HOUSTON, TX —
OSHA Inspection: CES ENVIRONMENTAL SERVICES, INC.
Unprogrammed Related inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Related safety inspection of CES ENVIRONMENTAL SERVICES, INC. in 4904 GRIGGS ROAD, HOUSTON, TX 77021 (NAICS 562998). OSHA activity number 312919442.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- CES ENVIRONMENTAL SERVICES, INC.
- Site address
- 4904 GRIGGS ROAD
- City
- HOUSTON
- State
- TX
- ZIP
- 77021
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 562998
- SIC code (legacy)
- 4959
- Employees
- 120
- Ownership type
- A
Citations
27 citations on file for this inspection.
5(a)(1)
- Issued
- Jan 4, 2010
- Abate by
- Jan 29, 2010
- Penalty
- Initial $7,000 · Current $7,000
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to: a)The employer does not provide adequate fall protection to employees performing tank washing activities on tank trailers. This was observed on July 14, 2009, and thereafter, in that the personal fall arrest system, which included a horizontal lifeline and retractable lanyard installed in wash bays 3 and 5 had not been designed, installed and maintained as required. The conditions observed included but were not limited to: 1)In tank wash bay 3 the clevis used as an anchorage connector for the DBI SALA self retracting lanyard was not designed for that purpose, and was not marked with its rated load limit. 2)In tank wash bay 5 two of three wire rope clips used on the horizontal lifeline were installed backwards. 3)In tank wash bay 5, the retractable lanyard was not removed from service after exposure to a flash fire in that bay on July 7, 2009. 4)In tank wash bay 3, the self closing hook on the DBI Sala self retracting lanyard with winch did not lock closed due to contamination. One feasible and acceptable method of abatement to correct this hazard would be to install a personal fall arrest system, horizontal lifeline and retractable lanyard designed by a qualified person, installed in accordance with the manufacturer's instructions, inspected and maintained in accordance with manufacturer's requirements. Pursuant to 29 C.F.R 1903.19, within ten (10) calendar days from the abatement date for this citation, the employer must submit documentation showing that it is in compliance with the standard, describing the engineered lifeline, personal fall arrest systems and components, and implementation of a program to insure the continued adequacy of all parts of the fall protection systems.
Recent events (2)
- — J (S) $7000.00
- — Z (S) $7000.00
5(a)(1)
- Issued
- Jan 4, 2010
- Abate by
- Feb 22, 2010
- Penalty
- Initial $7,000 · Current $7,000
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to explosion and struck by hazards during startup and operation of power boilers: The employer does not ensure that two boilers are installed, maintained and operated safely. This was observed on September 17, 2009. Unsafe installation and maintenance included, but was not limited to: Boiler No. 2: Cleaver Books model CB-700-150, serial number L92425: 1) did not have pipe fittings installed to allow for leak testing of each main burner safety shutoff valve. These devices are required by ASME CSD-1-2009, Controls and Safety Devices for Automatically Fired Boilers. 2) did not have a safety shutoff valve installed on the gas pilot line, as required by section CF-180(c) of ASME CSD-1-2009. 3) Boiler No. 2 safety valves did not vent steam to a safe location. The two safety valves discharged horizontally into a plenum area between two roof assemblies where the steam is horizontally directed towards a pedestrian path. 4) Two safety valves on Boiler No. 2 were incorrectly installed. Safety valve piping discharges to a pedestrian path. Piping is not anchored to counter reactions forces during steam discharge from relief valves as required by 2007 ASME Boiler & Pressure Vessel Code Section VIII, Division 1, Subsection A, part UG-135(f), Appendix M-12(a) of the 2009 ASME Boiler & Pressure Vessel Code, Section VIII, Division 1 and Recommended Guidelines for the care of Power Boilers, 2007 BPVC Section VII. 5) There was no evidence of a periodic maintenance program for boiler No. 2 as mandated by Section CM-130 of ASME CSD-1-2009, Controls and Safety devices for Automatically Fired Boilers. 