FOND DU LAC, WI —
OSHA Inspection: SADOFF & RUDOY INDUSTRIES LLP
Federal Agency inspection · Health discipline
At a glance
On , OSHA opened a federal Agency health inspection of SADOFF & RUDOY INDUSTRIES LLP in 240 W. ARNDT ST, FOND DU LAC, WI 54936 (NAICS 423930). OSHA activity number 330972811.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- SADOFF & RUDOY INDUSTRIES LLP
- Site address
- 240 W. ARNDT ST
- City
- FOND DU LAC
- State
- WI
- ZIP
- 54936
- Mailing
- PO BOX 1138, FOND DU LAC, WI 54936
What kind of inspection was it?
- Inspection type
- Federal Agency (M)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 423930
- Employees
- 146
- Ownership type
- A
Citations
3 citations on file for this inspection.
1910.147 C04 II B
- Issued
- Oct 19, 2011
- Abate by
- Nov 18, 2011
- Penalty
- Initial $6,300 · Current $6,300
General-duty citation text
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedures did not clearly and specifically outline procedural steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy: On or before 8/10/2011, the procedure for locking out the Harris (HSC) shear for servicing did not include specific and updated information on the equipment and locations to block the clamp and shear crosshead. a.) The procedure references "pins" for the crosshead without identifying the change in blocking device and a specific location when an I-beam was placed on either side of that component. b.) The procedure references pins for the clamp, without identifying the sequence to check that they were properly installed. c.) The procedure does not identify the process or requirement for an orderly check that all lockout elements had been implemented correctly during a group lockout process.
Recent events (1)
- — Z (S) $6300
1910.147 C07 I A
- Issued
- Oct 19, 2011
- Abate by
- Nov 18, 2011
- Penalty
- Initial $6,300 · Current $6,300
General-duty citation text
29 CFR 1910.147(c)(7)(i)(A): Authorized employee(s) did not receive training in the recognition of applicable hazardous energy sources, the type and magnitude of the energy available in the workplace, and the methods and means necessary for energy isolation: a.) Up to and including 8/10/2011, the Harris shear work crew responsible for changing shear blades and other regular service were not trained in the potential for immediate release of the clamp when the liner bunched up and potentially interfered with the sensor for the bypass hydraulic pressure system. They also were not trained in evaluating the potential hazard of interfering with safety systems when maintaining lockout overnight. b.) Authorized employees were not trained in the lockout checklist. They signed off on a lockout checklist that did not specify procedures performed, did not verify actions taken, and were incomplete in many instances (# employees did not match #signatures, only portions were checked off, etc.). Employees were not trained to complete the checklist as an affirmation that all elements of the lockout had been initiated.
Recent events (1)
- — Z (S) $6300
1910.147 C07 III A
- Issued
- Oct 19, 2011
- Abate by
- Nov 18, 2011
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(7)(iii)(A): Retraining was not provided for authorized and affected employees when there was a change in their job assignments, a change in machines, equipment or processes that presented a new hazard, or when there was a change in the energy control procedures: Employees performing lock out during regular servicing of the Harris (HSC) shear were not retrained on potential hazards when the equipment was modified: a.) I-beams were used in lieu of safety pins to block the crosshead; b.) The liners were bent and crumpled in the clamp slide, and bolts were replaced with welded components. c.) Employees were not separately instructed on which piece of equipment needed a particular block. d.) Employees were not trained in the possible hazards of liner modification or removal.
Recent events (1)
- — Z (S) $0
More inspections at Sadoff & Rudoy Industries LLP
View Sadoff & Rudoy Industries LLP's full OSHA safety record →
More inspections in this industry (NAICS 423930)
More inspections in WI
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 330972811.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.