SAN JOSE, CA —
OSHA Inspection: U.S. POSTAL SERVICE - SAN JOSE
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of U.S. POSTAL SERVICE - SAN JOSE in 1750 LUNDY AVE, SAN JOSE, CA 95101 (NAICS 491110). OSHA activity number 315175349.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- U.S. POSTAL SERVICE - SAN JOSE
- Site address
- 1750 LUNDY AVE
- City
- SAN JOSE
- State
- CA
- ZIP
- 95101
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 491110
- SIC code (legacy)
- 4311
- Employees
- 830
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
7 citations on file for this inspection.
5(a)(1)
- Issued
- Jul 20, 2011
- Abate by
- Aug 15, 2011
- Penalty
- Initial $5,500 · Current $5,500
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of unsafe hoist installation: (a)Battery Room (J-81) - On or about January 24, 2011 and at times prior thereto, it was observed that the Kone Crane CXT-300 overhead underhung hoist was operated without the load being centered causing 2-parts of wire rope from a 4-part block to rub against the battery charger shelving. This unsafe practice exposed the wire rope to increased frictional wear, abrasion and damage. The employer failed to ensure that the load lines, block and hoist were clear of all obstacles before moving the load lines. Among other methods, the following feasible and acceptable methods can be implemented to correct this hazard by complying with the following: Comply with the consensus standard promulgated by the American Society of Mechanical Engineers (ASME) B30.16-2007, Overhead Hoists (Underhung), Safety Standards for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks and Slings: Chapter 16-3, Section 16-3.1.2 (g) and Section 16-3.1.3 (d): Hoists shall not be operated unless the hoist unit is centered over the load, except when authorized by a qualified person who has determined that the components of the hoist and its mounting will not be overstressed. Should it be necessary to pick a load that is not centered under the hoist unit, precautions shall be taken to control the swing of the load when it is picked clear of its support. The operator shall make sure the load and hoist will clear all obstacles before moving or rotating the load. Either move the overhead hoist and support structure or remove the shelving so the 2- parts of wire rope on the 4-part block will not rub against the shelf.
Recent events (2)
- — I (S) $5500.00
- — Z (S) $5500.00
5(a)(1)
- Issued
- Jul 20, 2011
- Abate by
- Aug 15, 2011
- Penalty
- Initial $5,500 · Current $5,500
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of overhead hoist failure as a result of inadequate and/or failure to conduct frequent inspections and to perform preventive maintenance: (a)Battery Room (J-81) - On or about January 24, 2011 and at times prior thereto, the employer failed to implement an effective preventive maintenance and frequent inspection program for the Kone Crane CXT-300 overhead underhung hoist to identify hazards such as but not limited to proper installation, proper wearing of components, and unimpeded hoisting for the load. Among other methods, the following feasible and acceptable methods can be implemented to correct this hazard is to comply with the requirements promulgated in the consensus standard ASME B30.16-2007, Overhead Hoists (Underhung), Safety Standards for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks and Slings: 1.Designate a person to conduct frequent visual inspections to include the components of Section 16-2.1.2. 2.Inspection reports and records should be maintained at time intervals specified in paragraph 16-2.1.1 (b) (2). Records should be stored where they are available to appointed persons. 3.A preventive maintenance program should be established based on the recommendations outlined by the manufacturer's manual. Dated records should be placed on file. Section 16-2.3.1 4.Any condition disclosed by the inspections performed in accordance with the requirements of Section 16-2.1 that is determined to be a hazard to continued operation shall be corrected by adjustment, repair or replacement before continuing the use of the hoist. Section 16-2.3.3 5.A long-range rope inspection program should be established and should include records on examination of ropes removed from service so a relationship can be established between visual observation and actual condition of the rope. Section 16-2.1.5 6.Maintain a copy of the manufacturer's operational and maintenance manual at the work site. Section 16-1.2.17 (b)Battery Room (J-81) - On or about 1/24/11 and at times prior thereto, it was observed that the Kone Crane CXT-300 overhead underhung hoist pendant label was illegible.
