OSHA Inspection: OBERDORFER, L.L.C.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of OBERDORFER, L.L.C. in 6259 THOMPSON RD., SYRACUSE, NY 13206 (NAICS 331524). OSHA activity number 309381184.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Oberdorfer, L.L.C. — free Get an email when a new federal OSHA severe-injury report for Oberdorfer, L.L.C. is published. One employer, no account, unsubscribe in one click.
Establishment
OBERDORFER, L.L.C.
Site address
6259 THOMPSON RD.
City
SYRACUSE
State
NY
ZIP
13206
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
Y
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
331524
SIC code (legacy)
3365
Employees
95
Ownership type
A
Industry flags
Manufacturing safety.

23 citations on file for this inspection.

5(a)(1)

Serious Gravity 03 16 instances 12 exposed
Issued
Sep 11, 2006
Abate by
May 31, 2007
Penalty
Initial $875 · Current $569 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish employment and a place of employment which were free from
recognized hazards that
were causing or likely to cause death or serious physical harm to
employees in that employees
were exposed to THE HAZARD OF BEING STRUCK-BY:
a) Core Room, Station 36, Osborne Roll-Over, on or about 4/27/06: Employee
was
operating a 1/2 ton capacity air-operated chain hoist with no inspection
procedures
developed and utilized for the hoist.
b) Core Room, Pep Set, on or before 4/27/06: Employee was operating a air-
operated chain hoist with no inspection procedures developed and utilized
for the
hoist.
c) Core Room, Shell Area, on or about 5/2/06: Employee was operating (2)
air-
operated chain hoists with no inspection procedures developed and utilized
for
these
hoists.
d) Core Room, Core Assembly Area, on or about 5/2/06: Employee was
operating
a Gardner-Denver air-operated chain hoist with no inspection procedures
developed
and utilized for the hoist.
e) Core Room, Dry Sand Core Assembly, on or about 5/2/06: Employee was
operating a air - operated chain hoist with no inspection procedures
developed and
utilized for the hoist.
ABATEMENT NOTE: One means of abatement would be to ensure that the air-
operated chain hoists be inspected per American Society of Mechanical
Engineers,
ASME B30.16-1993, Chapter 16-2, Sections 16-2.1.1, 16-2.1.2 and 16-2.1.3.
f) Core Room, Pep Set, on or about 4/27/06: One air-operated chain hoist
capacity
was not marked on the hoist or load block.
g) Core Room, Shell Area, on or about 5/2/06: Two air-operated chain hoists
capacity was not marked on the hoist or load block.
h) Core Room, Dry Sand Core Assembly, on or about 5/2/06: One air-operated
chain hoist capacity was not marked on the hoist or load block.
ABATEMENT NOTE: One means of abatement would be to ensure that the rated
load of each hoist is marked on the hoist or load block per American
Society of
Mechanical Engineers, ASME B30.16-1993, Chapter 16-1, Section 16-1.1
i) Core Room, Pep Set, on or about 4/27/06: The supporting structure
including the
monorail for the air- operated chain hoist was not designed nor rated to
withstand
the loads and forces imposed by the hoist for the rated load.j) Core Room,
Shell Area, on or about 5/2/06: The supporting structure including
the monorail for two air-operated chain hoists was not designed nor rated
to
withstand the loads and forces imposed by two air-operated chain hoists
for the
rated loads.
k) Core Room, Dry Sand Core Assembly, on or about 5/2/06: The supporting
structure including the monorail for the air-operated chain hoist was not
designed
nor rated to withstand the loads and forces imposed by the hoist for the
rated load.
ABATEMENT NOTE: One means of abatement would be to have a qualified person
review the design of the supporting structures and establish rated load
capacities as
per American Society of Mechanical Engineers, ASME B30.16-1993, Chapter
16-1,
Section 16-1.3.2.
l) Core Room, Pep Set, on or about 4/27/06: Below-the-hook lifting devices
used to
support molds and attach loads to an air-powered chain hoist were not
marked as
to their rated capacity.
m) Foundry Dept., 1175 Head Line, on or about 5/3/06: Below-the-hook
lifting
device used to lift and support degasser unit and attach loads to an air
powered cain
hoist was not marked as to its rated capacity.
n) Foundry Dept., 1175 Head Line, # 2 Clam on or about 5/3/06:
Below-the-hook
lifting device used to lift cylinder head molds with molten metal was not
marked as
to its rated capacity.
ABATEMENT NOTE: One means of abatement is to have a qualified person review
the design of the below-the-hook devices and have their established
capacities
marked on the devices per American Society of Mechanical Engineers, ASME
B30.20-1993, Chapter 20-1, Section 20-1.2.1.
o) Core Room, Pep Set, Foundry Dept. 1175 Head Line, on or about 5/3/06:
Below-
the-hook lifting devices used to lift and/or support molds and attach
loads to air-
powered hoists were not being inspected using the frequent and periodic
procedures
as specified in American Society of Mechanical Engineers, ASME B30.20-1993.
ABATEMENT NOTE: One means of abatement would be to ensure that the below-
the-hook lifting devices be inspected per American Society of Mechanical
Engineers
ASME B30.20-1.3.1.
p) Foundry Dept., Bay 9A, on or about 5/4/06: Pendant control station for
Yale five
ton crane was not supported in a manner as to protect the electrical
conductors
against strain.
ABATEMENT NOTE: One means of abatement would be to provide a wire rope
and/or chain attached to the pendant control and hoist motor control per
American
Society of Mechanical Engineers, ASME B30.16, Chapter 16, Section
16-1.2.3(d).
Abatement certification must be submitted for this item.
Recent events (3)
  • — P (S) $568.75
  • — I (S) $568.75
  • — Z (S) $875.00

