OSHA Inspection: YENKIN-MAJESTIC PAINT CORPORATION

Referral inspection · Health discipline

On , OSHA opened a referral health inspection of YENKIN-MAJESTIC PAINT CORPORATION in 1920 LEONARD AVENUE, COLUMBUS, OH 43219 (NAICS 325211). OSHA activity number 332822287.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Yenkin-Majestic Paint Corporation — free Get an email when a new federal OSHA severe-injury report for Yenkin-Majestic Paint Corporation is published. One employer, no account, unsubscribe in one click.
Site address
1920 LEONARD AVENUE
City
COLUMBUS
State
OH
ZIP
43219
Mailing
1920 LEONARD AVENUE, COLUMBUS, OH 43219
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
325211
Employees
65
Ownership type
A

26 citations on file for this inspection.

1910.119 D02 I C

Other-than-serious 6 instances 65 exposed
Issued
Sep 14, 2012
Abate by
Sep 4, 2014
Penalty
Initial $6,930 · Current $1,500 Reduced
29 CFR 1910.119(d)(2)(i)(C):  Information concerning the technology of the process shall include at least the following:  Maximum intended inventory:    a.  The employer's process safety information (PSI) did not include the maximum intended inventory for the K3 kettle unit/system.    b.  The employer's process safety information (PSI) did not include the maximum intended inventory for the K4 kettle unit/system.    c.  The employer's process safety information (PSI) did not include the maximum intended inventory for the K5 kettle unit/system.    d.  The employer's process safety information (PSI) did not include the maximum intended inventory for the K6 kettle unit/system.    e.  The employer's process safety information (PSI) did not include the maximum intended inventory for the K7 kettle unit/system.    f.   The employer's process safety information (PSI) did not include the maximum intended inventory for the K8 kettle unit/system.
Recent events (3)
  • — F (O) $1500
  • — C (S) $6930
  • — Z (S) $6930

1910.119 D03 I A

Deleted Serious Gravity 10 1 instance 65 exposed
Issued
Sep 14, 2012
Abate by
Oct 14, 2012
Penalty
Initial $6,930 · Current $0 Reduced
29 CFR 1910.119(d)(3)(i)(A):  Information pertaining to the equipment in the process shall include:  Materials of construction:    a.  The employer's process safety information (PSI) did not include the materials of construction for the open top catch tank for the K5, K6, and K7 kettles.
Recent events (3)
  • — F (S) $0
  • — C (S) $6930
  • — Z (S) $6930

1910.119 D03 I F

Deleted Serious Gravity 10 1 instance 65 exposed
Issued
Sep 14, 2012
Abate by
Oct 14, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.119(d)(3)(i)(F):  Information pertaining to the equipment in the process shall include:  Design codes and standards employed:    a.  The employer's process safety information (PSI) did not include the design codes and standards employed for the open top catch tank for the K5, K6, and K7 kettles.
Recent events (3)
  • — F (S) $0
  • — C (S) $0
  • — Z (S) $0

