MIDDLETON, MA —
OSHA Inspection: BOSTIK, INC.
Unprogrammed Related inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Related safety inspection of BOSTIK, INC. in 211 BOSTON STREET, MIDDLETON, MA 01949 (NAICS 325520). OSHA activity number 315298307.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- BOSTIK, INC.
- Site address
- 211 BOSTON STREET
- City
- MIDDLETON
- State
- MA
- ZIP
- 01949
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 325520
- SIC code (legacy)
- 2891
- Employees
- 755
- Ownership type
- A
Citations
28 citations on file for this inspection.
1910.119 C01
- Issued
- Sep 12, 2011
- Abate by
- Apr 19, 2012
- Penalty
- Initial $7,000
General-duty citation text
29 CFR 1910.119(c)(1): The employer did not develop a written plan of action regarding the implementation of the employee participation required by 29 CFR 1910.119: (a) Location - Direct Solvation - Building 9: On or about the time of the Inspection, the employer did not develop a written plan of action regarding the implementation of employee participation in the development of a process safety management plan or process hazard analysis.
Recent events (2)
- — F (S)
- — Z (S) $7000.00
1910.119 C02
- Issued
- Sep 12, 2011
- Abate by
- Apr 19, 2012
- Penalty
- Initial $7,000
General-duty citation text
29 CFR 1910.119(c)(2): The employer did not consult with employees and their representative on the conduct and development of process hazard analyses: (a) Location - Direct Solvation - Building 9: On or about the time of the Inspection, the employer did not include employee involvement by non lead employees in the development of the process hazard analysis (PHA), standard operating procedures, mechanical integrity and incident investigations
Recent events (2)
- — F (S)
- — Z (S) $7000.00
1910.119 D03 IH
- Issued
- Sep 12, 2011
- Abate by
- Apr 19, 2012
- Penalty
- Initial $7,000
General-duty citation text
29 CFR 1910.119(d)(3)(i)(H): Process safety information pertaining to the equipment in the process did not include the safety systems (e.g. interlocks, detection or suppression systems): (a) Location - Direct Solvation, Building 9: On or about the time of the Inspection, the process safety information (PSI) pertaining to the equipment in the process did not include documentation that equipment, including but not limited to valves, electrical wiring and safety systems such as interlocks and suppression systems, complied with recognized and generally accepted good engineering practices (RAGAGEP).
Recent events (2)
- — F (S)
- — Z (S) $7000.00
1910.119 D03 II
- Issued
- Sep 12, 2011
- Abate by
- Apr 19, 2012
General-duty citation text
29 CFR 1910.119(d)(3)(ii): The employer did not document that the equipment in the process complied with recognized and generally accepted good engineering practices: (a) Location - Direct Solvation, Building 9: On or about the time of the Inspection, the process safety information (PSI) pertaining to the equipment in the process did not include documentation that equipment, including but not limited to valves, electrical wiring and safety systems such as interlocks and suppression systems, complied with recognized and generally accepted good engineering practices (RAGAGEP).
Recent events (2)
- — F (S)
- — Z (S)
1910.119 E03 I
- Issued
- Sep 12, 2011
- Abate by
- Apr 19, 2012
- Penalty
- Initial $7,000 · Current $6,500 Reduced
General-duty citation text
29 CFR 1910.119(e)(3)(i): The process hazard analysis did not address the hazards of the process: (a) Location - Direct Solvation - Building 9: On or about the time of the Inspection, the process hazard analysis (PHA) did not fully identify the hazards of power failure.
Recent events (2)
- — F (S) $6500.00
- — Z (S) $7000.00
1910.119 E03 II
- Issued
- Sep 12, 2011
- Abate by
- Apr 19, 2012
- Penalty
- Initial $7,000
General-duty citation text
29 CFR 1910.119(e)(3)(ii): The process hazard analysis did not identify any previous incident which had a likely potential for catastrophic consequencces in the workplace: (a) Location - Direct Solvation - Building 9: On or about the time of the Inspection, the process hazard analysis (PHA) did not identify the following incidents: 1. In March 2009, a rupture disk blew resulting in a 1,000 pound spill of MEK, toluene, and polyester resin. 2. In March 2009, a rupture disk blew resulting in a 15 gallon spill of MEK. 3. In April 2009, an over-pressurization in the Solvator resulted in a spill of MEK. 4. In October 2009, a power outage occurred at the facility resulting in fires in the freezer pumps.
