GOUVERNEUR, NY —
OSHA Inspection: CELLU TISSUE CORPORATION - NATURAL DAM
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of CELLU TISSUE CORPORATION - NATURAL DAM in 4921 ROUTE 58 NORTH, GOUVERNEUR, NY 13642 (NAICS 322121). OSHA activity number 307693432.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- CELLU TISSUE CORPORATION - NATURAL DAM
- Site address
- 4921 ROUTE 58 NORTH
- City
- GOUVERNEUR
- State
- NY
- ZIP
- 13642
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 322121
- SIC code (legacy)
- 2621
- Employees
- 104
- Ownership type
- A
Citations
27 citations on file for this inspection.
5(a)(1)
- Issued
- Feb 23, 2006
- Abate by
- Mar 28, 2006
- Penalty
- Initial $5,000 · Current $2,845 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of being struck by the load should the overhead hoist, below-the- hook lifting devices or bridge crane system fail: a)The following below-the-hook lifting devices had no rated load capacity markings and no inspections were conducted on the devices: 1.Basement, on or about 9/7/05: A below-the-hook lifting device attached to a 3 ton CM Lodestar overhead hoist #18 had no rated load capacity markings on the device and no inspections were conducted. 2.Basement, at #5 pulper, on or about 9/7/05: A below-the-hook lifting device attached to a 2 ton Coffing overhead hoist #45 had no rated load capacity markings on the device and no inspections were conducted. 3.Beloit Winder Room, on or about 9/8/05: A spreader beam below-the- hook lifting device attached to a 5 ton CM Meteor overhead hoist #30 had no rated load capacity markings on the device, there was damage on the right side of the beam where the J hook attaches to the beam in that the bracket was bent outward, and no inspections were conducted on the device. 4.Paper Machine Room, on or about 9/14/05: A spreader beam below- the-hook lifting device attached to a 5 ton Kinetic overhead crane #32 at the winder section for paper machine #3 was damaged on the right side of the beam where the J hook attaches to the beam in that the bracket was bent outward and no inspections were conducted on the device. 5.Paper Machine Room, on or about 9/14/05: A 3 ton spreader beam below-the-hook lifting device attached to a 5 ton Saturn overhead hoist #31A at the paper machine #2 reel section had not been inspected. Among other methods, feasible and acceptable abatement methods to correct these hazards are to: 1.Have the rated load of the lifting device determined and mark it on the main structure or equivalent with ASME B30.20-1993, Section 20- 1.2.1. 2.Conduct frequent and periodic inspections in accordance with ASME B30.20-1993, Section 20-1.3 and make repairs accordingly. b)The following overhead hoists had worn chain links and missing safety latches on the lifting hooks and no annual inspections were conducted. 1.Basement, on or about 9/7/05: A 3 ton CM Lodestar overhead hoist #18 had worn chain links and no annual inspection was conducted. 2.Paper Machine Room, on or about 9/14/05: Two 5 ton CM Cyclone hand chain hoists #29 at paper machine #2 were missing safety latches at the lifting hooks and no annual inspection was conducted. 3.Paper Machine Room, on or about 9/14/05: A Saturn 5 ton overhead hoist #31A at the reel for paper machine #2 had a broken safety latch at the lifting hook and the pendant control was not labeled as to its functions and no annual inspection was conducted. 