1910.119 D03 I B

Serious Gravity 10 22 instances 65 exposed
Issued
Sep 14, 2012
Abate by
Sep 4, 2014
Penalty
Initial $6,930 · Current $7,000
29 CFR 1910.119(d)(3)(i)(B):  Information pertaining to the equipment in the process shall include:  Piping and instrument diagrams (P&ID's):    a.  The employer did not have a piping and instrument diagram (P&ID) for the cooling water supply and return system which was connected to the K7 kettle unit/system.    b.  The employer did not have a P&ID for the press filtration process which included the East, West, and North press piping manifold which was connected to the K7 kettle unit/system.    f.  The P&ID (Drawing No. 5194-D-25) Flow Sheet For K-7 Reactor System dated on or about April 27, 1998, was not accurate in that a cooling water return pot which was added on or about December 29, 1998, was not identified.    g.  The P&ID (Drawing No. 5194-D-25) Flow Sheet For K-7 Reactor System dated on or about April 27, 1998, was not accurate in that a temperature indicator which was identified on the monomer feed weigh tank WT-7A was never installed.    h.  The P&ID (Drawing No. 5194-D-25) Flow Sheet For K-7 Reactor System dated on or about April 27, 1998, was not accurate in that a high level alarm indicator and alarm on the monomer feed weigh tank WT-7A was not identified.    i.  The P&ID (Drawing No. 5194-D-25) Flow Sheet For K-7 Reactor System dated on or about April 27, 1998, was not accurate in that an isolation valve on the monomer line between the monomer feed weigh tank WT-7A and monomer pump PU-7A was not identified.    j.  The P&ID (Drawing No. 5194-D-25) Flow Sheet For K-7 Reactor System dated on or about April 27, 1998, was not accurate in that two isolation valves on the monomer line between the monomer pump PU-7A and check valve prior to the static mixer SM-7 were not identified.    k.  The P&ID (Drawing No. 5194-D-25) Flow Sheet For K-7 Reactor System dated on or about April 27, 1998, was not accurate in that an additional isolation valve which did not exist was identified on the catalyst line between the catalyst tank WT-7B and catalyst pump PU-7B.    l.  The P&ID (Drawing No. 5194-D-25) Flow Sheet For K-7 Reactor System dated on or about April 27, 1998, was not accurate in that two isolation valves on the monomer line between the static mixer SM-7 and K-7 reactor were not identified.    m.  The P&ID (Drawing No. 5194-D-25) Flow Sheet For K-7 Reactor System dated on or about April 27, 1998, was not accurate in that an additional isolation valve which did not exist was identified on the catalyst gravity feed line on top of the K-7 reactor.    n.  The P&ID (Drawing No. 5194-D-25) Flow Sheet For K-7 Reactor System dated on or about April 27, 1998, was not accurate in that the 1 inch catalyst gravity feed line was identified with the incorrect pipe size of 1 1/2 inches.    o.  The P&ID (Drawing No. 5194-D-25) Flow Sheet For K-7 Reactor System dated on or about April 27, 1998, was not accurate in that the 1 inch catalyst line between the bottom of the catalyst tank WT-7B and reducer was identified with the incorrect pipe size of 1 1/2 inches.    p.  The P&ID (Drawing No. 5194-D-25) Flow Sheet For K-7 Reactor System dated on or about April 27, 1998, was not accurate in that  the 1 1/2 inch monomer line between the bottom of the monomer feed weigh tank WT-7A and the reducer was identified with the incorrect pipe size of 2 inches.    q.  The P&ID (Drawing No. 5194-D-25) Flow Sheet For K-7 Reactor System dated on or about April 27, 1998, was not accurate in that an isolation valve and solvent line which were installed on the 1 inch monomer line above the K-7 reactor in or about 1998 were not identified.    r.  The P&ID (Drawing No. 5194-D-25) Flow Sheet For K-7 Reactor System dated on or about April 27, 1998, was not accurate in that the catalyst pump PU-7B pressure vent line and ball valve which vented back to the catalyst tank WT-7B and installed on or about August 10, 1999, were not identified.    s.  The P&ID (Drawing No. 5194-D-25) Flow Sheet For K-7 Reactor System dated on or about April 27, 1998, was not accurate in that the monomer sparge rings for the K-7 reactor which were removed on or about October 11, 1998, were still identified.    t.  The P&ID (Drawing No. 5194-D-25) Flow Sheet For K-7 Reactor System dated on or about April 27, 1998, was not accurate in that the outer coil for steam and the inner coil for cooling in the K-7 reactor which were modified and reversed on or about September/October 2000 were not identified as being changed.    u.  The P&ID (Drawing No. 5194-D-25) Flow Sheet For K-7 Reactor System dated on or about April 27, 1998, was not accurate in that the scale tank ST-10 was identified as WT-7C.    v.  The P&ID (Drawing No. 5194-D-25) Flow Sheet For K-7 Reactor System dated on or about April 27, 1998, was not accurate in that numerous ball valves were identified as gate/globe valves.
Recent events (3)
  • — F (S) $7000
  • — C (S) $6930
  • — Z (S) $6930

1910.119 D03 I D

Serious Gravity 10 1 instance 65 exposed
Issued
Sep 14, 2012
Abate by
Sep 4, 2014
Penalty
Initial $6,930 · Current $0 Reduced
29 CFR 1910.119(d)(3)(i)(D):  Information pertaining to the equipment in the process shall include:  Relief system design and design basis:    a.  The employer's process safety information (PSI) did not include the relief system design and design basis for the K7 kettle emergency relief and effluent handling system.
Recent events (3)
  • — F (S) $0
  • — C (S) $6930
  • — Z (S) $6930