1910.23 C01

Serious Gravity 03 2 instances 3 exposed
Issued
Sep 11, 2006
Abate by
Sep 14, 2006
Penalty
Initial $875 · Current $569 Reduced
Recent events (2)
  • — I (S) $568.75
  • — Z (S) $875.00

1910.23 C03

Serious Gravity 03 2 instances 4 exposed
Issued
Sep 11, 2006
Abate by
Sep 14, 2006
Penalty
Initial $875 · Current $569 Reduced
Recent events (2)
  • — I (S) $568.75
  • — Z (S) $875.00

1910.25 D01 I

Serious Gravity 02 1 instance 2 exposed
Issued
Sep 11, 2006
Abate by
Sep 14, 2006
Penalty
Initial $700 · Current $455 Reduced
Recent events (2)
  • — I (S) $455.00
  • — Z (S) $700.00

1910.27 C02

Serious Gravity 03 1 instance 2 exposed
Issued
Sep 11, 2006
Abate by
Sep 29, 2006
Penalty
Initial $875 · Current $569 Reduced
Recent events (2)
  • — I (S) $568.75
  • — Z (S) $875.00

1910.102 A

Serious Gravity 03 1 instance 2 exposed
Issued
Sep 11, 2006
Abate by
Sep 14, 2006
Penalty
Initial $875 · Current $569 Reduced
Recent events (2)
  • — I (S) $568.75
  • — Z (S) $875.00

1910.106 E06 I

Serious Gravity 01 2 instances 2 exposed
Issued
Sep 11, 2006
Abate by
Sep 14, 2006
Penalty
Initial $525 · Current $341 Reduced
Recent events (2)
  • — I (S) $341.25
  • — Z (S) $525.00

1910.106 E06 II

Serious Gravity 01 1 instance 2 exposed
Issued
Sep 11, 2006
Abate by
Sep 14, 2006
Recent events (2)
  • — I (S)
  • — Z (S)

1910.132 A

Serious Gravity 03 2 instances 2 exposed
Issued
Sep 11, 2006
Abate by
Sep 14, 2006
Penalty
Initial $875 · Current $569 Reduced
Recent events (2)
  • — I (S) $568.75
  • — Z (S) $875.00

