OSHA Inspection: OPTIMIZED PROCESS DESIGN INC.

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of OPTIMIZED PROCESS DESIGN INC. in 3781 U.S. HWY 77A NORTH, YOAKUM, TX 77995 (NAICS 236210). OSHA activity number 316301860.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Optimized Process Design INC. for free Get an email when a new federal OSHA severe-injury report for Optimized Process Design INC. is published. One employer, no account, unsubscribe in one click.
Site address
3781 U.S. HWY 77A NORTH
City
YOAKUM
State
TX
ZIP
77995
Mailing
25610 CLAY ROAD, KATY, TX 77493
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Non-union (N)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236210
SIC code (legacy)
1629
Employees
353
Ownership type
Private (A)

1 citation on file for this inspection.

5(a)(1)

Serious Gravity 05 1 instance 5 exposed
Issued
Aug 7, 2012
Abate by
Aug 13, 2012
Penalty
Initial $4,250 · Current $2,550 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish employment and a place of employment which were free from
recognized hazards that
were causing, or likely to cause, death or serious physical harm to
employees in that employees
were exposed to a struck-by hazard:
Employees were exposed to a struck-by hazard from falling "I" Beams during
the
construction of a natural gas gathering facility.
a.Link Belt crawler crane and hydraulic mobile cranes were lifting "I"
beams with a single Elephant Eye Beam Clamp.  The top flange of the "I"
Beam was held by the top opening of the jaws in the Clamp to lift the "I"
beam.
b.Employees were not provided a spreader bar with two Elephant Eye Beam
Clamps to pick up long pieces of material.
c.Employee did not receive any training prior to rigging this "I" beam.
Among other methods, one feasible and acceptable abatement method to
correct
this hazard is:
1.Implement a policy that requires a spreader bar be used with two Elephant
Eye Beam Clamps (one at each end) when picking up a long "I" Beam.
2.Implement a policy that requires that all riggers be trained in the
correct
procedures to follow when rigging a load to be lifted into place by a
crane.
Recent events (2)
  • · I (S) $2550.00
  • · Z (S) $4250.00

View Optimized Process Design INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 316301860.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.