1910.119 D03 II

Serious Gravity 10 5 instances 65 exposed
Issued
Sep 14, 2012
Abate by
Sep 4, 2014
Penalty
Initial $6,930 · Current $0 Reduced
29 CFR 1910.119(d)(3)(ii):  The employer shall document that equipment complies with recognized and generally accepted good engineering practices:    b.  The employer's PSI did not document that the K8 ventilation including two direct drive roof exhaust fans complied with RAGAGEP by ensuring that the exhaust fans were rated for a hazardous classified location.    c.  The employer did not document that the K7 kettle complied with RAGAGEP by maintaining a Form U-1 Manufacturer' Data Report for Unfired Pressure Vessels.    d.  The employer did not document that the K7 kettle complied with RAGAGEP by ensuring that a nameplate was on the vessel or by maintaining the vessel decommissioning information.    e.  The employer did not document that the K7 kettle complied with RAGAGEP by maintaining Report of Repairs or Alterations when the inner cooling coils were moved up towards the top of the vessel, two 2 inch nozzles on the top head were changed to 3 inch nozzles, three new 3 inch bottom connections were added, and both sparge rings were removed.
Recent events (3)
  • — F (S) $0
  • — C (S) $6930
  • — Z (S) $6930

1910.119 E03 I

Serious Gravity 10 4 instances 65 exposed
Issued
Sep 14, 2012
Abate by
Sep 4, 2014
Penalty
Initial $6,930 · Current $7,000
29 CFR 1910.119(e)(3)(i):  The process hazard analysis shall address:  The hazards of the process:    b.  The employer's PHA-K7 and K6 Replacement did not address the hazards associated with organic peroxide catalysts and their incompatibility with bronze valves/piping components and heat from the K7 steam condensate system and piping during the transfer from the catalyst tank WT-7B into the K7 kettle.    c.  The employer's PHA-K7 and K6 Replacement did not adequately address the hazards associated with venting the pressure safety relief valve on the discharge side of the catalyst pump PU-7B back to the inlet side of the pump in lieu of venting it into the catalyst tank WT-7B.    d.   The employer's PHA-K7 and K6 Replacement did not adequately address the hazards associated with venting the pressure safety relief valve on the discharge side of the monomer pump PU-7A back to the inlet side of the pump in lieu of venting it into the monomer feed weigh tank WT-7A.
Recent events (3)
  • — F (S) $7000
  • — C (S) $6930
  • — Z (S) $6930

1910.119 E03 IV

Serious Gravity 10 2 instances 65 exposed
Issued
Sep 14, 2012
Abate by
Sep 4, 2014
Penalty
Initial $6,930 · Current $0 Reduced
29 CFR 1910.119(e)(3)(iv):  The process hazard analysis shall address:  Consequences of failure of engineering and administrative controls:    a.  The employer's PHA-K7 and K6 Replacement did not address consequences of failure of engineering and administrative controls involving alarms, interlocks, and shutdowns, including, but not limited to, the following:  failure of high temperature alarms, high pressure alarm, low/high agitation speed control and alarm, monomer tank high level alarm, secondary condenser vent temperature control, and emergency stop/shutdown buttons.    b.  The employer's PHA-K7 and K6 Replacement did not address consequences of failure of engineering and administrative controls including lack of ventilation in the resin building due to failure or not being turned on during operations.
Recent events (3)
  • — F (S) $0
  • — C (S) $6930
  • — Z (S) $6930

1910.119 E03 V

Serious Gravity 10 1 instance 65 exposed
Issued
Sep 14, 2012
Abate by
Sep 4, 2014
Penalty
Initial $6,930 · Current $0 Reduced
29 CFR 1910.119(e)(3)(v):  The process hazard analysis shall address:  Facility siting:    a.  The employer's PHA-K7 and K6 Replacement did not address facility siting for the K7 kettle unit/system such as, but not limited to, the following:  vehicle operations including powered industrial trucks inside and around the resin plant which subjected the process equipment and associated piping to vehicular impact; and construction design and location of occupied structures in the resin plant such as the K6/K7 control room.
Recent events (3)
  • — F (S) $0
  • — C (S) $6930
  • — Z (S) $6930

1910.119 E03 VI

Serious Gravity 10 1 instance 65 exposed
Issued
Sep 14, 2012
Abate by
Sep 4, 2014
Penalty
Initial $6,930 · Current $0 Reduced
29 CFR 1910.119(e)(3)(vi):  The process hazard analysis shall address:  Human factors:    a.  The employer's PHA-K7 and K6 Replacement did not address human factors for the K7 kettle unit/system such as, but not limited to, the following:  communications during shift turnover and during operations; lack of operator response to critical alarms; fatigued operators when covering two shifts; and operator overload during normal operations, emergency operations, and emergency shutdown.
Recent events (3)
  • — F (S) $0
  • — C (S) $6930
  • — Z (S) $6930

