PIQUA, OH —
OSHA Inspection: HARTZELL FAN, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of HARTZELL FAN, INC. in 910 S. DOWNING ST., PIQUA, OH 45356 (NAICS 333412). OSHA activity number 331916239.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- HARTZELL FAN, INC.
- Site address
- 910 S. DOWNING ST.
- City
- PIQUA
- State
- OH
- ZIP
- 45356
- Mailing
- 910 S. DOWNING ST., PIQUA, OH 45356
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 333412
- Employees
- 160
- Ownership type
- A
Citations
6 citations on file for this inspection.
1910.147 C06 I
- Issued
- Jun 7, 2012
- Abate by
- Jun 28, 2012
- Penalty
- Initial $6,300 · Current $4,000 Reduced
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed: (a) The periodic inspection of the energy control program was not properly conducted, in that it did not include a review of each machine's energy control procedures, was not performed by an authorized employee, and was not conducted with each authorized employee. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (3)
- — F (S) $4000
- — C (S) $6300
- — Z (S) $6300
1910.147 C07 I
- Issued
- Jun 7, 2012
- Abate by
- Jun 28, 2012
- Penalty
- Initial $6,300 · Current $0 Reduced
General-duty citation text
29 CFR 1910.147(c)(7)(i): The employer shall provide training to ensure that the purpose and function of the energy control program are understood by employees and that the knowledge and skills required for the safe application, usage, and removal of the energy controls are acquired by employees: (a) Employee training on the energy control program was inadequate, in that it did not include training for employees on when and how to lock out the Poreba Machine lathe, the LeBlond Machine Lathe, and the LeBlond Regal Machine Lathe prior to doing setups, that included adjusting and replacing the chucks, adjusting and replacing the drills, adjusting the jaws, and wiping down the chuck. (b) Employee training on the energy control program was inadequate, in that it did not include training employees on how and when to lock out the Mazak CNC Mill, prior to climbing into and cleaning the machine at the end of the shift. (c) Employee training on the energy control program was inadequate, in that it did not include training employees on when and how to lock out the Kastos bhs Hacksaw prior to changing the blade. (d) Employee training on the energy control program was inadequate, in that it did not include training employees on when and how to lock out the DoAll Vertical Band Saw prior to changing the blade. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (3)
- — F (S) $0
- — C (S) $6300
- — Z (S) $6300
1910.147 D03
- Issued
- Jun 7, 2012
- Abate by
- Jun 28, 2012
- Penalty
- Initial $6,300 · Current $4,000 Reduced
General-duty citation text
29 CFR 1910.147(d)(3): Machine or equipment isolation. All energy isolating devices that are needed to control the energy to the machine or equipment shall be physically located and operated in such a manner as to isolate the machine or equipment from the energy source(s): (a) Employees set up the LeBlond Machine Lathe and the LeBlond Regal Machine Lathe, including adjusting and replacing the chucks, adjusting and replacing the drills, adjusting the jaws, and wiping down the chuck, without first isolating the electrical energy source. (b) Employees climbed inside and cleaned the Mazak CNC Mill at the end of the shift, without first isolating the electrical, pneumatic and hydraulic energy sources. (c) Employees changed the blade on the Kastos bhs Hacksaw without first isolating the electrical energy source. (d) Employees changed the blade on the DoAll Vertical Band Saw without first isolating the electrical energy source. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (3)
- — F (S) $4000
- — C (S) $6300
- — Z (S) $6300
1910.147 D04 I
- Issued
- Jun 7, 2012
- Abate by
- Jun 28, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(d)(4)(i): Lockout or tagout devices shall be affixed to each energy isolating device by authorized employees: (a) Employees set up the Poreba Machine lathe, the LeBlond Machine Lathe, and the LeBlond Regal Machine Lathe, including adjusting and replacing the chucks, adjusting and replacing the drills, adjusting the jaws, and wiping down the chuck, without first affixing a lockout device to the electrical energy isolating device. (b) Employees climbed inside and cleaned the Mazak CNC Mill at the end of the shift, without first affixing a lockout device to the electrical, pneumatic and hydraulic energy isolating devices. (c) Employees changed the blade on the Kastos bhs Hacksaw without first affixing a lockout device to the electrical energy isolating device. (d) Employees changed the blade on the DoAll Vertical Band Saw without first affixing a lockout device to the electrical energy isolating device. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1910.147 C05 I
- Issued
- Jun 7, 2012
- Abate by
- Jun 28, 2012
- Penalty
- Initial $6,300 · Current $0 Reduced
General-duty citation text
29 CFR 1910.147(c)(5)(i): Locks, tags, chains, wedges, key blocks, adapter pins, self-locking fasteners, or other hardware shall be provided by the employer for isolating, securing or blocking of machines or equipment from energy sources: (a) Employees were not provided with locks or tags to attach to the electrical energy isolating device, prior to setting up the Poreba Machine lathe, the LeBlond Machine Lathe, and the LeBlond Regal Machine Lathe, including adjusting and replacing the chucks, adjusting and replacing the drills, adjusting the jaws, and wiping down the chuck during setups. (b) Employees were not provided with lock or tags to attach to the electrical and pneumatic energy isolating devices prior to climbing inside and cleaning the Mazak CNC Mill at the end of the shift. (c) Employees were not provided with locks or tags to attach to the electrical energy isolating device prior to changing the blade on the Kastos bhs Hacksaw. (d) Employees were not provided with locks or tags to attach to the electrical energy isolating device prior to changing the blade on the DoAll Vertical Band Saw. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (3)
- — F (S) $0
- — C (S) $6300
- — Z (S) $6300
1910.212 A01
- Issued
- Jun 7, 2012
- Abate by
- Jun 28, 2012
- Penalty
- Initial $6,300 · Current $4,000 Reduced
General-duty citation text
29 CFR 1910.212(a)(1): Types of guarding. One or more methods of machine guarding shall be provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks. Examples of guarding methods are-barrier guards, two-hand tripping devices,electronic safety devices, etc.: (a) Employees operating the LeBlond Machine Lathe and the LeBlond Regal Machine Lathe, were exposed to the unguarded chucks. (b) Employees operating the Famous Line Vertical Band Saw were exposed to 4-1/4 inches of unguarded blade. (c) Employees operating the Tannewitz Vertical Band Saw were exposed to 3-1/4 inches of unguarded blade. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (3)
- — F (S) $4000
- — C (S) $6300
- — Z (S) $6300
More inspections at Hartzell FAN, INC.
View Hartzell FAN, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 333412)
More inspections in OH
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 331916239.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.