CHICAGO HEIGHTS, IL —
OSHA Inspection: POLYCHEM SERVICES, INC.
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of POLYCHEM SERVICES, INC. in 374 EAST JOE ORR ROAD, CHICAGO HEIGHTS, IL 60411 (NAICS 325199). OSHA activity number 340087592.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- POLYCHEM SERVICES, INC.
- Site address
- 374 EAST JOE ORR ROAD
- City
- CHICAGO HEIGHTS
- State
- IL
- ZIP
- 60411
- Mailing
- 374 EAST JOE ORR ROAD, CHICAGO HEIGHTS, IL 60411
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 325199
- Employees
- 8
- Ownership type
- A
Citations
6 citations on file for this inspection.
1910.119 D03 I D
- Issued
- Apr 29, 2015
- Abate by
- Dec 30, 2015
- Penalty
- Initial $2,200 · Current $2,200
General-duty citation text
29 CFR 1910.119(d)(3)(i)(D): Process safety information pertaining to the equipment in the process did not include the relief system design and design basis. Repackaging area - On or about December 10, 2014, the process safety information pertaining to the equipment (relief valves) in the process (dimethylisopropylamine - DMIPA) did not include the relief system design and design bases. Employee(s) were thereby exposed to the hazards associated with the potential loss of containment and release of dimethylisopropylamine(DMIPA).
Recent events (1)
- — Z (S) $2200
1910.119 D03 II
- Issued
- Apr 29, 2015
- Abate by
- Dec 30, 2015
- Penalty
- Initial $2,200 · Current $2,200
General-duty citation text
29 CFR 1910.119(d)(3)(ii): The employer shall document that equipment complies with recognized and generally accepted good engineering practices. Warehouse and old dock area - On or about December 10, 2014, the employer did not document that equipment such as but not limited to relief devices, piping systems (including piping components such as valves), gaskets, rubber hoses, isocontainers, and pump(s), complied with recognized and generally accepted good engineering practices (RAGAGEP).
Recent events (1)
- — Z (S) $2200
1910.119 E03 V
- Issued
- Apr 29, 2015
- Abate by
- Dec 30, 2015
- Penalty
- Initial $2,200 · Current $2,200
General-duty citation text
29 CFR 1910.119(e)(3)(v): The process hazardous analysis did not address facility siting. Warehouse building/repackaging area - On or about December 10, 2014, employees were required to work in a nearby structure (warehouse building/repackaging area). The employers initial process hazard analysis dated March 26, 2012, and the subsequent process hazard analyses (2013, and 2014) did not address facility siting of occupied structures such as the warehouse building/repackaging area.
Recent events (1)
- — Z (S) $2200
1910.119 J02
- Issued
- Apr 29, 2015
- Abate by
- Dec 30, 2015
- Penalty
- Initial $2,200 · Current $2,200
General-duty citation text
29 CFR 1910.119(j)(2): Written procedures. The employer shall establish and implement written procedures to maintain the on-going integrity of process equipment. Warehouse area (repackaging) and old dock area - On or about January 10, 2015, employee(s) were required to maintain the on-going integrity of process equipment. The employer did not establish and implement written procedures to maintain the on-going mechanical integrity of process equipment such as, but not limited to relief valve(s), isocontainers / tankers, pump(s), and bonding and grounding.
Recent events (1)
- — Z (S) $2200
1910.119 J04 II
- Issued
- Apr 29, 2015
- Abate by
- Dec 30, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.119(j)(4)(ii): Inspection and testing procedures shall follow recognized and generally accepted good engineering practices. Warehouse and old dock area - On or about January 10, 2015, employees were required to maintain the on-going integrity of the process equipment. Inspection and testing procedures performed on process equipment such as, but not limited to piping systems (including piping components such as valves), relief valve(s), pump(s), isocontainer(s) / tanker(s), fill hoses and couplings, grounding and bonding, to maintain its mechanical integrity did not follow recognized and generally accepted good engineering practices (RAGAGEP).
Recent events (1)
- — Z (S) $0
1910.119 O01
- Issued
- Apr 29, 2015
- Abate by
- Dec 30, 2015
- Penalty
- Initial $2,200 · Current $2,200
General-duty citation text
29 CFR 1910.119(o)(1): Employers shall certify that they have evaluated compliance with the provisions of this section at least every three years to verify that the procedures and practices developed under the standard are adequate and are being followed. Warehouse building (repackaging) and old dock area - On or about January 11, 2015, the employer did not certify they had evaluated compliance with the provisions of 29 CFR 1910.119 at least every three years to verify that the procedures and practices developed under this standard were adequate and are being followed.
Recent events (1)
- — Z (S) $2200
More inspections at Polychem Services, INC.
View Polychem Services, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 325199)
More inspections in IL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340087592.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.