APPLETON, WI ·
OSHA Inspection: ADVANCE CONSTRUCTION INC
Unprogrammed Other inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Other safety inspection of ADVANCE CONSTRUCTION INC in 1600 N. BALLARD RD, APPLETON, WI 54913 (NAICS 237110). OSHA activity number 334558004.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ADVANCE CONSTRUCTION INC
- Site address
- 1600 N. BALLARD RD
- City
- APPLETON
- State
- WI
- ZIP
- 54913
- Mailing
- 2141 WOODALE AVE, GREEN BAY, WI 54313
What kind of inspection was it?
- Inspection type
- Unprogrammed Other (J)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 237110
- Employees
- 44
- Ownership type
- Private (A)
Citations
10 citations on file for this inspection.
1926.102 A01
- Issued
- Jul 27, 2012
- Abate by
- Aug 3, 2012
- Penalty
- Initial $3,850 · Current $2,000 Reduced
General-duty citation text
29 CFR 1926.102(a)(1): Eye and face protective equipment were not used when machines or operations presented potential eye or face injury from physical, chemical, or radiation agents. Employees using and standing near other employees using a sledge hammer to break a concrete pipe were not wearing safety glasses.
Recent events (2)
- · I (S) $2000
- · Z (S) $3850
1926.251 A01
- Issued
- Jul 27, 2012
- Penalty
- Initial $5,390 · Current $3,000 Reduced
General-duty citation text
29 CFR 1926.251(a)(1): Defective rigging equipment was not removed from service: The hook connected to the John Deere 550LC Excavator was bent and twisted.
Recent events (2)
- · I (S) $3000
- · Z (S) $5390
1926.251 B01
- Issued
- Jul 27, 2012
- Abate by
- Aug 3, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.251(b)(1): Welded alloy steel chain slings did not have permanently affixed durable identification stating size, grade, rated capacity, and sling manufacturer: A) The chain sling being used to lift trench box #50 was missing a tag. B) The chain sling being used to restrain the road plate on the south end of the trench was missing a tag. C) The chain sling laying on the ground on the north side of the trench was missing a tag.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1926.651 I03
- Issued
- Jul 27, 2012
- Abate by
- Aug 17, 2012
- Penalty
- Initial $5,390 · Current $3,000 Reduced
General-duty citation text
29 CFR 1926.651(i)(3): Sidewalks, pavements, or appurtenant structures had been undermined and a support system or another method was not provided to protect employees from the possible collapse of such structures: The pavement on both the east and west sides of the trench had been undermined during excavation.
Recent events (2)
- · I (S) $3000
- · Z (S) $5390
1926.651 J01
- Issued
- Jul 27, 2012
- Abate by
- Aug 17, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.651(j)(1): Adequate protection was not provided to protect employees from loose rock or soil that could pose a hazard by falling or rolling from an excavation face: Loose soil and concrete on the sides and ends of the trench was not removed to protect employees working in the trench and shielding was not sufficient to keep the material from falling into the trench.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1926.652 G01 III
- Issued
- Jul 27, 2012
- Abate by
- Aug 17, 2012
- Penalty
- Initial $5,390 · Current $0 Reduced
General-duty citation text
29 CFR 1926.652(g)(1)(iii): Employees were not protected from the hazard of cave-ins when entering or exiting the area protected by shields: The area in the trench where the ladder was located was not protected from collapse.
Recent events (2)
- · I (S) $0
- · Z (S) $5390
1926.652 G02
- Issued
- Jul 27, 2012
- Abate by
- Aug 17, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.652(g)(2): Excavation of material to a level no greater than 2 feet (.61m) below the bottom of a shield system was allowed when there were indications while the trench was open of a possible loss of soil from behind or below the bottom of the shield. Employees were allowed to work in a trench where the bottom of the trench shield was 10' above the bottom of the trench.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1926.651 K02
- Issued
- Jul 27, 2012
- Abate by
- Aug 17, 2012
- Penalty
- Initial $10,780 · Current $2,500 Reduced
General-duty citation text
29 CFR 1926.651(k)(2): Where the competent person finds evidence of a situation that could result in a possible cave-in, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions, exposed employees shall be removed from the hazardous area until the necessary precautions have been taken to ensure their safety: The competent person did not inspect the trench prior to the start of work when parts of the trench had been open for more than one week. Advance Construction was previously cited for a violation of this Occupational Safety and Health Standard contained in OSHA Inspection #310765979, Citation #2, Item #1, which was affirmed as a Final Order on 5/29/08, with respect to a workplace located on Monroe St, Waterloo, WI 53594.
Recent events (2)
- · I (S) $2500
- · Z (R) $10780
1926.652 A01
- Issued
- Jul 27, 2012
- Abate by
- Aug 17, 2012
- Penalty
- Initial $10,780 · Current $5,000 Reduced
General-duty citation text
29 CFR 1926.652(a)(1): Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652(c). Employees were exposed to cave in hazards from incomplete trench shielding and lack of sloping or benching on an open end. A) Advance Construction was previously cited for a violation of this Occupational Safety and Health Standard or a similar Standard, 1926.652(c), which was contained in OSHA Inspection #315288084, Citation #1, Item #2A, which was affirmed as a Final Order on 7/8/11, with respect to a workplace located at Miltary and Velp Aves, Green Bay, WI 54303. B) Advance Construction was previously cited for a violation of this Occupational Safety and Health Standard which was contained in OSHA Inspection #310765979, Citation #2, Item #2, and affirmed as a Final Order on 5/29/08, with respect to a workplace located on Monroe St, Waterloo, WI 53594.
Recent events (2)
- · I (S) $5000
- · Z (R) $10780
1926.1053 B04
- Issued
- Jul 27, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1053(b)(4): Ladder(s) were used for purposes other than the purpose for which they were designed: The top half of an extension ladder was used to access the trench.
Recent events (2)
- · I (O) $0
- · Z (O) $0
More inspections at Advance Construction INC
View Advance Construction INC's full OSHA safety record →
More inspections in this industry (NAICS 237110)
More inspections in WI
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 334558004.