Recent events (2)
- — F (S)
- — Z (S) $7000.00
1910.119 E03 III
- Issued
- Sep 12, 2011
- Abate by
- Apr 19, 2012
- Penalty
- Initial $7,000 · Current $6,500 Reduced
General-duty citation text
29 CFR 1910.119(e)(3)(iii): The process hazard analysis did not address the engineering and administrative controls applicable to the hazards and their interrelationship, such as, appropriate of detection methodologies to provide early warning of releases: (a) Location irect Solvation uilding 9: On or about the time of the Inspection, the employers process hazard analysis did not identify adequate safeguards to control high consequence hazards. For example, the employer chose to address the potential of leaving valves in the wrong position with administrative controls (such as training and procedures) in order to prevent catastrophic hazards. Engineering controls were feasible and should have been used.
Recent events (2)
- — F (S) $6500.00
- — Z (S) $7000.00
1910.119 E05
- Issued
- Sep 12, 2011
- Abate by
- Apr 19, 2012
- Penalty
- Initial $7,000 · Current $6,500 Reduced
General-duty citation text
29 CFR 1910.119(e)(5): The employer did not establish a system to promptly address the process hazard analysis team's findings and recommendations: (a) Location - Direct Solvation - Building 9: On or about the time of the Inspection, the employer did not fully address team findings and recommendations in the Solvator process hazard analysis (PHA) in a timely manner or that the resolution was documented and closed: 1) The recommendation for verifying that the pressure relief valves were in place and what the valve was rated for; 2) The recommendation that a check valve be installed to prevent back flow when adding flammable liquids to the Solvator; 3) The recommendation to upgrade the Solvator cooling system; 4) The recommendation to automate pressure control for Nitrogen; and 5) The recommendation to add relief valve in filter housing to vent back to Solvator.
Recent events (2)
- — F (S) $6500.00
- — Z (S) $7000.00
1910.119 F01
- Issued
- Sep 12, 2011
- Abate by
- Apr 19, 2012
- Penalty
- Initial $7,000 · Current $6,500 Reduced
General-duty citation text
29 CFR 1910.119(f)(1): The employer did not develop and implement written operating procedures that provided clear instructions for safety conducting activities in each covered process consistentwith the process safety information and which addressed the elements listed in 29 CFR 1910.119(f)(1)(i) through (f)(1)(iv): (a) Location - Direct Solvation: On or about the time of the Inspection, operating procedures were not developed and implemented to address communication and other activities involving shift changes.
Recent events (2)
- — F (S) $6500.00
- — Z (S) $7000.00
1910.119 F01 IC
- Issued
- Sep 12, 2011
- Abate by
- Apr 19, 2012
- Penalty
- Initial $7,000 · Current $6,500 Reduced
General-duty citation text
29 CFR 1910.119(f)(1)(i)(C): The employer's written operating procedures covering the steps for each operating phase did not address temporary operations: (a) Location - Direct Solvation, Building 9: On or about the time of the Inspection, the written operating procedure, DS-028; Rev: 2-Breaking Vacuum on R8, did not provide procedures for operating the backup vacuum pumps.
Recent events (2)
- — F (S) $6500.00
- — Z (S) $7000.00
1910.119 F01 IE
- Issued
- Sep 12, 2011
- Abate by
- Apr 19, 2012
- Penalty
- Initial $7,000
General-duty citation text
29 CFR 1910.119(f)(1)(i)(E): The employer's written operating procedures covering the steps for each operating phase did not address emergency operations: (a) Location - Direct Solvation, Building 9: On or about the time of the Inspection, the written operating procedure, DS-028; Rev: 2-Breaking Vacuum on R8, did not fully outline the specific steps to be performed to stop the process in the event of an emergency. (b) Location - Direct Solvation, Building 9: On or about the time of the inspection, the written operating procedure, DS-011; Rev: 2 Transfer of Resin from R8 to Solvator did not fully describe certain symptoms that would indicate a potential emergency condition or fully address methods of investigation if one of these symptoms is observed. Further, the company did not have a separate operating procedure to describe what to do in the event that a potential flammable mixture has been released into the facility.
