted on or about 07/06/09.
Recent events (2)
- — F (S)
- — Z (S) $5000.00
1910.119 L01
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
29 CFR 1910.119(l)(1): The employer did not establish and implement written procedures to manage changes to process chemicals, technology, equipment, and procedures; and, changes to facilities that affect a covered process: a- Hovensa St. Croix Refinery, Facility Wide - No MOCs were written to address the removal from service of fire hydrants and fire monitors. Condition noted on or about 07/01/09. b- Hovensa St. Croix Refinery, Penex Unit - No MOCs were written to address the use of temporary structural supports. Condition noted on or about 7/01/09. c- Hovensa Refinery St. Croix, Alkylation Unit - The employer did not perform an MOC when the automatic level shut down system (LAHH-136, LAHH-1155 and LAH-468) for D-7202 had been non operative since April 2009 and the automatic control valve (LC-146) was being used in the manual mode to control drum levels. Condition noted on or about 07/08/09. d- Hovensa Refinery, St. Croix, Penex Unit - An MOC was not written when the E- 279 channel head gasket was changed from carbon steel to stainless steel. Condition noted on or about 10/19/09.
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.119 L03
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
29 CFR 1910.119(l)(3): Employees involved in operating a process and maintenance and contract employees whose job tasks will be affected by a change in the process were not informed of, and trained in, the change prior to start-up of the process or affected part of the process: a- Hovensa St. Croix Refinery, Alkylation Unit - Employee(s) who were absent during the training sessions for MOC 12 (out sick, on vacation, out of plant, etc.) failed to receive the required training upon their return to work. Condition noted on or about 09/03/09. b- Hovensa St. Croix Refinery, Penex Unit - Employee(s) who were absent during training sessions for MOC 8202 failed to recieve such training upon their return to work. Condition noted on or about 09/03/09. c- Hovensa St. Croix Refinery, Penex Unit - Employee(s) who were absent during training sessions for MOC 7211 failed to receive such training upon their return to work. Condition noted on or about 09/03/09. d- Hovensa St. Croix Refinery, Penex Unit - Employee(s) who were absent during training sessions for MOC 7746 failed to receive such training upon their return to work. Condition noted on or about 09/03/09. e- Hovensa St. Croix Refinery, Penex Unit - Employee(s) who were absent during training sessions for MOC 6573 failed to receive such training upon their return to work. Condition noted on or about 09/03/09. f- Hovensa St. Croix Refinery, Penex Unit - Employee(s) who were absent during training sessions for MOC 6012 failed to receive such training upon their return to work. Condition noted on or about 09/03/09. g- Hovensa St. Croix Refinery, Penex Unit - Employee(s) who were absent during training sessions for MOC 6717 failed to receive such training upon their return to work. Condition noted on or about 09/03/09.
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.119 L04
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
29 CFR 1910.119(l)(4): A change covered by 29 CFR 1910.119(l) resulted in a change in the process safety information required by 29 CFR 1910.119(d) and process safety information was not updated: a- Hovensa St. Croix Refiery, Penex Unit - P&ID 0200-D-0002 Sheet 5 of 11 and Sheet 6 of 11 were not updated based on MOC 6012 - swap (install) PSV-0121 from C-200B Unifiner Recycle Cylinder in place of PSV-0152 on C-200C Unifiner Recycle Cylinder. Condition noted on or about 09/08/09. b- Hovensa St. Croix Refinery, Penex Unit - P&ID 0200-D-0006 Sheet 1 of 2 was not updated based on MOC 5732 - installation of a pair of flanges in line 2-770-B- 16". Condition noted on or about 09/08/09. c- Hovensa Refinery St. Croix, Penex - The Unit 0200 Safe Operating Limits and Consequences of Deviation Table was not changed or updated to reflect MOC 8202 which reset the high pressure alarm on the Stabilizer Tower (T-202) from 255 psig. to 270 psig. Conditions noted on or about 09/03/09. d- Hovensa Refinery St. Croix, Penex - The Unit 0200 Safe Operating Limits and Consequences of Deviation Table was not changed or updated to reflect MOC 5711 which changed level alarm set point LY-169 of the Make-up Compressor Suction Drum (D-276) from 85to 20 Condition noted on or about 09/03/09.
