OSHA Inspection: GOLD RUSH, INCORPORATED

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of GOLD RUSH, INCORPORATED in 920 STONE HILL ROAD, DENVER, PA 17517 (NAICS 336214). OSHA activity number 314239328.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Gold Rush, Incorporated — free Get an email when a new federal OSHA severe-injury report for Gold Rush, Incorporated is published. One employer, no account, unsubscribe in one click.
Site address
920 STONE HILL ROAD
City
DENVER
State
PA
ZIP
17517
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
336214
SIC code (legacy)
3799
Employees
24
Ownership type
A
Industry flags
Manufacturing safety.

14 citations on file for this inspection.

5(a)(1)

Serious Gravity 02 2 instances 2 exposed
Issued
Aug 12, 2010
Abate by
Dec 20, 2010
Penalty
Initial $600 · Current $420 Reduced
Section 5(a)(1) of the  Occupational Safety and Health Act of 1970: The
employer did not
furnish employment and a place of employment which were free from
recognized hazards that
were causing or likely to cause death or serious physical harm to
employees in that employees
were exposed to potential crushing injuries from a falling load while
using a lifting device which
was not determined to be safe.
(a)Base Department - Employees use lifting devices made in house to lift
the side
walls of a trailer.  The employer did not insure that the lifting devices
were
labeled with the rated capacity, manufacturer name and address and a serial
number, on or about May 13, 2010.
(b)Fabrication Department - An employee uses a lifting device made in
house to lift
the dies for the press brake.  The employer did not insure that the
lifting device
was labeled with rated capacity, manufacturer name and address and a serial
number, on or about May 13, 2010.
ABATEMENT NOTE:
Among other methods, one feasible means of abatement would be contained in
ASME
B30.20- 2003 Below the Hook Lifting Device in that the company would have
an
engineer determine the rated capacity and mark the information along with
the
manufactures name and address, serial number and the lifting device weigh
if over 100
lbs on the device.  The device must also be inspected periodically, proof
tested and
certified and insure that the weight of the device is figured into the
weight that can be
lifted.
VERIFICATION REQUIRED
Recent events (3)
  • — P (S) $420.00
  • — I (S) $420.00
  • — Z (S) $600.00

1910.23 C01

Serious Gravity 03 3 instances 1 exposed
Issued
Aug 12, 2010
Abate by
Sep 14, 2010
Penalty
Initial $750 · Current $525 Reduced
Recent events (2)
  • — I (S) $525.00
  • — Z (S) $750.00

1910.147 C01

Serious Gravity 03 1 instance 1 exposed
Issued
Aug 12, 2010
Abate by
Oct 20, 2010
Penalty
Initial $750 · Current $525 Reduced
Recent events (3)
  • — P (S) $525.00
  • — I (S) $525.00
  • — Z (S) $750.00

1910.147 C04 I

Serious Gravity 03 1 instance 1 exposed
Issued
Aug 12, 2010
Abate by
Oct 20, 2010
Recent events (2)
  • — P (S)
  • — Z (S)

1910.178 A04

Serious Gravity 02 1 instance 2 exposed
Issued
Aug 12, 2010
Abate by
Sep 14, 2010
Penalty
Initial $600 · Current $420 Reduced
Recent events (2)
  • — I (S) $420.00
  • — Z (S) $600.00

1910.178 A05

Serious Gravity 02 1 instance 2 exposed
Issued
Aug 12, 2010
Abate by
Sep 14, 2010

1910.178 L04 III

Serious Gravity 02 1 instance 3 exposed
Issued
Aug 12, 2010
Abate by
Oct 20, 2010
Recent events (2)
  • — P (S)
  • — Z (S)

1910.212 A01

Serious Gravity 03 3 instances 3 exposed
Issued
Aug 12, 2010
Abate by
Sep 14, 2010
Penalty
Initial $750 · Current $525 Reduced
Recent events (2)
  • — I (S) $525.00
  • — Z (S) $750.00

1910.212 A03 II

Serious Gravity 03 4 instances 2 exposed
Issued
Aug 12, 2010
Abate by
Oct 14, 2010
Penalty
Initial $750 · Current $525 Reduced
Recent events (3)
  • — P (S) $525.00
  • — I (S) $525.00
  • — Z (S) $750.00

1910.213 H01

Serious Gravity 03 2 instances 3 exposed
Issued
Aug 12, 2010
Abate by
Nov 14, 2010
Penalty
Initial $750 · Current $525 Reduced
Recent events (3)
  • — P (S) $525.00
  • — I (S) $525.00
  • — Z (S) $750.00

1910.213 H03

Serious Gravity 01 1 instance 1 exposed
Issued
Aug 12, 2010
Abate by
Sep 14, 2010

1910.219 C02 I

Serious Gravity 01 1 instance 1 exposed
Issued
Aug 12, 2010
Abate by
Sep 14, 2010
Penalty
Initial $450 · Current $315 Reduced
Recent events (2)
  • — I (S) $315.00
  • — Z (S) $450.00

1910.219 I02

Serious Gravity 01 1 instance 1 exposed
Issued
Aug 12, 2010
Abate by
Sep 14, 2010
Penalty
Initial $450 · Current $315 Reduced
Recent events (2)
  • — I (S) $315.00
  • — Z (S) $450.00

1910.305 G01 IVA

Serious Gravity 01 1 instance 1 exposed
Issued
Aug 12, 2010
Abate by
Sep 14, 2010
Penalty
Initial $450 · Current $315 Reduced
Recent events (2)
  • — I (S) $315.00
  • — Z (S) $450.00

View Gold Rush, Incorporated's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 314239328.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.