1910.132 D01

Serious Gravity 03 1 instance 2 exposed
Issued
Sep 11, 2006
Abate by
Sep 29, 2006
Recent events (2)
  • — I (S)
  • — Z (S)

1910.144 A01 III

Serious Gravity 02 1 instance 2 exposed
Issued
Sep 11, 2006
Abate by
Sep 14, 2006
Penalty
Initial $700 · Current $455 Reduced
Recent events (2)
  • — I (S) $455.00
  • — Z (S) $700.00

1910.178 P01

Serious Gravity 03 2 instances 4 exposed
Issued
Sep 11, 2006
Abate by
Sep 14, 2006
Penalty
Initial $875 · Current $569 Reduced
Recent events (2)
  • — I (S) $568.75
  • — Z (S) $875.00

1910.212 A01

Serious Gravity 02 2 instances
Issued
Sep 11, 2006
Abate by
Sep 14, 2006
Penalty
Initial $700 · Current $455 Reduced
Recent events (2)
  • — I (S) $455.00
  • — Z (S) $700.00

1910.212 A03 II

Serious Gravity 02 1 instance 1 exposed
Issued
Sep 11, 2006
Abate by
Sep 29, 2006
Penalty
Initial $700 · Current $455 Reduced
Recent events (2)
  • — I (S) $455.00
  • — Z (S) $700.00

1910.213 H01

Serious Gravity 03 1 instance 2 exposed
Issued
Sep 11, 2006
Abate by
Sep 14, 2006
Penalty
Initial $875 · Current $569 Reduced
Recent events (2)
  • — I (S) $568.75
  • — Z (S) $875.00

1910.213 H04

Serious Gravity 03 1 instance 2 exposed
Issued
Sep 11, 2006
Abate by
Sep 14, 2006
Recent events (2)
  • — I (S)
  • — Z (S)

1910.219 C03

Serious Gravity 02 1 instance 1 exposed
Issued
Sep 11, 2006
Abate by
Sep 29, 2006
Penalty
Initial $700 · Current $455 Reduced
Recent events (2)
  • — I (S) $455.00
  • — Z (S) $700.00

1910.219 D01

Serious Gravity 02 1 instance 2 exposed
Issued
Sep 11, 2006
Abate by
Sep 29, 2006
Penalty
Initial $700 · Current $455 Reduced
Recent events (2)
  • — I (S) $455.00
  • — Z (S) $700.00

1910.219 E03 I

Serious Gravity 02 1 instance 2 exposed
Issued
Sep 11, 2006
Abate by
Sep 27, 2006
Recent events (2)
  • — I (S)
  • — Z (S)

1910.303 B01 VII

Serious Gravity 01 1 instance 2 exposed
Issued
Sep 11, 2006
Abate by
Sep 14, 2006
Penalty
Initial $525 · Current $341 Reduced
Recent events (2)
  • — I (S) $341.25
  • — Z (S) $525.00

1910.303 G02 I

Serious Gravity 03 3 instances 4 exposed
Issued
Sep 11, 2006
Abate by
Sep 14, 2006
Penalty
Initial $875 · Current $569 Reduced
Recent events (2)
  • — I (S) $568.75
  • — Z (S) $875.00

1910.304 A02

Serious Gravity 03 3 instances 4 exposed
Issued
Sep 11, 2006
Abate by
Sep 14, 2006
Penalty
Initial $875 · Current $569 Reduced
Recent events (2)
  • — I (S) $568.75
  • — Z (S) $875.00

1910.304 F04

Serious Gravity 10 6 instances 8 exposed
Issued
Sep 11, 2006
Abate by
Sep 14, 2006
Penalty
Initial $2,500 · Current $1,625 Reduced
Recent events (2)
  • — I (S) $1625.00
  • — Z (S) $2500.00

View Oberdorfer, L.L.C.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 309381184.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.