Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: QUALITY CUSTOM MOLDING, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of QUALITY CUSTOM MOLDING, LLC in 209 WEST MAIN STREET, LINN, MO 65051 (NAICS 326199). OSHA activity number 331905448.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Quality Custom Molding, LLC — free Get an email when a new federal OSHA severe-injury report for Quality Custom Molding, LLC is published. One employer, no account, unsubscribe in one click.
Site address
209 WEST MAIN STREET
City
LINN
State
MO
ZIP
65051
Mailing
209 WEST MAIN STREET, LINN, MO 65051
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
326199
Employees
20
Ownership type
A

7 citations on file for this inspection.

1910.147 C04 II

Serious Gravity 1 1 instance 7 exposed
Issued
Feb 6, 2012
Abate by
Apr 10, 2012
Penalty
Initial $1,800 · Current $300 Reduced
29 CFR 1910.147(c)(4)(ii):     Procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29 CFR 1910.147(c)(4)(ii)(A), (c)(4)(ii)(B), (c)(4)(ii)(C) and (c)(4)(ii)(D)(h):  a. Where equipment such as, but not limited to, blow molding machines, grinders, trim saws, and other saws, were repaired, maintained, and unjammed, specific procedures did not include details on energy isolating means, how to de-energize, location of the energy isolation device to be used for lockout, and specifically how to test the equipment.  Lockout procedures had not been developed for all equipment, such as for robots.    Abatement certification and abatement documentation is required for this violation.  The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful.  The abatement certification sheet is enclosed with the citation(s).
Recent events (3)
  • — F (S) $300
  • — C (S) $1800
  • — Z (S) $1800

1910.147 C06 II

Serious Gravity 1 7 exposed
Issued
Feb 6, 2012
Abate by
Apr 10, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.147(c)(6)(ii):     The employer did not certify that periodic inspections of the energy control procedures had been performed:  a. Where equipment such as, but not limited to, blow molding machines, grinders, trim saws, and other saws, were repaired, maintained, and unjammed, an annual inspection audit was not certified.    Abatement certification and abatement documentation is required for this violation.  The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful.  The abatement certification sheet is enclosed with the citation(s).
Recent events (3)
  • — F (S) $0
  • — C (S) $0
  • — Z (S) $0

1910.147 C07 I B

Serious Gravity 1 7 exposed
Issued
Feb 6, 2012
Abate by
Apr 10, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.147(c)(7)(i)(B):     Affected employees were not instructed in the purpose and use of the energy control procedure:  a. Where equipment such as, but not limited to, blow molding machines, grinders, trim saws, and other saws, were repaired, maintained, and unjammed, not all "affected" employees, such as operators, were trained on lockout.    Abatement certification and abatement documentation is required for this violation.  The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful.  The abatement certification sheet is enclosed with the citation(s).
Recent events (3)
  • — F (S) $0
  • — C (S) $0
  • — Z (S) $0

1910.147 C07 IV

Serious Gravity 1 7 exposed
Issued
Feb 6, 2012
Abate by
Apr 10, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.147(c)(7)(iv):     The certification of employee training by the employer did not contain each employee name and date of training:  a. Where equipment such as, but not limited to, blow molding machines, grinders, trim saws, and other saws, were repaired, maintained, and unjammed, training certification was not made for all employees, including authorized and affected.    Abatement certification and abatement documentation is required for this violation.  The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful.  The abatement certification sheet is enclosed with the citation(s).
Recent events (3)
  • — F (S) $0
  • — C (S) $0
  • — Z (S) $0

1910.147 C08

Deleted Serious Gravity 5 1 instance 2 exposed
Issued
Feb 6, 2012
Abate by
Apr 10, 2012
Penalty
Initial $3,000 · Current $0 Reduced
29 CFR 1910.147(c)(8):     Lockout or tagout was not performed only by the authorized employees who are performing the servicing or maintenance:  a. Lockout work was performed by employees not authorized to lock out.    Abatement certification and abatement documentation is required for this violation.  The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful.  The abatement certification sheet is enclosed with the citation(s).
Recent events (3)
  • — F (S) $0
  • — C (S) $3000
  • — Z (S) $3000

1910.212 A03 II

Serious Gravity 5 1 instance 2 exposed
Issued
Feb 6, 2012
Abate by
Apr 10, 2012
Penalty
Initial $3,000 · Current $500 Reduced
29 CFR 1910.212(a)(3)(ii):     Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s):  a. Vertical band saws were used with guards not adjusted to the height of the material cut.    Abatement certification and abatement documentation is required for this violation.  The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful.  The abatement certification sheet is enclosed with the citation(s).
Recent events (3)
  • — F (S) $500
  • — C (S) $3000
  • — Z (S) $3000

1910.242 B

Other-than-serious 1 instance 5 exposed
Issued
Feb 6, 2012
Abate by
Apr 10, 2012
Penalty
Initial $1,800 · Current $200 Reduced
29 CFR 1910.242(b):     Compressed air used for cleaning purposes was not reduced to less than 30 p.s.i.:  a. Several instances existed of air nozzles, used for blowing off parts and equipment, with air pressure greater than 30 psi.    Abatement certification and abatement documentation is required for this violation.  The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful.  The abatement certification sheet is enclosed with the citation(s).
Recent events (3)
  • — F (O) $200
  • — C (S) $1800
  • — Z (S) $1800

View Quality Custom Molding, LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 331905448.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.