OSHA Inspection: POLYCHEM SERVICES, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of POLYCHEM SERVICES, INC. in 3714 E. JOE ORR RD., CHICAGO HEIGHTS, IL 60411 (NAICS 541990). OSHA activity number 331069427.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Polychem Services, INC. — free Get an email when a new federal OSHA severe-injury report for Polychem Services, INC. is published. One employer, no account, unsubscribe in one click.
Site address
3714 E. JOE ORR RD.
City
CHICAGO HEIGHTS
State
IL
ZIP
60411
Mailing
3714 E. JOE ORR RD., CHICAGO HEIGHTS, IL 60411
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
541990
Employees
25
Ownership type
A

13 citations on file for this inspection.

1910.119 D02 I

Deleted Serious Gravity 5 1 instance 7 exposed
Issued
Jan 25, 2012
Abate by
Oct 10, 2012
Penalty
Initial $3,000 · Current $0 Reduced
29 CFR 1910.119(d)(2)(i):  Process safety information pertaining to the technology of the process did not include the elements specified in 29CFR1910.119(d)(2)(i)(A) through (E).    On or about August 12, 2011, the employer did not have process safety information pertaining to the technology of its resin manufacturing and amine recovery processes for the safe upper and lower limits of critical operating parameters such as, but not limited to: batch process reactor levels, pressures and temperatures, and did not evaluate the consequences of deviations, including those affecting the safety and health of employees.
Recent events (3)
  • — F (S) $0
  • — C (S) $3000
  • — Z (S) $3000

1910.119 D03 I

Deleted Serious Gravity 5 1 instance 7 exposed
Issued
Jan 25, 2012
Abate by
Oct 10, 2012
Penalty
Initial $3,000 · Current $0 Reduced
29 CFR 1910.119(d)(3)(i): Information pertaining to the equipment in the process did not include the elements specified in 29CFR1910.119(d)(3)(i) (A) through (H).    On or about August 12, 2011, the employer did not have process safety information pertaining to the equipment in its process including, but not limited to: the relief systems design and design bases on its ASME-rated high pressure reactors, equipment design codes and standards employed, pressure vessels U-1s (Manufacturers Data Reports) and safety systems (e.g. interlocks, detection or suppression systems).
Recent events (3)
  • — F (S) $0
  • — C (S) $3000
  • — Z (S) $3000

1910.119 E05

Deleted Serious Gravity 1 1 instance 1 exposed
Issued
Jan 25, 2012
Abate by
Mar 8, 2012
Penalty
Initial $1,800 · Current $0 Reduced
29 CFR 1910.119(e)(5):     The employer did not establish a system to promptly address the team's findings and recommendations; assure that the recommendations are resolved in a timely manner and that the resolution is documented; document what actions are to be taken; complete actions as soon as possible; develop a written schedule of when these actions are to be completed; communicate the actions to operating, maintenance and other employees whose work assignments are in the process and who may be affected by the recommendations or actions.     On or about August 12, 2011, the employer did not establish a system to document the resolution of the safety recommendations generated in its 9/20/2002 process hazard analysis revalidation of its Reactor 1 System, such as, but not limited to:  a.	Consider directing the foam over tank vent away from the AC unit.  b.	Consider adding an Agitator NOT running interlock.  c.	Install blanks in the hot oil supply to weigh tank WT-1B.
Recent events (3)
  • — F (S) $0
  • — C (S) $1800
  • — Z (S) $1800

1910.119 E07

Deleted Serious Gravity 5 1 instance 1 exposed
Issued
Jan 25, 2012
Abate by
Apr 19, 2012
Penalty
Initial $2,400 · Current $0 Reduced
29 CFR 1910.119(e)(7):     The employer did not retain process hazards analyses and updates or revalidations for each process covered by this section, as well as the documented resolution of recommendations described in paragraph (e)(5) of this section for the life of the process.    On or about August 12, 2011,  the employer did not retain the Process Hazard Analyses it had performed on its amine repackaging, amine recovery and resin production PSM covered processes.
Recent events (3)
  • — F (S) $0
  • — C (S) $2400
  • — Z (S) $2400

1910.119 F01

Serious Gravity 5 1 instance 1 exposed
Issued
Jan 25, 2012
Abate by
Oct 10, 2012
Penalty
Initial $3,000 · Current $1,500 Reduced
29 CFR 1910.119(f)(1):     The employer shall develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and shall address at least the following elements.       On or about August 12, 2011, the employers operating procedures did not address elements necessary to provide clear instructions for safely conducting activities involved with each covered process. Such omissions in the repackaging process (isotaner) included, but were not limited to the following elements:    a.	Emergency shutdown, including the conditions under which emergency shutdown is required, and the assignment of shutdown responsibility to qualified operators to assure that emergency shutdown is executed in a safe and timely manner.  b.	Operating limits and the consequences of deviation, also the steps required to correct or avoid deviation.  c.	Properties of and hazards presented by the chemicals used in the process and indicating precautions necessary to prevent exposure, including engineering and administrative controls and personal protective equipment.  d.	Control measures to be taken if physical contact or airborne exposure occurs.  e.	Safety systems and their functions.
Recent events (3)
  • — F (S) $1500
  • — C (S) $3000
  • — Z (S) $3000