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.119 L05
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
29 CFR 1910.119(l)(5): A change covered by 29 CFR 1910.119(l) resulted in a change in the operating procedures or practices required by 29 CFR 1910.119(f) and such procedures or practices were not updated: a- Hovensa Refinery St. Croix, Alkylation Unit - MOCs 110 & 111 permanently removed the existing outlet distribution pipe along the top of the Acid Settler D-7201 including the internal pipe projection of the hydrocarbon outlet nozzle and installed two housings with coalescing media at the top of the drum. However, the Alkylation Unit Training Manual, dated 2/4/99-Rev. 1, was not updated to reflect this change. Condition noted on or about 09/02/09. b- Hovensa Refinery St. Croix, Alkylation Unit - MOC 12 permanently removed the Electrostatic Precipitator S-7203 located inside the Acid Wash Drum D-7209 and welded to the top of the vessel shell a housing with a coalescing and settling media, an acid collection sump and a drain pipe extended to the liquid level. However, the Alkylation Unit Training Manual, dated 2/4/99-Rev. 1, as not updated to reflect this change. Condition noted on or about 09/02/09.
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.119 M05
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000
General-duty citation text
29 CFR 1910.119(m)(5): The employer did not establish a system to promptly address and resolve the incident investigation report findings and recommendations: a- Hovensa St. Croix Refinery, Alkylation Unit - The employer failed to address and implement recommendations generated from incident investigations 184-107 dated 08/02/07 and 05-945 dated 12/28/05. Incident findings required the installation of coalescing media or modified demisters in upstream vessels and a system to provide amplified plant nitrogen/monitor nitrogen flow, respectively. Condition noted on or about 09/15/09. b- Hovensa St. Croix Refinery, Penex Unit - The employer failed to address and implement incident investigation 082-05 dated 04/27/05 recommendation to provide means for thermal over pressure protection on the LCO line. Condition note on or about 09/15/09.
Recent events (2)
- — F (S)
- — Z (S) $5000.00
1910.119 O01
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000
General-duty citation text
29 CFR 1910.119(o)(1): The employer did not certify that they had evaluated compliance with the provisions of 29 CFR 1910.119 at least every three years to verify that the procedures and practices developed under this standard were adequate and were being followed: a- Hovensa St. Croix Refinery - The Hovensa 2007 Compliance Audit and Risk Management Program Audit did not include a review of pressure vessel inspection records. Condition noted on or about 09/01/09.
Recent events (2)
- — F (S)
- — Z (S) $5000.00
1910.119 O04
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
29 CFR 1910.119(o)(4): The employer did not determine and document an appropriate response to each of the findings of the compliance audit required by 29 CFR1910.119(o)(1), and document that the deficiencies had been corrected: a- Hovensa St. Croix Refinery - A number of findings were not resolved from both the 2004 and 2007 PSM Compliance Audit and Risk Management Program Audits with many findings from the 2004 audit carrying over as repeat findings on the 2007 compliance audit. Findings from the 2007 which were not resolved include but were not limited to items: 3.3.2, 3.3.3, 3.3.5, 3.3.6, 3.3.7, 3.3.9, 3.6.2, 3.9.3, 3.9.4, 3.9.9, 3.10.7 and 3.12.24. Condition noted on or about 09/01/09.
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.134 D01 IV
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,500
General-duty citation text
29 CFR 1910.134(d)(1)(iv): The employer did not select respirators from a sufficient number of respirator models and sizes to assure the respirator used in the worksite is acceptable to, and correctly fits, the user: a- Hovensa St. Croix Refinery, Facility Wide - Only large facepieces were provided for supplied air respirators and SCBA's. Employees wearing medium masks would not be provided adequate protection when required to don such equipment during emergencies involving exposure to highly hazardous chemicals. Condition noted on or about 07/01/09.
Recent events (2)
- — F (S)
- — Z (S) $2500.00
1910.134 K01 III
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,500 · Current $2,500
General-duty citation text
29 CFR 1910.134(k)(1)(iii): The employer did not ensure that each user could demonstrate knowledge on how to use the respirator effectively in an emergency situations including situations in which the respirator malfunctioned: a- Hovensa Refinery St. Croix, Penex Control and Alkylation Control Rooms - Operators could not effectively don their Scott Ska-Pak airline respirators which must be used during emergency events including but not limited to the entry of flammable or toxic gases into control rooms. Conditions noted on or about 07/06/09, 07/07/09 and 07/08/09.