Recent events (2)
- — F (S)
- — Z (S) $7000.00
1910.119 F01 IIA
- Issued
- Sep 12, 2011
- Abate by
- Apr 19, 2012
- Penalty
- Initial $7,000
General-duty citation text
29 CFR 1910.119(f)(1)(ii)(A): The employer's written operating procedures covering the operating limits did not address consequences of deviation beyond such operating limits: (a) Location - Direct Solvation, Building 9: On or about the time of the Inspection, the written operating procedure, DS-028; Rev: 2-Breaking Vacuum on R8, did not fully address consequences of deviation beyond operating limits. (b) Location - Direct Solvation, Building 9: On or about the time of the Inspection, the written operating procedure DS-011; Rev:2 - Transfer of Resin from R8 to Solvator, did not fully address consequences of mixing of high temperature product with solvent in the solvator.
Recent events (2)
- — F (S)
- — Z (S) $7000.00
1910.119 F01 IIB
- Issued
- Sep 12, 2011
- Abate by
- Apr 19, 2012
- Penalty
- Initial $7,000
General-duty citation text
29 CFR 1910.119(f)(1)(ii)(B): The employer's written operating procedures covering the operating limits did not address the steps required to correct or avoid deviation beyond such operating limits: (a) Location - Direct Solvation, Building 9: On or about the time of the Inspection, the written operating procedure, DS-028; Rev: 2-Breaking Vacuum on R8, did not fully address the steps required to correct or avoid deviation beyond operating limits. (b) Location - Direct Solvation, Building 9: On or about the time of the Inspection, the written operating procedure DS-011; Rev:2 - Transfer of Resin from R8 to Solvator, did not fully address the steps required to correct or avoid mixing high temperature product with solvent in the solvator.
Recent events (2)
- — F (S)
- — Z (S) $7000.00
1910.119 G02
- Issued
- Sep 12, 2011
- Abate by
- Apr 19, 2012
- Penalty
- Initial $7,000
General-duty citation text
29 CFR 1910.119(g)(2): The employer did not provide refresher training at least every three years to each employee involved in operating a process to assure that the employee understands and adheres to the current operating procedures of the process: (a) Direct Solvation - Building 9: On or about the time of the Inspection, the employer did not provide refresher training and assure that employees understood current operating procedures.
Recent events (2)
- — F (S)
- — Z (S) $7000.00
1910.119 H02 II
- Issued
- Sep 12, 2011
- Abate by
- Apr 19, 2012
- Penalty
- Initial $7,000 · Current $6,500 Reduced
General-duty citation text
29 CFR 1910.119(h)(2)(ii): The employer did not inform contract employers of the known potential fire, explosion, or toxic release hazards related to the contractor's work and the process: (a) Location - Direct Solvation - Building 9: On or about the time of the Inspection, the employer did not inform electrical contract employees working on or near a covered process of the known fire and explosion hazards.
Recent events (2)
- — F (S) $6500.00
- — Z (S) $7000.00
1910.119 J02
- Issued
- Sep 12, 2011
- Abate by
- Apr 19, 2012
- Penalty
- Initial $7,000 · Current $6,500 Reduced
General-duty citation text
29 CFR 1910.119(j)(2): The employer did not establish and implement written procedures to maintain the on-going mechanical integrity of process equipment: (a) Location - Direct Solvation - Building 9: On or about the time of the Inspection, the company did not have a written mechanical integrity program that addressed the preventive maintenance, inspection and testing for pumps.
Recent events (2)
- — F (S) $6500.00
- — Z (S) $7000.00
1910.119 J04 III
- Issued
- Sep 12, 2011
- Abate by
- Apr 19, 2012
- Penalty
- Initial $7,000 · Current $6,500 Reduced
General-duty citation text
29 CFR 1910.119(j)(4)(iii): The frequency of inspections and tests of process equipment to maintain its mechanical integrity, was not consistent with applicable manufacturers' recommendations and good engineering practices, or more frequently determined to be necessary by prior operating experience: (a) Location - Direct Solvation, Building 9: On or about the time of the Inspection, inspection and testing frequency of the process vapor ventilation system was not frequent enough to prevent clogging of vapor system components due to excessive buildup of vapor condensate.