1910.119 E06

Serious Gravity 10 1 instance 65 exposed
Issued
Sep 14, 2012
Abate by
Sep 4, 2014
Penalty
Initial $6,930 · Current $7,000
29 CFR 1910.119(e)(6):  At least every five (5) years after the completion of the initial process hazard analysis, the process hazard analysis shall be updated and revalidated by a team meeting the requirements in paragraph (e)(4) of this section, to assure that the process hazard analysis is consistent with the current process:    a.  In the resin plant, the employer did not update and revalidate the initial PHA-K7 and K6 Replacement, dated on or about January 8, 1999, at least every five years.
Recent events (3)
  • — F (S) $7000
  • — C (S) $6930
  • — Z (S) $6930

1910.119 F01

Serious Gravity 10 2 instances 65 exposed
Issued
Sep 14, 2012
Abate by
Sep 4, 2014
Penalty
Initial $6,930 · Current $7,000
29 CFR 1910.119(f)(1):  The employer shall develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and shall address at least the following elements:    a.  In the resin plant, the K7-Kettle Operation, Procedure No. RP-K7050 was not effectively implemented in that the actual practice of adding catalyst hits through the catalyst pump did not reflect the written operating procedure of adding catalyst hits through the gravity feed line to the K7 kettle.    b.  In the resin plant, the Kettle Specific Procedure-7689-V-60 was not effectively implemented in that the actual practice of increasing the process temperature above 275 degrees F did not reflect the written operating procedure.
Recent events (3)
  • — F (S) $7000
  • — C (S) $6930
  • — Z (S) $6930

1910.119 F03

Other-than-serious 3 instances 65 exposed
Issued
Sep 14, 2012
Abate by
Sep 4, 2014
Penalty
Initial $6,930 · Current $1,500 Reduced
29 CFR 1910.119(f)(3):  The operating procedures shall be reviewed as often as necessary to assure that they reflect current operating practice, including changes that result from changes in process chemicals, technology, and equipment, and changes to facilities.  The employer shall certify annually that these operating procedures are current and accurate:    a.  The employer did not certify annually that the following operating procedures related to the K7 kettle system/unit were current and accurate:  Kettle Operators' Training Manual; K6 & K7 Computer Operation Flow Chart, Procedure No. RP-K7002; K7-Kettle Operation, Procedure No. RP-K7050; K7-Emergency Shutdown/Manual Operation, Procedure No. RP-K7051; K6 & K7 Computer Startup/Shutdown, Procedure No. RP-K7052; K6 and K7-Base Charging Operation, Procedure No. RP-K7502; Base Heat Exchanger, Procedure No. RP-K7503; K6 & K7-Monomer Charging Operation, Procedure No. RP-K7504; K6 & K7-Catalyst Charging Operation, Procedure No. RP-K7505; K6 & K7-Supervisor Screen Operation, Procedure No. RP-K7508; and K6 & K7 Control Panel Description, Procedure No. RP-K7510.    b.  The employer did not review the K7-Kettle Operation, Procedure No. RP-K7050 as often as necessary to assure that the operating procedure of adding catalyst hits through the gravity feed line to the K7 kettle reflected current operating practice of adding catalyst hits through the catalyst pump.    c.  The employer did not review the Kettle Specific Procedure-7689-V-60 as often as necessary to assure that the operating procedure of increasing the process temperature to 275 degrees F reflected the current operating practice of increasing the process temperature above 275 degrees F.
Recent events (3)
  • — F (O) $1500
  • — C (S) $6930
  • — Z (S) $6930

1910.119 G02

Other-than-serious 1 instance 9 exposed
Issued
Sep 14, 2012
Abate by
Sep 4, 2014
Penalty
Initial $6,930 · Current $1,500 Reduced
29 CFR 1910.119(g)(2):  Refresher training.  Refresher training shall be provided at least every three years, and more often if necessary, to each employee involved in operating a process to assure that the employee understands and adheres to the current operating procedures of the process.  The employer, in consultation with the employees involved in operating the process, shall determine the appropriate frequency of refresher training:    a.  In the resin plant, the employer did not provide refresher training at least every three years for nine of its employees who operated the K3, K4, K5, K6, K7, and K8 kettle systems/units.
Recent events (3)
  • — F (O) $1500
  • — C (S) $6930
  • — Z (S) $6930