Recent events (2)
- — F (S) $2500.00
- — Z (S) $2500.00
1910.134 K01 IV
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
General-duty citation text
29 CFR 1910.134(k)(1)(iv): The employer did not ensure that each user could demonstrate knowledge on how to inspect, put on, and remove, use, and check the seals of the respirator: a- Hovensa Refinery St. Croix, Penex and Alkylation Control Rooms - Operators could not effectively don their Scott Ska-Pak airline respirators which must be used during emergency events. Conditions noted on or about 07/06/09, 07/07/09 and 07/08/09.
Recent events (2)
- — F (S)
- — Z (S)
1910.156 D
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000
General-duty citation text
29 CFR 1910.156(d): Fire brigade fire fighting equipment that was in damaged or unserviceable condition was not removed from service and replaced: a- Hovensa St. Croix Refinery, Penex Unit, East of No. 1 Control Room - A hose monitor/foam unit had a damaged foam supply hose. Condition noted on or about 07/01/09. b- Hovensa St. Croix Refinery, Alkylation Unit - Fire monitor M506 was not hooked up to it's foam barrel and the nozzle was not capable of being hooked up. Condition noted on or about 07/01/09. c- Hovensa St. Croix Refinery, Alkylation Unit, Near the Acid Storage - A hose monitor/foam unit had a softened foam supply hose. Condition noted on or about 07/01/09.
Recent events (2)
- — F (S)
- — Z (S) $5000.00
1910.157 E03
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000
General-duty citation text
29 CFR 1910.157(e)(3): Portable fire extinguishers were not subjected to an annual maintenance check: a- Hovensa Refinery St. Croix, West side of SRU East - Portable fire extinguishers, such as but not limited to Unit No. 122559 (350 pound wheeled extinguisher) was last subjected to an inspection on April 1995. Condition noted on or about 06/03/09
Recent events (2)
- — F (S)
- — Z (S) $5000.00
1910.158 C04
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000
General-duty citation text
29 CFR 1910.158(c)(4): Standpipe hose was not equipped with shutoff type nozzles: a - Hovensa St. Croix Refinery, Alkylation Unit, South East of the F.W. Deluge to S/E Pump Main - A fire hose was not provided with a nozzle. Operators are required to use such equipment to fight incipient stage fires. Condition noted on or about 07/01/09.
Recent events (2)
- — F (S)
- — Z (S) $5000.00
1910.212 A05
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,500 · Current $2,500
General-duty citation text
29 CFR 1910.212(a)(5): Fan blade guards, where the periphery of the blades was less than seven feet above the floor or working level, had openings larger than one half inch: a- Hovensa St. Croix Refinery, Penex Unit Fin Fan Deck - Workers making rounds, performing maintenance and inspection activities were exposed to unguarded fan blades 78 inches above the work platform. Condition noted on or about 07/01/09. b- Hovensa St. Croix Refinery, Penex Unit Fin Fan Deck - Workers were exposed to a a partially unguarded fan blade on the motor for the FFD-0165-B OVHD Condenser. A 2.5 in x 5in. opening was found on the waist height guard. Condition noted on or about 07/01/09.
Recent events (2)
- — F (S) $2500.00
- — Z (S) $2500.00
1910.219 C03
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,500 · Current $2,500
General-duty citation text
29 CFR 1910.219(c)(3): Vertical or inclined shafting was not enclosed with stationary casing(s): a- Hovensa St. Croix Refinery, No.5 and No. 6 Crude Unit - Workers were exposed to unguarded sections of vertical shafts on pumps P-3132-C and P-3110-B. Condition noted on or about 06/02/09. b- Hovensa St. Croix Refinery, Fin Fan Platform, Penex Unit - Workers were exposed to a 2 inch diameter by 5 foot vertical shaft for FFD-0217B which was not guarded. Condition noted on or about 07/01/09.