Recent events (2)
- — F (S) $6500.00
- — Z (S) $7000.00
1910.119 J05
- Issued
- Sep 12, 2011
- Abate by
- Apr 19, 2012
- Penalty
- Initial $7,000 · Current $6,500 Reduced
General-duty citation text
29 CFR 1910.119(j)(5): The employer did not correct deficiencies in equipment that were outside acceptable limits (as defined by process information in 29 CFR 1910.119(d) before further use or in a safe and timely manner: (a) Location - Direct Solvation uilding 9: On or about the time of the Inspection, the employer did not fully correct deficiencies on process equipment before further use or in a timely manner. Uncorrected deficiencies that were noted in mechanical integrity inspections and had not been corrected include but are not limited to corrosion on process vessels, leaks under or through insulation on process vessels, leaks on flanges, and leaks in plugs.
Recent events (2)
- — F (S) $6500.00
- — Z (S) $7000.00
1910.119 L01
- Issued
- Sep 12, 2011
- Abate by
- Apr 19, 2012
- Penalty
- Initial $7,000 · Current $6,500 Reduced
General-duty citation text
29 CFR 1910.119(l)(1): The employer did not establish and implement written procedures to manage changes to process chemicals, technology, equipment, and procedures; and, changes to facilities that affect a covered process: (a) Location - Direct Solvation, Building 9: On or about the time of the Inspection, the employer did not effectively implement the change of two manually controlled valves with an air actuated valve.
Recent events (2)
- — F (S) $6500.00
- — Z (S) $7000.00
1910.119 L04
- Issued
- Sep 12, 2011
- Abate by
- Apr 19, 2012
- Penalty
- Initial $7,000 · Current $6,500 Reduced
General-duty citation text
29 CFR 1910.119(l)(4): A change covered by 29 CFR 1910.119(l) resulted in a change in the process safety information required by 29 CFR 1910.119(d) and the process information was not updated: (a) Location - Direct Solvation, Building 9: On or about the time of Inspection, the piping & instrument diagrams (P&ID) for the solvator did not reflect the replacement of two manual valves with a single air actuated valve/transfer valve.
Recent events (2)
- — F (S) $6500.00
- — Z (S) $7000.00
1910.119 L05
- Issued
- Sep 12, 2011
- Abate by
- Apr 19, 2012
- Penalty
- Initial $7,000 · Current $6,500 Reduced
General-duty citation text
29 CFR 1910.119(l)(5): A change covered 29 CFR 1910.119(l) resulted in a change in the operating procedures or practices required by 29 CFR 1910.119(f), and such procedures or practices were not updated: (a) Location - Direct Solvation, Building 9: On or about the time of the Inspection, the operating procedure DS-011; Rev: 2 - Transfer of Resin from R8 to Solvator, did not reflect the replacement of two manual valves referenced in the procedure with a single air actuated valve/transfer valve.
Recent events (2)
- — F (S) $6500.00
- — Z (S) $7000.00
1910.119 M01
- Issued
- Sep 12, 2011
- Abate by
- Apr 19, 2012
- Penalty
- Initial $7,000 · Current $6,500 Reduced
General-duty citation text
29 CFR 1910.119(m)(1): The employer did not investigate each incident which resulted in, or could reasonably have resulted in, a catastrophic release of a highly hazardous chemical in the workplace: (a) Location - Direct Solvation - Building 9: On or about the time of the Inspection, the employer did not conduct an investigation of an incident that occurred prior to the explosion in which solvent was added to high temperature product in the Solvator prior to cooling resulting in a vapor release of polyester distillate.
Recent events (2)
- — F (S) $6500.00
- — Z (S) $7000.00
1910.119 M05
- Issued
- Sep 12, 2011
- Abate by
- Apr 19, 2012
- Penalty
- Initial $7,000
General-duty citation text
29 CFR 1910.119(m)(5): The employer did not establish a system to promptly address and resolve the incident investigation report findings and recommendations: (a) Location - Direct Solvation, Building 9: On or about the time of the Inspection, recommendations made to resolve findings resulting from an incident investigation conducted on 10/24/2008, which involved a vapor release due to clogged vent lines, had not been resolved. (b) Location - Polyurethane: On or about the time of the Inspection, recommendations made to resolve findings resulting from an incident investigation conducted on 09/13/2010, which involved over pressurization of a vessel due to a plugged flame arrestor, had not been resolved.