4.Core Cutting Area, on or about 9/14/05: A CM Shopstar overhead hoist #20 was not provided with an upper limit switch and no annual inspection was conducted. 5.Outside at the Headgates, a CM Meteor 2 ton overhead hoist #27, the wire rope was kinked in several areas and the hoist and trolley would not move freely on the monorail and no annual inspection was conducted. Among other methods, feasible and acceptable abatement methods to correct these hazards are to: 1.Replace the load chain in accordance with ANSI B30.16-1993 Section 16-2.5. 2.Install new safety latches on the lifting hooks in accordance with ANSI B30.16-1993 Section 16-1.2.9. 3.Label the pendant control functions in accordance with ANSI B30.16- 1993 Section 16-2.3(d). 4.Adjust the upper limit switches in accordance with ANSI B30.16-1993 Section 16-2.3(d). 5.Inspect the hoists on a frequent and periodic basis and perform the required maintenance in accordance with ASME B30.16-1993, Section 16-2. c)The following bridge crane structures for the hoists were rated for a lesser maximum weight than the hoist capacity was rated for and/or the rated capacity for the supporting structure was unknown or not clearly marked:1.Paper Machine Room, on or about 9/7/05: Two Ingersoll Rand air hoists rated for 5 ton each were mounted on a Roeper bridge crane #23 structure which was rated for 9 ton. Also, the rated load capacity markings were not clearly marked on the Roeper bridge crane. 2.Outside at the Headgates, on or about 9/14/05, a monorail with a CM Meteor 2 ton overhead hoist #27 attached, had no rated load capacity markings on the rail. 3.Outside at the Flume gates, on or about 9/14/05, a monorail with a CM Meteor 3 ton overhead hoist #26 attached, had no rated load capacity markings on the rail. Among other methods, feasible and acceptable abatement methods to correct these hazards are to: 1.Prior to installation and use, ensure the supporting structure is designed to withstand the loads and forces imposed by the hoist for the rated load in accordance with ANSI B30.11-1980, Section 11-2.2.2. 2.Mark the rated load capacities on the bridge in accordance with ANSI B30.11-1980, Section 11-1.1. Abatement documentation must be submitted for items a-1, a-2, a-3, a-4, a-5, b-2, b-5, c-2 and c-3.
Recent events (2)
- — J (S) $2845.00
- — Z (S) $5000.00
1910.22 A01
- Issued
- Feb 23, 2006
- Abate by
- Mar 16, 2006
- Penalty
- Initial $5,000 · Current $2,845 Reduced
Recent events (2)
- — J (S) $2845.00
- — Z (S) $5000.00
1910.22 C
- Issued
- Feb 23, 2006
- Abate by
- Feb 28, 2006
- Penalty
- Initial $2,000 · Current $1,138 Reduced
Recent events (2)
- — J (S) $1138.00
- — Z (S) $2000.00
1910.23 A02
- Issued
- Feb 23, 2006
- Abate by
- Feb 28, 2006
- Penalty
- Initial $1,500 · Current $854 Reduced
Recent events (2)
- — J (S) $854.00
- — Z (S) $1500.00
1910.23 A08
- Issued
- Feb 23, 2006
- Abate by
- Feb 28, 2006
Recent events (2)
- — J (S)
- — Z (S)
1910.24 G
- Issued
- Feb 23, 2006
- Abate by
- Feb 28, 2006
- Penalty
- Initial $2,000 · Current $1,138 Reduced
Recent events (2)
- — J (S) $1138.00
- — Z (S) $2000.00
1910.27 D03
- Issued
- Feb 23, 2006
- Abate by
- Feb 28, 2006
- Penalty
- Initial $2,500 · Current $1,422 Reduced
Recent events (2)
- — J (S) $1422.00