1910.119 F03

Deleted Serious Gravity 5 1 instance 1 exposed
Issued
Jan 25, 2012
Abate by
Jun 1, 2012
Penalty
Initial $2,400 · Current $0 Reduced
29 CFR 1910.119(f)(3):     The operating procedures shall be reviewed as often as necessary to assure that they reflect current operating practice, including changes that result from changes in process chemicals, technology, and equipment, and changes to facilities.  The employer shall certify annually that these operating procedures are current and accurate.     On or about August 12, 2011, the employer did not certify annually that its operating procedures are current and accurate. Examples include, but are not limited to:    a.	Amine Cylinder Filling Procedure  b.	DMIPA Batch process Instructions  c.	TEA  Batch Process Instructions
Recent events (3)
  • — F (S) $0
  • — C (S) $2400
  • — Z (S) $2400

1910.119 G01 I

Serious Gravity 5 1 instance 1 exposed
Issued
Jan 25, 2012
Abate by
Jul 16, 2012
Penalty
Initial $3,000 · Current $1,500 Reduced
29 CFR 1910.119(g)(1)(i):     Each employee presently involved in operating a process, and each employee before being involved in operating a newly assigned process, shall be trained in an overview of the process and in the operating procedures as specified in paragraph (f) of this section.  The training shall include emphasis on the specific safety and health hazards, emergency operations including shutdown, and safe work practices applicable to the employee's job tasks.    On or about August 12, 2011, the employer had not trained all of its employees involved in operating the repackaging process (isotaner) in an overview of the processes and in all aspects of the operating procedures as specified in 29CFR1910.119(f).
Recent events (3)
  • — F (S) $1500
  • — C (S) $3000
  • — Z (S) $3000

1910.119 J02

Serious Gravity 5 1 instance 1 exposed
Issued
Jan 25, 2012
Abate by
Nov 7, 2012
Penalty
Initial $3,000 · Current $1,500 Reduced
29 CFR 1910.119(j)(2):     Written procedures.  The employer shall establish and implement written procedures to maintain the on-going integrity of process equipment.    On or about August 12, 2011, the employer did not establish and implement written procedures to maintain the on-going integrity of its process equipment in the repackaging process (isotaner).
Recent events (3)
  • — F (S) $1500
  • — C (S) $3000
  • — Z (S) $3000

1910.119 J04 I

Serious Gravity 5 1 instance 1 exposed
Issued
Jan 25, 2012
Abate by
Jun 28, 2013
Penalty
Initial $0 · Current $0
29 CFR 1910.119(j)(4)(i):     Inspections and tests were not performed on process equipment to maintain its mechanical integrity.    On or about August 12, 2011, the employer did not conduct tests and inspections on its process equipment in the packaging process (isotaner) to assure its continued integrity for service. Such equipment included, but was not limited to:    a.	High pressure reactors R-1, R-2 and R-3.  b.	Three 20,000 gallon flammable liquids storage tanks.  c.	High pressure piping systems throughout the facility in flammables and caustic service.  d.	Controls (including monitoring devices and sensors, alarms, and interlocks).  e.	Pumps.  f.	Bonding and grounding connections.
Recent events (3)
  • — F (S) $0
  • — C (S) $0
  • — Z (S) $0

1910.119 O05

Deleted Serious Gravity 5 1 instance 1 exposed
Issued
Jan 25, 2012
Abate by
Mar 8, 2012
Penalty
Initial $3,000 · Current $0 Reduced
29 CFR 1910.119(o)(5):     The employer did not retain the two (2) most recent compliance audit reports.    On or about August 12, 2011, the employer did not retain the two most recent PSM compliance audits of its covered processes.
Recent events (3)
  • — F (S) $0
  • — C (S) $3000
  • — Z (S) $3000

1910.132 D01

Serious Gravity 5 1 instance 1 exposed
Issued
Jan 25, 2012
Abate by
Mar 29, 2012
Penalty
Initial $2,400 · Current $1,200 Reduced
29 CFR 1910.132(d)(1):     The employer did notl assess the workplace to determine if hazards are present, or are likely to be present, which necessitate the use of personal protective equipment (PPE).    On or about August 12, 2011,  the employer did not assess its workplace area where employees transfer highly flammable amines from large containers (Isotaners) into smaller cylinders and drums, with fires as a likely hazard necessitating the use of appropriate personal protective equipment.
Recent events (3)
  • — F (S) $1200
  • — C (S) $2400
  • — Z (S) $2400

1910.132 D01 I

Serious Gravity 5 1 instance 1 exposed
Issued
Jan 25, 2012
Abate by
Jun 1, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.132(d)(1)(i):     The employer did not select, and have each affected employee use, the types of PPE that will protect the affected employee(s) from the hazards identified in the hazard assessment;    On or about August 12, 2011, the employer did not select and have each of its employees using fire resistant clothing when they were working in the amine transfer area to protect against the hazard of fires.
Recent events (3)
  • — F (S) $0
  • — C (S) $0
  • — Z (S) $0

1910.178 B12

Serious Gravity 5 1 exposed
Issued
Jan 25, 2012
Abate by
Jul 16, 2012
Penalty
Initial $3,000 · Current $1,500 Reduced
29 CFR 1910.178(b)(12):     The employer did not classify the atmosphere or location as to whether it is hazardous or nonhazardous prior to the consideration of industrial trucks being used therein and the type of industrial truck required shall be as provided in paragraph (d) of this section for such location.    On or about August 12, 2011, the employer was using a forklift to move containers and drums containing highly flammable amines and had not classified the area as to whether it is hazardous prior to deciding on the type of forklift required.
Recent events (3)
  • — F (S) $1500
  • — C (S) $3000
  • — Z (S) $3000

View Polychem Services, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 331069427.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.