1910.119 G03

Other-than-serious 1 instance 9 exposed
Issued
Sep 14, 2012
Abate by
Sep 4, 2014
Penalty
Initial $0 · Current $0
29 CFR 1910.119(g)(3):  Training documentation.  The employer shall ascertain that each employee involved in operating a process has received and understood the training required by this paragraph.  The employer shall prepare a record which contains the identity of the employee, the date of training, and the means used to verify that the employee understood the training:    a.  In the resin plant, the employer did not prepare a training record for the initial training of at least nine of its employees who operated the K3, K4, K5, K6, K7, and K8 kettle systems/units.
Recent events (3)
  • — F (O) $0
  • — C (S) $0
  • — Z (S) $0

1910.119 J02

Serious Gravity 10 7 instances 65 exposed
Issued
Sep 14, 2012
Abate by
Dec 31, 2015
Penalty
Initial $6,930 · Current $7,000
29 CFR 1910.119(j)(2):  Written procedures. The employer shall establish and implement written procedures to maintain the on-going integrity of process equipment:    a.  At the resin plant, the employer did not establish and implement written procedures to maintain the on-going integrity of pressure vessels and storage tanks.    b.  At the resin plant, the employer did not establish and implement written procedures to maintain the on-going integrity of piping systems including piping components such as valves.    c. At the resin plant, the employer did not establish and implement written procedures to maintain the on-going integrity of relief and vent systems and devices.    d.  At the resin plant, the employer did not establish and implement written procedures to maintain the on-going integrity of emergency shutdown systems.    e.  At the resin plant, the employer did not establish and implement written procedures to maintain the on-going integrity of controls including monitoring devices and sensors, alarms, and interlocks.    f.  At the resin plant, the employer did not establish and implement written procedures to maintain the on-going integrity of pumps.     g.  At the resin plant, the employer did not establish and implement written quality assurance procedures to assure that equipment, maintenance materials, and spare parts were suitable for the process application for which they would be used.
Recent events (3)
  • — F (S) $7000
  • — C (S) $6930
  • — Z (S) $6930

1910.119 J03

Serious Gravity 10 2 instances 65 exposed
Issued
Sep 14, 2012
Abate by
Dec 31, 2015
Penalty
Initial $6,930 · Current $7,000
29 CFR 1910.119(j)(3):  Training for process maintenance activities.  The employer shall train each employee involved in maintaining the on-going integrity of process equipment in an overview of that process and its hazards and in the procedures applicable to the employee's job tasks to assure that the employee can perform the job tasks in a safe manner:    a.  At the resin plant, the employer did not train a process engineer, involved in maintaining the on-going integrity of the process vessels through nondestructive examination (NDE) which included ultrasonic testing (UT) and dye-penetrant examination of kettle 5, scale tanks, and storage tanks, in the procedures applicable to the employee's job tasks.    b.  At the resin plant, the employer did not train maintenance employees, involved in maintaining the on-going integrity of the process through inspections and testing of equipment which included kettles, agitators, piping bridges, high level alarms, pumps, motors, rupture disks, storage tanks, scale tanks, and other tanks, in the procedures applicable to the employee's job tasks.
Recent events (3)
  • — F (S) $7000
  • — C (S) $6930
  • — Z (S) $6930

1910.119 J04 I

Serious Gravity 10 3 instances 65 exposed
Issued
Sep 14, 2012
Abate by
Dec 31, 2015
Penalty
Initial $6,930 · Current $7,000
29 CFR 1910.119(j)(4)(i):  Inspections and tests shall be performed on process equipment:    a.  In the resin plant, the employer did not ensure that inspections and tests were being performed on the piping components such as ball valves, solenoid valves, and pressure safety valves for the K7 kettle unit/system.    b.  In the resin plant, the employer did not ensure that inspections and tests were being performed on controls such as the high level alarm for the K7 monomer weigh tank WT-7A, the RPM sensor for the agitator shaft on the K7 kettle, reaction temperature control on the K7 kettle, and temperature control in the secondary condenser vent.    c.  In the resin plant, the employer did not ensure that inspections and tests were being performed on emergency shutdown systems such as those for the K6, K7, and K8 kettles.
Recent events (3)
  • — F (S) $7000
  • — C (S) $6930
  • — Z (S) $6930