Recent events (2)
- — F (S) $2500.00
- — Z (S) $2500.00
1910.219 D01
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,500 · Current $2,500
General-duty citation text
29 CFR 1910.219(d)(1): Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified at 29 CFR 1910.219(m) & (o): a- Hovensa St. Croix Refinery, Fin Fan Deck Penex Unit - Workers performing rounds, inspecting and maintaining equipment were exposed to an unguarded 24 inch diameter spoked pulley on FFD-0127B. Condition noted on or about 07/01/09.
Recent events (2)
- — F (S) $2500.00
- — Z (S) $2500.00
1910.219 E03 I
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
General-duty citation text
29 CFR 1910.219(e)(3)(i): Vertical or inclined belt(s) were not enclosed by guard(s) conforming to the requirements specified at 29 CFR 1910.219(m) and (o): a- Hovensa St. Croix Refinery, Fin Fan Deck Penex Unit - Operators and mechanics making rounds and repairing equipment were exposed to an unguarded 3/4 in. belt on FFD-0127B. Condition noted on or about 07/01/09.
Recent events (2)
- — F (S)
- — Z (S)
1910.303 B02
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,500
General-duty citation text
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling: a- Hovensa St. Croix Refinery, Rear of South Board Area 1 Control Room - Employees working in the area were exposed to electrical shock hazards posed by electrical component design to be secured or mounted which was in use being suspended by it's power cord. Condition noted on or about 07/01/09. b- Hovensa St. Croix Refinery, Rear of North Board Area 1 Control Room - Employees working in the area were exposed to electrical shock hazards posed by a temporary power tap/strip which was not rated for industrial use. Condition noted on or about 07/01/09.
Recent events (2)
- — F (S)
- — Z (S) $2500.00
1910.303 B07 IV
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
29 CFR 1910.303(b)(7)(iv): Electrical equipment was not free from damages parts that may adversely affect safe operation or mechanical strength, such as parts that were broken, bent, cut, or deteriorated by corrosion, chemical action, or overheating: a- Hovensa St. Croix Refinery, Rear of South Board, Area 1 Control Room - There was a damaged cord and splice on the power cord to component 1S-TRC-1. Condition noted on or about 07/01/09. b- Hovensa St. Croix Refinery, Rear of North Board, Area 1 Control Room - A permanent power strip had a damaged outlet that was pulled out of it's case. Condition noted on or about 07/01/09. c- Hovensa St. Croix Refinery, Rear of North Board, Area 1 Control Room - Cords in use were damaged with exposed copper parts. Condition noted on or about 07/01/09.
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.303 G02 I
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,500 · Current $2,500
General-duty citation text
29 CFR 1910.303(g)(2)(i): Live parts of electric equipment operating at 50 volts or more were not guarded against accidental contact by approved cabinets or other forms of approved enclosures, or other means listed under this provision: a- Hovensa St. Croix Refinery, South Wall of Area 1 Control Room - The door to inverter power panel B-2 was opened, exposing unguarded energized parts. Condition noted on or about 07/01/09. b- Hovensa St. Croix Refinery, South Wall of Area 1 Control Room - The cover to Instrument Panel I-B fed from MCC-E is lifted off to access the interior, exposing unguarded energized parts. Condition noted on or about 07/01/09. c- Hovensa St. Croix Refinery, Rear of South Control Panel in Area 1 Control Room - Numerous wire ends, busses, and component lugs were exposed, unguarded and energized Condition noted on or about 07/01/09. d- Hovensa St. Croix Refinery, Rear of North Control Panel in Area 1 Control Room - Numerous wire ends, busses, and component lugs were exposed, unguarded and energized Condition noted on or about 07/01/09. e- Hovensa St. Croix Refinery, Upper Fin Fan level, North Side, Penex Unit - Bare wires protruding from an exposed conduit were energized and unguarded Condition noted on or about 07/01/09. f- Hovensa St. Croix Refinery, Penex Electrical Sub Station - The doors to panels P- 292-B, P-153-A, P-301-A, and Motor Control Center #6 were opened exposing unguarded energized parts. Condition noted on or about 07/10/09.
