CANTON, OH —
OSHA Inspection: PPC INC.
Complaint inspection · Health discipline
At a glance
On , OSHA opened a complaint health inspection of PPC INC. in 1623 RAFF ROAD SW, CANTON, OH 44710 (NAICS 332811). OSHA activity number 307026906.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- PPC INC.
- Site address
- 1623 RAFF ROAD SW
- City
- CANTON
- State
- OH
- ZIP
- 44710
- Mailing
- 1530 RAFF ROAD SW, CANTON, OH 44710
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332811
- SIC code (legacy)
- 3398
- Employees
- 38
- Ownership type
- A
- Industry flags
- Manufacturing health.
Citations
28 citations on file for this inspection.
5(a)(1)
- Issued
- Nov 18, 2003
- Abate by
- Nov 21, 2003
- Penalty
- Initial $3,500 · Current $2,000 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm from chemical burns and/or being struck by the load from a deficient load chain breaking in one of the CM Lodestar 13.5' Electric Chain Hoists: On August 22, 2003, the load chain broke on CM Lodestar Hoist #2, causing the basket (weighing approximately 375 pounds), spreader bar (weighing approximately 100 pounds) and approximately 3600 pounds of steel parts to drop onto one side of a dip tank on the phosphate coating line within one to two feet of the hoist operator. Some of the dip tanks on this line contain phosphoric acid and citric acid. Feasible means to abate is hazard include but are not limited to the following: a) Inspecting and maintaining of the hoist in accordance with ASME B30.16-2003, "Overhead Hoists (Underhung)" and the manufacturer's recommendations: Periodic inspection of the hoist should be conducted on a semi-annual basis or quarterly basis, as required by ASME B30.16- 2.1.1(b)(2) for heavy hoist service and severe hoist service, respectively. Previous inspections of the hoists have indicated a high exposure to wear, deterioration, and malfunction, and performance problems are evidenced by two previous incidents of the load chain breaking and one instance of the failure of an internal hoist component. b) Measuring the load chain to determine if stretching has occurred in accordance with ASME B30.16-2.5.1(c) and B30.16-2.5.2(a), as follows: (1) select an unworn, unstretched length of the chain (e.g. at the slack end); (2) suspend the chain vertically under tension and, using a caliper-type gauge, measure the outside length of any convenient number of links approximately 12 in. to 24 in. (305 mm to 610 mm) overall; (3) measure the same number of links in the used sections and calculate the percentage increase in length; (4) if the used chain for powered hoists is 1.5longer than the unused chain, replace the chain. c) Making sure that the load chain is kept adequately lubricated, especially dring hot weather, according to the manufacturer's instructions, which state: Do not allow the chain to run dry....Normally, weekly lubrication and cleaning is satisfactory, but under hot and dirty conditions, it may be necessary to clean the chain at least once a day and lubricate it several times between cleaning. d) Inspecting and replacing parts that are "mating parts" to the load chain such as the lift wheel and the chain guides, as required by ASME B30.16-2.5.2(f). On August 22, 2003, the load chain broke close to the top. This was also true on the two previous chain breaks. Once the lift wheels and chain guides are worn, they in turn wear the load chain. This wear would take place primarily at the top of the load chain. e) Having chain repair done by the chain manufacturer, as required by ASME B30.16-2.5.2(a). f) Having a qualified person determine the need for a load test following repair operations, as required by ASME B30.16-2.2.2(b)(2)(a). y 0 L