1910.119 J04 II

Serious Gravity 10 3 instances 65 exposed
Issued
Sep 14, 2012
Abate by
Dec 31, 2015
Penalty
Initial $0 · Current $0
29 CFR 1910.119(j)(4)(ii):  Inspection and testing procedures shall follow recognized and generally accepted good engineering practices:    a.  In the resin plant, the employer did not follow recognized and generally accepted good engineering practices (RAGAGEP) when they did not conduct thorough vessel inspections for vessels such as the K7 kettle by failing to perform internal inspections and external inspections including thickness measurements.    b.  In the resin plant, the employer did not follow RAGAGEP when they did not conduct thorough piping inspections for the K7 unit/system by failing to perform external inspections including thickness measurements and valve inspections.    c.  In the resin plant, the employer did not follow RAGAGEP when they did not conduct thorough pump inspections for the K7 unit/system by failing to perform detailed inspections including vibration analysis.
Recent events (3)
  • — F (S) $0
  • — C (S) $0
  • — Z (S) $0

1910.119 J04 IV

Serious Gravity 10 2 instances 65 exposed
Issued
Sep 14, 2012
Abate by
Dec 31, 2015
Penalty
Initial $0 · Current $0
29 CFR 1910.119(j)(4)(iv):  The employer shall document each inspection and test that has been performed on process equipment. The documentation shall identify the date of the inspection or test, the name of the person who performed the inspection or test, the serial number or other identifier of the equipment on which the inspection or test was performed, a description of the inspection or test performed, and the results of the inspection or test:    a.  In the resin plant, the employer did not document inspections performed on relief devices such as the rupture disk, and effluent piping for the K7 kettle.    b.  In the resin plant, the employer did not document inspections performed on pipe bridges such as the pipe bridge containing process chemical piping behind the K6 kettle.
Recent events (3)
  • — F (S) $0
  • — C (S) $0
  • — Z (S) $0

1910.119 J06 I

Serious Gravity 10 1 instance 65 exposed
Issued
Sep 14, 2012
Abate by
Sep 4, 2014
Penalty
Initial $6,930 · Current $7,000
29 CFR 1910.119(j)(6)(i):  In the construction of new plants and equipment, the employer shall assure that equipment as it is fabricated is suitable for the process application for which they will be used:    a.  The employer did not assure that the use of bronze valves/piping components were suitable for the process of transferring organic peroxide catalysts from the catalyst tank WT-7B into the K7 kettle.
Recent events (3)
  • — F (S) $7000
  • — C (S) $6930
  • — Z (S) $6930

1910.119 J06 II

Serious Gravity 5 1 instance 65 exposed
Issued
Sep 14, 2012
Abate by
Sep 4, 2014
Penalty
Initial $0 · Current $0
29 CFR 1910.119(j)(6)(ii):  Appropriate checks and inspections shall be performed to assure that equipment is installed properly and consistent with design specifications and the manufacturer's instructions:    a.  The employer did not assure that the proximity of the K7 steam condensate system and piping to the catalyst and monomer lines were suitable for the process of transferring organic peroxide catalysts from the catalyst tank WT-7B into the K7 kettle.
Recent events (3)
  • — F (S) $0
  • — C (S) $0
  • — Z (S) $0

