OSHA Inspection: SJL WELL SERVICE, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of SJL WELL SERVICE, LLC in CHRISTENSEN UNIT B-1, SEC 15-14N-11W, BLAINE CTY, GREENFIELD, OK 73043 (NAICS 213112). OSHA activity number 333985638.

Watch SJL Well Service, LLC — free Get an email when a new federal OSHA severe-injury report for SJL Well Service, LLC is published. One employer, no account, unsubscribe in one click.
Site address
CHRISTENSEN UNIT B-1, SEC 15-14N-11W, BLAINE CTY
City
GREENFIELD
State
OK
ZIP
73043
Mailing
PO BOX 655, HENNESSEY, OK 73742
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
213112
Employees
4
Ownership type
A

2 citations on file for this inspection.

1910.132 A

Serious Gravity 5 3 instances 3 exposed
Issued
Abate by
Penalty
Initial $2380.00 · Current $1428.00 Reduced
29 CFR 1910.132(a):     Protective equipment was not used when necessary whenever hazards capable of causing injury and impairment were encountered:    Well head:  On or about April 17, 2012, employees rigging up a service rig in preparation of reworking an injection well were not using personal fall protection equiment.  In the following instances this exposed them to the hazards of falls over 4 feet high:    a)  An employee standing on the stored work floor.    b)  Two employees working on the work floor.    c)  An employee standing on the power tong.
Recent events (2)
  • — I (S) $1428
  • — Z (S) $2380

1910.184 E01

Other-than-serious 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.184(e)(1):     Alloy steel sling(s) did not have permanently affixed durable identification stating size, grade, rated capacity, and reach:    Rig working area:  On or about April 17, 2012, employees rigging up a service rig in preparation for reworking an injection well used the rig winch line to lift rig equipment and structure.  The chain sling attached to the winch line did not have an attached tag.