Recent events (2)
- — F (S)
- — Z (S) $7000.00
1910.178 L03 IIF
- Issued
- Sep 12, 2011
- Abate by
- Apr 19, 2012
- Penalty
- Initial $7,000 · Current $6,500 Reduced
General-duty citation text
29 CFR 1910.178(l)(3)(ii)(F) Powered industrial truck operators did not receive initial training in the workplace related topic of Hazardous (classified) locations where the vehicle will be operated. (a) Location - Direct Solvation - Building 9: On or about the time of the Inspection, the employer did not train their powered industrial truck operators on the hazards of operating in a classified location.
Recent events (2)
- — F (S) $6500.00
- — Z (S) $7000.00
1910.119 D03 I
- Issued
- Sep 12, 2011
- Abate by
- Apr 19, 2012
- Penalty
- Initial $70,000 · Current $69,500 Reduced
General-duty citation text
29 CFR 1910.119(d)(3)(i): Process safety information (PSI) pertaining to the equipment in the process did not include the elements specified in 29 CFR 1910.119(d)(3)(i)(A) through (H): (a) Location - Direct Solvation, Building 9: On or about the time of the Inspection, certain process safety information (PSI) pertaining to the equipment in the process was not adequate; examples include but are not limited to: 1) PSI for the emergency relief systems was missing elements such as but not limited to design codes and upset scenarios. 2) PSI for the process vapor capture system was missing elements such as but not limited to design codes, materials of construction, and limitations of the system. 3) PSI for piping/pumps was missing elements such as but not limited to materials of construction, pump curves and compatibilities between the pumps and piping. 4) PSI for flexible hoses was not available. 5) The PSI related to ventilation system design was missing elements such as but not limited to the volume of the process areas, surface area of exhaust vents, the number of air changes per hour and did not identify the areas where the exhaust system discharged.
Recent events (2)
- — F (W) $69500.00
- — Z (W) $70000.00
1910.119 E03 II
- Issued
- Sep 12, 2011
- Abate by
- Apr 19, 2012
- Penalty
- Initial $70,000 · Current $70,000
General-duty citation text
29 CFR 1910.119(e)(3)(ii): The process hazard analysis did not identify previous incidents which had a likely potential for catastrophic consequencces in the workplace: (a) Location - Direct Solvation - Building 9, Solvent Cement - Building 24 and Polyester - Building 36: On or about the time of the Inspection, the process hazard analysis (PHA) did not address the following incidents to control impacts to process equipment from powered industrial vehicles including damage to ventilation trunks, storage racks, water lines and electrical equipment. 1) In Direct Solvation on 11/4/09, a ventilation trunk was struck by a tote being lifted by a forklift. 2) In Solvent Cement on 11/2/09 a forklift struck a storage rack. 3) In Polyester Building 36, on 4/27/09, a forklift struck a water line causing it to rupture and also damaged an electrical box.
Recent events (2)
- — F (W) $70000.00
- — Z (W) $70000.00
1910.119 E03 VI
- Issued
- Sep 12, 2011
- Abate by
- Apr 19, 2012
- Penalty
- Initial $70,000
General-duty citation text
29 CFR 1910.119(e)(3)(vi): The process hazard analysis did not address human factors: (a) Location - Direct Solvation, Building 9: On or about the time of the Inspection, the process hazard analysis did not fully address human factors including, but not limited to, shift changes for operators, critical alarms or sounds, and excessive overtime.
Recent events (2)
- — F (W)
- — Z (W) $70000.00
1910.178 M11
- Issued
- Sep 12, 2011
- Abate by
- Apr 19, 2012
- Penalty
- Initial $70,000 · Current $69,500 Reduced
General-duty citation text
29 CFR 1910.178(m)(11): Only approved industrial trucks were not used used in hazardous locations. (a) Location - Direct Solvation - Building 9: On or about the time of the Inspection, three electric powered industrial trucks designated as "E" were used in Class I hazardous locations.
Recent events (2)
- — F (W) $69500.00
- — Z (W) $70000.00
More inspections at Bostik, INC.
View Bostik, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 325520)
More inspections in MA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 315298307.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.