1910.119 L01

Serious Gravity 10 17 instances 65 exposed
Issued
Sep 14, 2012
Abate by
Sep 4, 2014
Penalty
Initial $6,930 · Current $7,000
29 CFR 1910.119(l)(1):  The employer shall establish and implement written procedures to manage changes (except for "replacements in kind") to process chemicals, technology, equipment, and procedures; and, changes to facilities that affect a covered process:    a.  A management of change was not implemented and documented for a change involving the periodic increase of the batch temperature above 275 degrees F on the K7 kettle which was not specified in the Kettle Specific Procedure (KSP) 7689-V-60.    b.  A management of change was not implemented and documented for a change involving the addition of catalyst hits to the K7 kettle through the pump in lieu of the gravity feed line which was not specified in the K7-Kettle Operation, Procedure No. RP-K7050.    c.  A management of change was not implemented and documented for the removal of the monomer sparge rings in the K7 kettle on or about October 11, 1998.    d.  A management of change was not implemented and documented for reconnecting and placing back into service the monomer tank high level alarms for K6 and K7 kettles after they were disconnected per MOC #509 on or about December 29, 2009.    e.  A management of change was not implemented and documented to verify that all considerations were addressed for MOC #9 involving the PLC computer system changes for K6 and K7 which changed the flow rate of the K6 monomer pump and changed the monomer addition on K7.     f.  A management of change was not implemented and documented to verify that all considerations were addressed for MOC #19 involving the installation of catalyst pump pressure relief that vents back to the K7 catalyst tank.    g.  A management of change was not implemented and documented to verify that all considerations were addressed for MOC #45 involving the installation of the cooling water return pot for the K7 kettle.    h.  A management of change was not implemented and documented to verify that all considerations were addressed for MOC #75 involving the modification to the heating and cooling coils in the K7 kettle.    i.  A management of change was not implemented and documented to verify that all considerations were addressed for MOC #445 involving the replacement of both the motor and variable frequency drive for the K7 catalyst pump.    j.  A management of change was not implemented and documented to verify that all considerations were addressed for MOC #509 involving temporarily disconnecting the K6 and K7 monomer tank high level alarms.    k.  A management of change was not implemented and documented to verify that all considerations were addressed for MOC #620 involving a new KSP 6671-VX-50 for K3, K4, and K5 kettles and a modified KSP 7689-V-60 which changed the base and increased the process temperature for K3, K6, and K7 kettles.    l.  A management of change was not implemented and documented to verify that all considerations were addressed for MOC #736 involving the modification of the standard operating procedure for K6 and K7.    m.  A management of change was not implemented and documented to verify that all considerations were addressed for MOC #774 involving the modification of KSP 7292-V-75 which changed the process viscosity for K3, K4, K5, and K8 kettles and KSP 7689-V-60 which changed the process viscosity, booster instructions, and solvent amounts.    n.   A management of change was not implemented and documented to verify that all considerations were addressed for MOC #790 involving the modification of KSP 7689-V-60 which changed the criteria for adding the booster and increased the process temperature to 275 degrees F.    o.  A management of change was not implemented and documented to verify that all considerations were addressed for MOC #792 involving the changes to the K7 kettle catalyst and monomer feed lines.    p.  A management of change was not implemented and documented to verify that all considerations were addressed for MOC #798 involving the relocation of the K7 catalyst gravity feed line.    q.  A management of change was not implemented and documented to verify that all considerations were addressed for MOC #803 involving the installation of a new solvent line for the spray heads of K7 kettle.
Recent events (3)
  • — F (S) $7000
  • — C (S) $6930
  • — Z (S) $6930

1910.119 O01

Serious Gravity 10 1 instance 65 exposed
Issued
Sep 14, 2012
Abate by
Sep 4, 2014
Penalty
Initial $6,930 · Current $7,000
29 CFR 1910.119(o)(1):  Employers shall certify that they have evaluated compliance with the provisions of this section at least every three years to verify that the procedures and practices developed under the standard are adequate and are being followed:    a.  At the workplace, the employer did not conduct a compliance audit every three years for its PSM covered processes.
Recent events (3)
  • — F (S) $7000
  • — C (S) $6930
  • — Z (S) $6930

1910.119 O04

Other-than-serious 1 instance 65 exposed
Issued
Sep 14, 2012
Abate by
Sep 4, 2014
Penalty
Initial $6,930 · Current $1,500 Reduced
29 CFR 1910.119(o)(4):  The employer shall promptly determine and document an appropriate response to each of the findings of the compliance audit, and document that deficiencies have been corrected:    a.  At the workplace, the employer's compliance audit dated on or about May 25, 1995, did not establish and document that the deficiencies had been corrected.
Recent events (3)
  • — F (O) $1500
  • — C (S) $6930
  • — Z (S) $6930

1910.132 D02

Other-than-serious 1 instance 65 exposed
Issued
Sep 14, 2012
Penalty
Initial $0 · Current $203
29 CFR 1910.132(d)(2):  'The employer shall verify that the required workplace hazard assessment has been performed through a written certification that identifies the workplace evaluated; the person certifying that the evaluation has been performed; the date(s) of the hazard assessment; and, which identifies the document as a certification of hazard assessment:    a.  At the workplace, the employer did not certifiy that the personal protective equipment hazard assessment for maintenance employees had been performed through a written certification.
Recent events (3)
  • — F (O) $203
  • — C (O) $0
  • — Z (O) $0

View Yenkin-Majestic Paint Corporation's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 332822287.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.