Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: MORROW CONSTRUCTION OF PEKIN, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of MORROW CONSTRUCTION OF PEKIN, INC. in 1100 CANYON CREEK RD., NORMAL, IL 61761 (NAICS 238160). OSHA activity number 312892367.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Morrow Construction of Pekin, INC. — free Get an email when a new federal OSHA severe-injury report for Morrow Construction of Pekin, INC. is published. One employer, no account, unsubscribe in one click.
Site address
1100 CANYON CREEK RD.
City
NORMAL
State
IL
ZIP
61761
Mailing
1421 MARTHA ST., PEKIN, IL 61554
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
SIC code (legacy)
1761
Employees
4
Ownership type
A

8 citations on file for this inspection.

1926.20 B01

Serious Gravity 10 1 instance 3 exposed
Issued
May 7, 2010
Abate by
May 26, 2010
Penalty
Initial $1,500 · Current $1,000 Reduced
Recent events (2)
  • — I (S) $1000.00
  • — Z (S) $1500.00

1926.20 B02

Serious Gravity 10 1 instance 3 exposed
Issued
May 7, 2010
Abate by
May 26, 2010
Recent events (2)
  • — I (S)
  • — Z (S)

1926.21 B02

Serious Gravity 10 1 instance 3 exposed
Issued
May 7, 2010
Abate by
May 26, 2010
Penalty
Initial $1,500 · Current $1,000 Reduced
Recent events (2)
  • — I (S) $1000.00
  • — Z (S) $1500.00

1926.102 A01

Serious Gravity 10 1 instance 3 exposed
Issued
May 7, 2010
Abate by
May 26, 2010
Recent events (2)
  • — I (S)
  • — Z (S)

1926.451 G01 VII

Serious Gravity 10 1 instance 3 exposed
Issued
May 7, 2010
Abate by
May 13, 2010
Penalty
Initial $1,500 · Current $1,000 Reduced
Recent events (2)
  • — I (S) $1000.00
  • — Z (S) $1500.00

1926.454 A

Serious Gravity 10 1 instance 1 exposed
Issued
May 7, 2010
Abate by
May 26, 2010
Recent events (2)
  • — I (S)
  • — Z (S)

1926.501 B13

Serious Gravity 10 1 instance 3 exposed
Issued
May 7, 2010
Abate by
May 12, 2010
Penalty
Initial $1,500 · Current $1,000 Reduced
Recent events (2)
  • — I (S) $1000.00
  • — Z (S) $1500.00

1926.503 A01

Serious Gravity 10 1 instance 3 exposed
Issued
May 7, 2010
Abate by
May 26, 2010
Recent events (2)
  • — I (S)
  • — Z (S)

View Morrow Construction of Pekin, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 312892367.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.