6) Safe operating procedures for the boiler were not documented, and the only licensed boiler operator does not remain on the site whenever the boilers are in operation. For Boiler No. 1, a Williams & Davis model 777, National Board no. 5913: 1) The single safety valve on top of boiler No. 1 did not vent steam to a safety location. The safety valves discharged directly into the boiler room. National Board Inspection Code, Part 1 Section 5.3.6.f requires pressure relief device discharges to be arranged such that they are not a hazard to personnel or otherequipment. 2009 ASME Boiler & Pressure Vessel Code, Section VIII, Division 1, Subsection A, Part UG-135(f) requires discharge lines from pressure relief devices be designed to discharge to a safe location. 2) The single safety valve was incorrectly installed. The discharge piping is not supported or restrained. 2009 ASME Boiler & Pressure Vessel Code, Section VIII, Division 1, Subsection A, Part UG-135(f) requires that discharge lines from pressure relief devices do not reduce the relieving capacity of the devices. Appendix M-12(a) of the 2009 ASME Boiler and Pressure Vessel Code, Section VIII, Division 1 and ASME 2007 Boiler and Pressure Vessel Code, Section VII Recommended Guidelines for the care of Power Boilers require anchoring of discharge piping to counter reaction forces when steam discharges from the safety valve. 3) There was no pipe fitting installed to allow for independently leak testing each main burner safety shutoff valve, as required by Section CF-180(g) of ASME CSD-1-2009, Controls and Safety Devices for Automatically Fired Boilers. 4) There was no documented safe operating procedures for boiler operators and the only licensed boiler operator did not remain on the site at all times when the boiler was in operation. Among others, feasible and acceptable methods to abate these conditions include, but are not limited to: installation of pipe fittings on boilers 1 and 2 for the purpose of allowing a gas leakage test in accordance with ASME CSD-1-2009, Controls and Safety devices for Automatically Fired Boilers, and inclusion of such a test in lockout/tagout procedures; Installation of safety shutoff valve on the gas pilot line of Boiler #2 fuel train as required by ASME CSD-1-2009; Repositioning of steam vents on Boilers No. 1 and 2, and adequate restraint of pressure relieving devices in accordance with ASME Boiler & Pressure Vessel Code, Section VIII, Subsection A, Part UG-135; insure that boiler isolation methods are included in boiler lockout tagout procedures, including complete closure and blocking or locking of steam safety shutoff valves per Section C6.310 of ASME 2007 Boiler and Pressure Vessel Code Section VII, Recommended Guidelines; Installation of safety valves per Nation Board Inspection Code, Part 1, section 5.3.6.f, insuring that steam is vented to a safe location; Develop and implement a formal system of periodic preventive maintenance per the requirements in Section CM-130 of ASME CSD-1-2009, and develop and implement boiler user instructions per ASME 2007 Boiler and Pressure Vessel Code, Section VII, Recommended Guildelines for the care of Power Boilers. Pursuant to 29 C.F.R 1903.19, within ten (10) calendar days from the abatement date for this citation, the employer must submit documentation showing that it is in compliance with the standard, including describing compliance with the installation, maintenance, and operation provisions for Boilers and Pressure Vessels.
Recent events (2)
- — J (S) $7000.00
- — Z (S) $7000.00
1910.22 A01
- Issued
- Jan 4, 2010
- Abate by
- Jan 14, 2010
- Penalty
- Initial $3,500 · Current $3,500
Recent events (2)
- — J (S) $3500.00
- — Z (S) $3500.00
