Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: PENN MANUFACTURING INDUSTRIES, INC.

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of PENN MANUFACTURING INDUSTRIES, INC. in 506 STUMP ROAD, MONTGOMERYVILLE, PA 18936 (NAICS 332710). OSHA activity number 333292761.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Penn Manufacturing Industries, INC. — free Get an email when a new federal OSHA severe-injury report for Penn Manufacturing Industries, INC. is published. One employer, no account, unsubscribe in one click.
Site address
506 STUMP ROAD
City
MONTGOMERYVILLE
State
PA
ZIP
18936
Mailing
506 STUMP RD., MONTGOMERYVILLE, PA 18936
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332710
Employees
80
Ownership type
A

4 citations on file for this inspection.

1910.125 A

Serious Gravity 5 1 instance 3 exposed
Issued
May 21, 2012
Abate by
Jun 5, 2012
Penalty
Initial $3,060 · Current $2,142 Reduced
29 CFR 1910.125(a):     Dip tank were not made of noncombustible material:    a. Tumbling/Abrasive Blasting Area - On or about 4/10/12,  containers are being used by employees as dip tanks to clean parts with a flammable liquid (acetone), as well as to store the acetone overnight. These containers did not meet the requirements of an approved container for storage of flammable liquids.    Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $2142
  • — Z (S) $3060

1910.125 E02

Serious Gravity 5 1 instance 3 exposed
Issued
May 21, 2012
Abate by
Jun 5, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.125(e)(2):     Portable container(s) used to add liquid to the tank were not electrically bonded to the dip tank and positively grounded to prevent static electrical sparks or arcs:    a. Tumbling/Abrasive Blasting Area - On or about 4/10/12, Employees filling a Buckhorn Plastic container, used for degreasing, with a one gallon metal container of Sherwin Williams Acetone and did not bond or ground the container to eliminate the potential for static sparks.     Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.151 C

Serious Gravity 5 1 instance 1 exposed
Issued
May 21, 2012
Abate by
Jun 20, 2012
Penalty
Initial $3,060 · Current $2,142 Reduced

Hazardous substances 2310

29 CFR 1910.151(c):     Where employees were exposed to injurious corrosive materials, suitable facilities for quick drenching or flushing of the eyes and body were not provided within the work area for immediate emergency use:    a. Manufacturing Area - On or about 3/28/12,  The employer did not provide the employee with an eye wash which provided water for both eyes and the ability to flush skin for 15 minutes, in the immediate area where the GNB battery for the Toyota fork lift was checked or filled with electrolyte or water.    Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement
Recent events (2)
  • — I (S) $2142
  • — Z (S) $3060

1910.1200 F05 II

Other-than-serious 1 instance 3 exposed
Issued
May 21, 2012
Abate by
May 26, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(f)(5)(ii):     The employer did not ensure that each container of hazardous chemicals in the workplace was labeled, tagged or marked with the appropriate hazard warnings:    a. Tumbling/Abrasive Blasting Area - On or about 4/10/12, A Buckhorn attached lid container was being used by employees as a dip tank with Sherwin Williams R6K9 acetone was not labeled with the hazard warning.     Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View Penn Manufacturing Industries, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 333292761.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.