BRAINTREE, MA —
OSHA Inspection: WOLLASTON ALLOYS
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of WOLLASTON ALLOYS in 205 WOOD ROAD, BRAINTREE, MA 02184 (NAICS 332999). OSHA activity number 312102957.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- WOLLASTON ALLOYS
- Site address
- 205 WOOD ROAD
- City
- BRAINTREE
- State
- MA
- ZIP
- 02184
- Mailing
- 205 WOOD ROAD, BRAINTREE, MA 02184
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332999
- SIC code (legacy)
- 3499
- Employees
- 205
- Ownership type
- A
Citations
1 citation on file for this inspection.
5(a)(1)
- Issued
- Jun 8, 2009
- Abate by
- Aug 12, 2009
- Penalty
- Initial $4,000 · Current $3,000 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazards associated with molten metal/steam explosions: Melt Dept, AOD Area: On or about 1/12/09 several workers were injured when a molten metal and steam explosion occurred while transferring molten metal from the AOD vessel into the Teapot Ladle where the molten metal spilled over into the Teapot Ladle pit, which contained standing water. Methods of abatement can include the following steps: 1) Waterproof the AOD pouring pit to prevent entrance of moisture. 2) To facilitate inspection, do not use the pan in the pit. 3) Have a sensing device for water in the pit. 4) Perform daily inspections of the pit. 5) Have the AOD operator check that the AOD vessel and Teapot Ladle are properly aligned before commencing the pour.ncing
Recent events (2)
- — I (S) $3000.00
- — Z (S) $4000.00
More inspections at Wollaston Alloys
View Wollaston Alloys's full OSHA safety record →
More inspections in this industry (NAICS 332999)
More inspections in MA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 312102957.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.