Recent events (2)
- — I (S) $5500.00
- — Z (S) $5500.00
5(a)(1)
- Issued
- Jul 20, 2011
- Abate by
- Aug 15, 2011
- Penalty
- Initial $5,500 · Current $5,500
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of overhead hoist being operated by unqualified personnel: (a)Battery Room (J-81) - On or about January 24, 2011, a determination was made through employee interviews that employees operating the Kone Crane CXT-300 overhead underhung hoist did not receive training on the manufacturer's operational instructions. The employer did not have a copy of the manufacturer's manual on site to ensure safe operation of the overhead hoist. Among other methods, the following feasible and acceptable methods can be implemented to correct this hazard is to comply with the following: 1.Obtain, follow and train/instruct employees on the requirements for safe operation, inspection, and maintenance as out lined in the manufacturer's guidelines as set forth in the equipment manual. 2.Obtain, follow and train/instruct employees on the requirements for safe operation,inspection, and maintenance as out lined in the ASME B30.16-2007, Overhead Hoists (Underhung), Safety Standards for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks and Slings, Chapter 16-3.
Recent events (2)
- — I (S) $5500.00
- — Z (S) $5500.00
1910.132 D01 I
- Issued
- Jul 20, 2011
- Abate by
- Aug 15, 2011
- Penalty
- Initial $5,500 · Current $5,500
Recent events (2)
- — I (S) $5500.00
- — Z (S) $5500.00
1910.136 A
- Issued
- Jul 20, 2011
- Abate by
- Aug 15, 2011
Recent events (2)
- — I (S)
- — Z (S)
5(a)(1)
- Issued
- Jul 20, 2011
- Abate by
- Aug 15, 2011
- Penalty
- Initial $60,500 · Current $7,000 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of wire rope failure: (a)Battery Room (J-81) and throughout the postal facility: - On or about January 24, 2011 and at times prior thereto, it was observed that the Kone Crane CXT-300 overhead underhung hoist's wire rope exhibited birdcaging damage as a result of lifting an imposed load greater than the modulus of elasticity of the wire rope. This action resulted in permanent deformation of the wire rope and a decreased lifting capacity of the hoist due to the compromised strength of the wire rope. As a result of the damage, the running wire rope for this hoist was in an out-of-service condition on or about November 1, 2010. The employer knowingly continued to operate with this damaged running wire rope for an extended period of time, thereby exposing employees to the potential for severe injury or death in the event of a catastrophic wire rope failure. The employer continued to operate even after being informed verbally on several occasions starting on or about November 1, 2010. In addition, the employer continued to operate the hoist after being notified by email on several occasions as well. The employer was notified by email on January 1, 2011, January 12, 2011, and January 18, 2011. The employer was also notified verbally and in writing by a Kone Crane service representative on January 14, 2011 that the running wire rope was damaged and required replacement. Furthermore, the employer was notified by OSHA on or about January 24, 2011 of the unsafe condition. On January 27, 2011 the employer submitted a request to Kone Cranes for replacement of the wire rope. The hoist was continually used several times daily until February 1, 2001, when the wire rope was replaced. The employer elected to use the Kone Crane CXT-300 overhead underhung hoist in an out-of-service condition regardless of the fact that a portable hoist was on site, providing a feasible means of temporary abatement. One feasible and acceptable abatement method to correct the hazard is to replace the cable per the manufacturer's specifications and the requirements of ASME B30.16-2007, Overhead Hoists (Underhung), Safety Standards for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks and Slings. Additionally, the employer should develop a preventative maintenance program which incorporates all manufacturers' recommendations and the requirements of ASME B30.16-2007, Overhead Hoists (Underhung), Safety Standards for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks and Slings with written signed and dated reports. In addition, follow the out of service critieria for wire rope as specified in ASME B30.16-2007, Sections 16-2.4.1 and 16- 2.4.2, once a rope reaches any on specified removal criteria, it may be allowed to operate to the end of the work the judgment of a qualified person. The rope shall be replaced after that work of the day, or at the latest time prior to the equipment being used by the next work shift.
Recent events (2)
- — I (S) $7000.00
- — Z (W) $60500.00
1910.178 A04
- Issued
- Jul 20, 2011
- Abate by
- Aug 15, 2011
- Penalty
- Initial $5,500 · Current $5,500
Recent events (2)
- — I (W) $5500.00
- — Z (W) $5500.00
More inspections at U.S. Postal Service - SAN Jose
View U.S. Postal Service - SAN Jose's full OSHA safety record →
More inspections in this industry (NAICS 491110)
More inspections in CA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 315175349.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.