- — Z (S) $2500.00
1910.101 B
- Issued
- Feb 23, 2006
- Abate by
- Feb 28, 2006
- Penalty
- Initial $2,000 · Current $1,138 Reduced
Recent events (2)
- — J (S) $1138.00
- — Z (S) $2000.00
1910.138 A
- Issued
- Feb 23, 2006
- Abate by
- Mar 3, 2006
- Penalty
- Initial $2,500 · Current $1,422 Reduced
Recent events (2)
- — J (S) $1422.00
- — Z (S) $2500.00
1910.157 G02
- Issued
- Feb 23, 2006
- Abate by
- Mar 13, 2006
- Penalty
- Initial $5,000 · Current $2,845 Reduced
Recent events (2)
- — J (S) $2845.00
- — Z (S) $5000.00
1910.261 K26 I
- Issued
- Feb 23, 2006
- Abate by
- Mar 3, 2006
- Penalty
- Initial $5,000 · Current $2,845 Reduced
Recent events (2)
- — J (S) $2845.00
- — Z (S) $5000.00
1910.261 K28
- Issued
- Feb 23, 2006
- Abate by
- Mar 3, 2006
- Penalty
- Initial $2,500 · Current $1,422 Reduced
Recent events (2)
- — J (S) $1422.00
- — Z (S) $2500.00
1910.261 L02
- Issued
- Feb 23, 2006
- Abate by
- Mar 13, 2006
- Penalty
- Initial $2,500 · Current $1,422 Reduced
Recent events (2)
- — J (S) $1422.00
- — Z (S) $2500.00
1910.303 F
- Issued
- Feb 23, 2006
- Abate by
- Mar 6, 2006
- Penalty
- Initial $1,500 · Current $854 Reduced
Recent events (2)
- — J (S) $854.00
- — Z (S) $1500.00
1910.156 B01
- Issued
- Feb 23, 2006
- Abate by
- Oct 12, 2007
- Penalty
- Initial $70,000 · Current $54,250 Reduced
Recent events (2)
- — J (W) $54250.00
- — Z (W) $70000.00
1910.156 B02
- Issued
- Feb 23, 2006
- Abate by
- Oct 12, 2007
Recent events (2)
- — J (W)
- — Z (W)
1910.156 C01
- Issued
- Feb 23, 2006
- Abate by
- Dec 12, 2007
Recent events (2)
- — J (W)
- — Z (W)
1910.156 E01 I
- Issued
- Feb 23, 2006
- Abate by
- Oct 12, 2007
Recent events (2)
- — J (W)
- — Z (W)
1910.156 F01 II
- Issued
- Feb 23, 2006
- Abate by
- Oct 12, 2007
Recent events (2)
- — J (W)
- — Z (W)
1910.23 C01
- Issued
- Feb 23, 2006
- Abate by
- Mar 28, 2006
- Penalty
- Initial $12,500 · Current $7,112 Reduced
Recent events (2)
- — J (R) $7112.00
- — Z (R) $12500.00
1910.24 H
- Issued
- Feb 23, 2006
- Abate by
- Feb 28, 2006
- Penalty
- Initial $7,500 · Current $4,267 Reduced
Recent events (2)
- — J (R) $4267.00
- — Z (R) $7500.00
1910.212 A01
- Issued
- Feb 23, 2006
- Abate by
- Mar 28, 2006
- Penalty
- Initial $12,500 · Current $7,112 Reduced
Recent events (2)
- — J (R) $7112.00
- — Z (R) $12500.00
1910.219 D01
- Issued
- Feb 23, 2006
- Abate by
- Feb 28, 2006
- Penalty
- Initial $12,500 · Current $7,112 Reduced
Recent events (2)
- — J (R) $7112.00
- — Z (R) $12500.00
1910.219 E03 I
- Issued
- Feb 23, 2006
- Abate by
- Feb 28, 2006
Recent events (2)
- — J (R)
- — Z (R)
1910.305 B02
- Issued
- Feb 23, 2006
- Abate by
- Feb 28, 2006
- Penalty
- Initial $12,500 · Current $7,112 Reduced
Recent events (2)
- — J (R) $7112.00
- — Z (R) $12500.00
1910.305 G01 IIIA
- Issued
- Feb 23, 2006
- Abate by
- Feb 28, 2006
- Penalty
- Initial $200 · Current $95 Reduced
Recent events (2)
- — J (R) $95.00
- — Z (R) $200.00
1910.303 B02
- Issued
- Feb 23, 2006
- Abate by
- Feb 28, 2006
Recent events (2)
- — J (O)
- — Z (O)
More inspections at Cellu Tissue Corporation - Natural DAM
View Cellu Tissue Corporation - Natural DAM's full OSHA safety record →
More inspections in this industry (NAICS 322121)
More inspections in NY
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 307693432.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.