OSHA Inspection: CANDLER CONCRETE PRODUCTS, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of CANDLER CONCRETE PRODUCTS, INC. in 2720 CANDLER ROAD, GAINESVILLE, GA 30503 (NAICS 327320). OSHA activity number 311038152.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Candler Concrete Products, INC. — free Get an email when a new federal OSHA severe-injury report for Candler Concrete Products, INC. is published. One employer, no account, unsubscribe in one click.
Site address
2720 CANDLER ROAD
City
GAINESVILLE
State
GA
ZIP
30503
Mailing
2720 CANDLER ROAD, PO BOX 759, GAINESVILLE, GA 30503
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
327320
SIC code (legacy)
3273
Employees
40
Ownership type
A

20 citations on file for this inspection.

1910.37 A03

Serious Gravity 01 1 instance 5 exposed
Issued
Mar 19, 2008
Abate by
Sep 12, 2008
Penalty
Initial $900 · Current $500 Reduced
Recent events (2)
  • — I (S) $500.00
  • — Z (S) $900.00

1910.37 B02

Serious Gravity 01 1 instance 5 exposed
Issued
Mar 19, 2008
Abate by
Apr 14, 2008

1910.37 B05

Serious Gravity 01 1 instance 5 exposed
Issued
Mar 19, 2008
Abate by
Apr 14, 2008

1910.101 B

Serious Gravity 04 1 instance 5 exposed
Issued
Mar 19, 2008
Abate by
Sep 12, 2008
Penalty
Initial $1,500 · Current $750 Reduced
Recent events (2)
  • — I (S) $750.00
  • — Z (S) $1500.00

1910.253 B04 III

Serious Gravity 01 1 instance 5 exposed
Issued
Mar 19, 2008
Abate by
Mar 24, 2008

1910.157 C01

Serious Gravity 01 1 instance 8 exposed
Issued
Mar 19, 2008
Abate by
Sep 12, 2008
Penalty
Initial $900 · Current $450 Reduced
Recent events (2)
  • — I (S) $450.00
  • — Z (S) $900.00

1910.157 G01

Serious Gravity 01 1 instance 8 exposed
Issued
Mar 19, 2008
Abate by
May 5, 2008

1910.178 L

Serious Gravity 01 1 instance 6 exposed
Issued
Mar 19, 2008
Abate by
Sep 12, 2008
Penalty
Initial $900 · Current $700 Reduced
Recent events (2)
  • — I (S) $700.00
  • — Z (S) $900.00

1910.179 J03

Serious Gravity 02 1 instance 1 exposed
Issued
Mar 19, 2008
Abate by
Sep 12, 2008
Penalty
Initial $1,200 · Current $600 Reduced
Recent events (2)
  • — I (S) $600.00
  • — Z (S) $1200.00

1910.179 J02 IV

Serious Gravity 02 1 instance 1 exposed
Issued
Mar 19, 2008
Abate by
Apr 14, 2008

1910.179 J02 III

Serious Gravity 02 1 instance 1 exposed
Issued
Mar 19, 2008
Abate by
Apr 14, 2008

1910.219 E03 I

Serious Gravity 03 1 instance 1 exposed
Issued
Mar 19, 2008
Abate by
Sep 12, 2008
Penalty
Initial $1,500 · Current $750 Reduced
Recent events (2)
  • — I (S) $750.00
  • — Z (S) $1500.00

1910.254 D09 III

Serious Gravity 01 1 instance 5 exposed
Issued
Mar 19, 2008
Abate by
Sep 12, 2008
Penalty
Initial $900 · Current $300 Reduced
Recent events (2)
  • — I (S) $300.00
  • — Z (S) $900.00

1910.303 B01 III

Serious Gravity 01 1 instance 5 exposed
Issued
Mar 19, 2008
Abate by
Sep 12, 2008
Penalty
Initial $900 · Current $450 Reduced
Recent events (2)
  • — I (S) $450.00
  • — Z (S) $900.00

1910.303 B02

Serious Gravity 01 1 instance 10 exposed
Issued
Mar 19, 2008
Abate by
Apr 14, 2008

1910.303 C

Serious Gravity 01 1 instance 10 exposed
Issued
Mar 19, 2008
Abate by
Sep 12, 2008
Penalty
Initial $900 · Current $450 Reduced
Recent events (2)
  • — I (S) $450.00
  • — Z (S) $900.00

1910.305 B01

Serious Gravity 01 1 instance 10 exposed
Issued
Mar 19, 2008
Abate by
Sep 12, 2008
Penalty
Initial $900 · Current $300 Reduced
Recent events (2)
  • — I (S) $300.00
  • — Z (S) $900.00

1910.305 G02 III

Serious Gravity 01 1 instance 5 exposed
Issued
Mar 19, 2008
Abate by
Apr 14, 2008

1910.147 C04 I

Repeat Gravity 03 1 instance 1 exposed
Issued
Mar 19, 2008
Abate by
Sep 12, 2008
Penalty
Initial $3,000 · Current $1,700 Reduced
Recent events (2)
  • — I (R) $1700.00
  • — Z (R) $3000.00

1910.147 C07 I

Repeat Gravity 03 1 instance 10 exposed
Issued
Mar 19, 2008
Abate by
Sep 27, 2008
Penalty
Initial $3,000 · Current $1,700 Reduced
Recent events (2)
  • — I (R) $1700.00
  • — Z (R) $3000.00

View Candler Concrete Products, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 311038152.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.