Recent events (2)
- — F (S) $2500.00
- — Z (S) $2500.00
1910.303 H02 II
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,500
General-duty citation text
29 CFR 1910.303(h)(2)(ii): Electrical installations rated over 600 volts, nominal, that are open to unqualified persons were not made with metal enclosed equipment or enclosed in a vault or in an area with access controlled by a lock: a- Hovensa St. Croix Refinery, Penex Electrical Sub Station - There were holes in the fence around the transformer yard. Condition noted on or about 07/06/09.
Recent events (2)
- — F (S)
- — Z (S) $2500.00
1910.304 F01 IV
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,500 · Current $2,500
General-duty citation text
29 CFR 1910.304(f)(1)(iv): Overcurrent devices for protection of circuits rated at 600 volts, nominal, or less were not readily accessible to each employee or authorized building management personnel: a- Hovensa St. Croix Refinery, Area 1 Control, North Wall - An electrical box, Instrument Panel I-A was blocked, preventing entry. Condition noted on or about 07/01/09.
Recent events (2)
- — F (S) $2500.00
- — Z (S) $2500.00
1910.305 G01 IVA
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,500
General-duty citation text
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and cables were used as a substitute for the fixed wiring of a structure: a- Hovensa St. Croix Refinery, Area 1 Control Room, Rear of South Control Board - Orange colored extension cords were being used in place of permanent wiring. Condition noted on or about 07/01/09.
Recent events (2)
- — F (S)
- — Z (S) $2500.00
1910.305 G02 III
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,500 · Current $2,500
General-duty citation text
29 CFR 1910.305(g)(2)(iii): Fixed cords and cables were not connected to devices and fittings so that strain relief is provided that would prevent pull from being directly transmitted to joints or terminal screws: a- Hovensa St. Croix Refinery, Area 1 Control Room, Rear of South Panel - Numerous components and connections were not provided with strain relief, both on new installations and damaged existing strain relief. Condition noted on or about 07/01/09. b- Hovensa St. Croix Refinery, Area 1 Control Room, Rear of North Panel - Numerous components and connections were not provided with strain relief, both on new installations and damaged existing strain relief. Condition noted on or about 07/01/09.
Recent events (2)
- — F (S) $2500.00
- — Z (S) $2500.00
1910.307 C
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
29 CFR 1910.307(c): Equipment, wiring methods, and installations of equipment in hazardous (classified) locations was not intrinsically safe, approved for the hazardous (classified) location, or safe for the hazardous (classified) location: The following equipment was located in Class I Division II locations: a- Hovensa Refinery St. Croix, Penex Unit - Cover on the electrical control panel that operates equipment ID numbers, C-1925, C-1926 and D-1426 was missing 22 of the 24 bolts on the front cover. Condition noted on or about 05/28/09. b- Hovensa Refinery St. Croix, Unifier Stripper Reboiler Area - Exposed conductors were found outside of a vertical conduit near junction cover adjacent to local disconnect for P-905. Condition noted on or about 05/28/09. c- Hovensa Refinery St. Croix, Coker Cutting Shack - Ordinary electrical light switches were found in the building. Condition noted on or about 06/02/09. d- Hovensa Refinery St. Croix, Gas Con Unit - Thermojet oil purifier (equipment # S3398/SD3398) was being powered with temporarily installed conductors (including a plastic bag that covered spliced conductors) strung overhead on beams across the aisle originating from a 480V electrical connection plug on column PS7106. Condition noted on or about 06/02/09. e- Hovensa Refinery St. Croix, No.4 Platformer - Air pressure readings on the three Instant Air instrumentation cabinets were in the "Low" level on cabinet number C- 5401A, C-5401B, C-5401C. Condition noted on or about 05/28/09. f- Hovensa Refinery St. Croix, Penex Unit - Junction box seal was loose and not making a tight fit on the mating surface on P-208-A (Penex charge pump). Condition noted on or about 07/06/09. g- Hovensa Refinery St. Croix, Penex Unit - Lens on light #10 cracked above the sample/lab station near column 112. Condition noted on or about 07/06/09. h- Hovensa Refinery St. Croix, Penex Unit - Open electrical conduits North of column 2060. Condition noted on or about 07/01/09. i- Hovensa Refinery St. Croix, Penex Unit Fin Fan Upper Deck - Damaged light fixture