Recent events (2)
- — I (S) $2000.00
- — Z (S) $3500.00
1910.95 B01
- Issued
- Nov 18, 2003
- Abate by
- Feb 20, 2004
- Penalty
- Initial $1,250 · Current $1,000 Reduced
Recent events (2)
- — I (S) $1000.00
- — Z (S) $1250.00
1910.95 G01
- Issued
- Nov 18, 2003
- Abate by
- Nov 26, 2003
- Penalty
- Initial $1,250
Recent events (2)
- — I (S)
- — Z (S) $1250.00
1910.95 K01
- Issued
- Nov 18, 2003
- Abate by
- Nov 26, 2003
1910.124 G02
- Issued
- Nov 18, 2003
- Abate by
- Dec 1, 2003
- Penalty
- Initial $1,000 · Current $700 Reduced
22602085C136
Recent events (2)
- — I (S) $700.00
- — Z (S) $1000.00
1910.146 C04
- Issued
- Nov 18, 2003
- Abate by
- Nov 21, 2003
- Penalty
- Initial $1,000
Recent events (2)
- — I (O)
- — Z (S) $1000.00
1910.147 C06 I
- Issued
- Nov 18, 2003
- Abate by
- Nov 21, 2003
- Penalty
- Initial $1,250 · Current $1,250
Recent events (2)
- — I (S) $1250.00
- — Z (S) $1250.00
1910.147 C07 IB
- Issued
- Nov 18, 2003
- Abate by
- Nov 21, 2003
- Penalty
- Current $700
Recent events (2)
- — I (S) $700.00
- — Z (S)
1910.157 C01
- Issued
- Nov 18, 2003
- Abate by
- Nov 21, 2003
- Penalty
- Initial $1,000 · Current $700 Reduced
Recent events (2)
- — I (S) $700.00
- — Z (S) $1000.00
1910.157 E02
- Issued
- Nov 18, 2003
- Abate by
- Nov 21, 2003
1910.157 E03
- Issued
- Nov 18, 2003
- Abate by
- Nov 21, 2003
1910.157 G02
- Issued
- Nov 18, 2003
- Abate by
- Nov 21, 2003
1910.178 L01 I
- Issued
- Nov 18, 2003
- Abate by
- Nov 21, 2003
- Penalty
- Initial $1,000 · Current $700 Reduced
Recent events (2)
- — I (S) $700.00
- — Z (S) $1000.00
1910.212 A03 II
- Issued
- Nov 18, 2003
- Abate by
- Nov 21, 2003
- Penalty
- Initial $3,500 · Current $700 Reduced
Recent events (2)
- — I (S) $700.00
- — Z (S) $3500.00
1910.1200 F05 I
- Issued
- Nov 18, 2003
- Abate by
- Nov 26, 2003
- Penalty
- Initial $1,000 · Current $1,000
22602085C136T185Z100
Recent events (2)
- — I (S) $1000.00
- — Z (S) $1000.00
1910.1200 F05 II
- Issued
- Nov 18, 2003
- Abate by
- Dec 1, 2003
22602085C136T185Z100
Recent events (2)
- — I (S)
- — Z (S)
1910.1200 H
- Issued
- Nov 18, 2003
- Abate by
- Dec 1, 2003
- Penalty
- Current $700
22602085C136
Recent events (2)
- — I (S) $700.00
- — Z (S)
1904.29 B02
- Issued
- Nov 18, 2003
- Abate by
- Dec 1, 2003
1910.22 A02
- Issued
- Nov 18, 2003
- Abate by
- Nov 21, 2003
1910.22 B01
- Issued
- Nov 18, 2003
- Abate by
- Dec 1, 2003
1910.23 A08 II
- Issued
- Nov 18, 2003
- Abate by
- Nov 21, 2003
1910.23 C01
- Issued
- Nov 18, 2003
- Abate by
- Nov 21, 2003
1910.37 F01
- Issued
- Nov 18, 2003
- Abate by
- Nov 21, 2003
1910.132 A
- Issued
- Nov 18, 2003
- Abate by
- Nov 21, 2003
1910.132 F04
- Issued
- Nov 18, 2003
- Abate by
- Nov 21, 2003
1910.212 A05
- Issued
- Nov 18, 2003
- Abate by
- Nov 21, 2003
1910.305 B02
- Issued
- Nov 18, 2003
- Abate by
- Nov 21, 2003
1910.305 G01 IIIA
- Issued
- Nov 18, 2003
- Abate by
- Nov 21, 2003
More inspections at PPC INC.
View PPC INC.'s full OSHA safety record →
More inspections in this industry (NAICS 332811)
More inspections in OH
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 307026906.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.