1910.23 C03
- Issued
- Jan 4, 2010
- Abate by
- Jan 22, 2010
- Penalty
- Initial $7,000 · Current $7,000
Recent events (2)
- — J (S) $7000.00
- — Z (S) $7000.00
1910.23 E01
- Issued
- Jan 4, 2010
- Abate by
- Jan 29, 2010
- Penalty
- Initial $7,000 · Current $7,000
Recent events (2)
- — J (S) $7000.00
- — Z (S) $7000.00
1910.23 E05 IV
- Issued
- Jan 4, 2010
- Abate by
- Jan 14, 2010
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- — J (S) $2500.00
- — Z (S) $2500.00
1910.24 F
- Issued
- Jan 4, 2010
- Abate by
- Jan 14, 2010
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- — J (S) $2500.00
- — Z (S) $2500.00
1910.36 D01
- Issued
- Jan 4, 2010
- Abate by
- Jan 8, 2010
- Penalty
- Initial $7,000 · Current $7,000
Recent events (2)
- — J (S) $7000.00
- — Z (S) $7000.00
1910.37 B02
- Issued
- Jan 4, 2010
- Abate by
- Jan 14, 2010
- Penalty
- Initial $1,500 · Current $1,500
Recent events (2)
- — J (S) $1500.00
- — Z (S) $1500.00
1910.37 B05
- Issued
- Jan 4, 2010
- Abate by
- Jan 14, 2010
Recent events (2)
- — J (S)
- — Z (S)
1910.120 P08 I
- Issued
- Jan 4, 2010
- Abate by
- Feb 22, 2010
- Penalty
- Initial $7,000 · Current $7,000
Recent events (2)
- — J (S) $7000.00
- — Z (S) $7000.00
1910.132 A
- Issued
- Jan 4, 2010
- Abate by
- Jan 14, 2010
- Penalty
- Initial $7,000 · Current $7,000
Recent events (2)
- — J (S) $7000.00
- — Z (S) $7000.00
1910.147 C04 II
- Issued
- Jan 4, 2010
- Abate by
- Jan 19, 2010
- Penalty
- Initial $7,000 · Current $7,000
Recent events (2)
- — J (S) $7000.00
- — Z (S) $7000.00
1910.147 C07 IA
- Issued
- Jan 4, 2010
- Abate by
- Jan 29, 2010
- Penalty
- Initial $7,000 · Current $7,000
Recent events (2)
- — J (S) $7000.00
- — Z (S) $7000.00
1910.147 D04 I
- Issued
- Jan 4, 2010
- Abate by
- Jan 14, 2010
- Penalty
- Initial $7,000 · Current $7,000
Recent events (2)
- — J (S) $7000.00
- — Z (S) $7000.00
1910.147 F03 I
- Issued
- Jan 4, 2010
- Abate by
- Jan 22, 2010
- Penalty
- Initial $7,000 · Current $7,000
Recent events (2)
- — J (S) $7000.00
- — Z (S) $7000.00
1910.157 C01
- Issued
- Jan 4, 2010
- Abate by
- Jan 14, 2010
- Penalty
- Initial $1,500 · Current $1,500
Recent events (2)
- — J (S) $1500.00
- — Z (S) $1500.00
1910.176 B
- Issued
- Jan 4, 2010
- Abate by
- Jan 14, 2010
- Penalty
- Initial $7,000 · Current $7,000
Recent events (2)
- — J (S) $7000.00
- — Z (S) $7000.00
1910.178 A04
- Issued
- Jan 4, 2010
- Abate by
- Jan 29, 2010
- Penalty
- Initial $7,000 · Current $7,000
Recent events (2)
- — J (S) $7000.00
- — Z (S) $7000.00
1910.178 L01 I
- Issued
- Jan 4, 2010
- Abate by
- Jan 29, 2010
- Penalty
- Initial $7,000 · Current $7,000
Recent events (2)
- — J (S) $7000.00
- — Z (S) $7000.00
1910.212 B
- Issued
- Jan 4, 2010
- Abate by
- Jan 14, 2010
- Penalty
- Initial $7,000 · Current $7,000
Recent events (2)
- — J (S) $7000.00
- — Z (S) $7000.00
1910.219 C03
- Issued
- Jan 4, 2010
- Abate by
- Jan 29, 2010
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- — J (S) $2500.00
- — Z (S) $2500.00
1910.243 B02
- Issued
- Jan 4, 2010
- Abate by
- Jan 22, 2010
- Penalty
- Initial $1,500 · Current $1,500
Recent events (2)
- — J (S) $1500.00
- — Z (S) $1500.00
1910.253 B04 III
- Issued
- Jan 4, 2010
- Abate by
- Jan 14, 2010
- Penalty
- Initial $7,000 · Current $7,000
Recent events (2)
- — J (S) $7000.00
- — Z (S) $7000.00
1910.303 G01 II
- Issued
- Jan 4, 2010
- Abate by
- Jan 14, 2010
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- — J (S) $2500.00
- — Z (S) $2500.00
1910.1200 F05 I
- Issued
- Jan 4, 2010
- Abate by
- Jan 14, 2010
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- — J (S) $2500.00
- — Z (S) $2500.00
1910.1200 F05 II
- Issued
- Jan 4, 2010
- Abate by
- Jan 14, 2010
Recent events (2)
- — J (S)
- — Z (S)
More inspections at CES Environmental Services, INC.
View CES Environmental Services, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 562998)
More inspections in TX
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 312919442.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.