and open electric connection. Condition noted on or about 07/01/09. j- Hovensa Refinery St. Croix, Penex Unit Fin Fan Upper Deck - No cover on electrical box with exposed wires. Condition noted on or about 07/01/09. k- Hovensa Refinery St. Croix, Penex Unit Fin Fan Upper Deck - Light cover was not in place with an exposed light bulb. Condition noted on or about 07/01/09. l- Hovensa Refinery St. Croix, T-200 Stripper Column - Glass cover and light missing on the fixture located at the 28 foot level. Condition noted on or about 07/06/09. m- Hovensa Refinery St. Croix, Area 2 Phase 4 - Open electrical conductors in an outlet mounting box on the side of a portable structure TO-319 were covered with duct tape that had deteriorated. Condition noted on or about 07/08/09. n- Hovensa Refinery St. Croix, Alkylation Unit - Energized wires with electrical tape around the ends were protruding from flexible conduit on PD-7210-C alkylate pump. Condition noted on or about 07/01/09. o- Hovensa Refinery St. Croix, Penex Unit - The Trane HVAC unit and associated electrical disconnect located outside the Area 1 Control Room was not rated for use in the Class I Div II area. In addition, the metal housing for the HVAC unit was rusted with holes evident throughout. Condition noted on or about 07/06/09. p- Hovensa Refinery St. Croix, Area 1 Control Room - Engineering controls such as but not limited to the building HVAC system failed to maintain a positive pressure reading of at least 0.1 inches of water. Workers were exposed to fire/explosion hazards posed by flammable vapors entering through wall openings (bathroom exhaust, electric conduit) and contacting ordinary electric wiring/equipment. Condition noted on or about 07/06/09. q- Hovensa Refinery St. Croix Area 2 Control Room - Engineering controls such as but not limited to the building HVAC system failed to maintain a positive pressure reading of at least 0.1 inches of water. Workers were exposed to fire/explosion hazards posed by flammable vapors entering through the control room door, which did not fully close and contacting ordinary electric wiring/equipment. Condition noted on or about 07/08/09.
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.22 B01
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,000 · Current $3,000
Recent events (2)
- — F (S) $3000.00
- — Z (S) $2000.00
1910.24 F
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,000
Recent events (2)
- — F (S)
- — Z (S) $2000.00
1910.37 B01
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,500 · Current $6,000
Recent events (2)
- — F (S) $6000.00
- — Z (S) $2500.00
1910.37 B02
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,500
Recent events (2)
- — F (S)
- — Z (S) $2500.00
1910.37 B05
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,500
Recent events (2)
- — F (S)
- — Z (S) $2500.00
1910.156 D
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000 · Current $5,000
Recent events (2)
- — F (S) $5000.00
- — Z (S) $5000.00
1910.157 E03
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000
Recent events (2)
- — F (S)
- — Z (S) $5000.00
1910.23 E06
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,000 · Current $1,000 Reduced
Recent events (2)
- — F (O) $1000.00
- — Z (O) $2000.00
1910.27 F
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — F (O) $1000.00
- — Z (O) $2500.00
1910.119 D03 IE
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000 · Current $5,000
Recent events (2)
- — F (O) $5000.00
- — Z (S) $5000.00
1910.119 E03 VI
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000 · Current $5,000
Recent events (2)
- — F (O) $5000.00
- — Z (O) $5000.00
1910.119 F03
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000 · Current $5,000
Recent events (2)
- — F (O) $5000.00
- — Z (O) $5000.00
1910.119 O01
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000 · Current $5,000
Recent events (2)
- — F (O) $5000.00
- — Z (O) $5000.00
1910.158 C04
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $5,000 · Current $5,000
Recent events (2)
- — F (O) $5000.00
- — Z (O) $5000.00
1910.303 B02
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — F (O) $1000.00
- — Z (O) $2500.00
1910.305 G01 IVA
- Issued
- Nov 24, 2009
- Abate by
- Jan 13, 2010
- Penalty
- Initial $2,500 · Current $1,000 Reduced
Recent events (2)
- — F (O) $1000.00
- — Z (O) $2500.00
More inspections at Hovensa LLC
View Hovensa LLC's full OSHA safety record →
More inspections in this industry (NAICS 324110)
More inspections in VI
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 306195124.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.