PHILADELPHIA, PA —
OSHA Inspection: ROMERO CONSTRUCTION
Special Programs inspection · Safety discipline
At a glance
On , OSHA opened a special Programs safety inspection of ROMERO CONSTRUCTION in 1600 CAMAC ST, PHILADELPHIA, PA 19148 (NAICS 238140). OSHA activity number 334582749.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ROMERO CONSTRUCTION
- Site address
- 1600 CAMAC ST
- City
- PHILADELPHIA
- State
- PA
- ZIP
- 19148
- Mailing
- 1139 ELLSWORTH ST. FL - 2, PHILADELPHIA, PA 19147
What kind of inspection was it?
- Inspection type
- Special Programs (K)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 4
- Ownership type
- A
Citations
6 citations on file for this inspection.
1926.451 B01
- Issued
- Jul 10, 2012
- Abate by
- Jul 11, 2012
- Penalty
- Initial $2,000 · Current $2,000
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a- SE Corner of 1600 S. Camac St, Tubular Welded Frame Scaffold-Employees were exposed to fall hazards of approximately 19 to 24 feet where the active work platforms were not fully planked between the front uprights and the back guardrail supports. Observed 6/5/2012 NOTE: Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $2000
1926.451 C01
- Issued
- Jul 10, 2012
- Abate by
- Jul 11, 2012
- Penalty
- Initial $1,600 · Current $1,600
General-duty citation text
29 CFR 1926.451(c)(1): Supported scaffolds with a height to base width (including outrigger supports, if used) ratio of more than four to one (4:1) were not restrained from tipping by guying, tying, bracing, or equivalent means, as set forth in subparagraphs (i) - (iii) of this paragraph. a- SE Corner of 1600 S. Camac St, Tubular Welded Frame Scaffold- Employees were exposed to fall hazards of approximately 24 feet where the scaffold was built to an elevation greater than the maximum allowable 4:1 height to base ratio with no guying, tying or bracing installed. The scaffold was 5 feet in depth. Observed 6/5/2012. NOTE: Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $1600
1926.451 F06
- Issued
- Jul 10, 2012
- Abate by
- Jul 11, 2012
- Penalty
- Initial $1,600 · Current $1,600
General-duty citation text
29 CFR 1926.451(f)(6): Scaffolds were erected, used, dismantled, altered, or moved such that they, or any conductive material handled on them, could have come closer than the minimum distances established for specific voltages as set forth in the table in subparagraph (f)(6): a) SE Corner of 1600 S. Camac St, Tubular Welded Frame Scaffold- The scaffold was built around an energized (240 VAC) Tri-plex type power line feeding the structure. The insulated power line was within inches of the scaffold with employees having to step over it. The insulated power line was required to be at least three (3) feet away from the scaffold. Observed 6/5/2012. NOTE: Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $1600
1926.451 F07
- Issued
- Jul 10, 2012
- Abate by
- Jul 11, 2012
- Penalty
- Initial $2,000 · Current $2,000
General-duty citation text
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration: a) SE Corner of 1600 S. Camac St, Tubular Welded Frame and Ladder Jack Scaffolds- The scaffolds were not erected under the supervision of a competent person. Numerous deficiencies such as, but not limited to lack of fall protection, lack of adequate planking, power lines not protected, and lack of guying, tying, and/or bracing existed with the scaffolds. Observed 6/5/2012. NOTE: Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $2000
1926.451 G01 I
- Issued
- Jul 10, 2012
- Abate by
- Jul 11, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(g)(1)(i): Each employee on a boatswains' chair, catenary scaffold, float scaffold, needle beam scaffold, or ladder jack scaffold was not protected by a personal fall arrest system: a) SE Corner of 1600 S. Camac St, Ladder Jack Scaffold- An employee was exposed to a fall hazard of approximately 20 feet while working from the ladder jack scaffold and not utilizing the required personal fall arrest system. Observed 6/5/2012. NOTE: Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $0
1926.451 G01 VII
- Issued
- Jul 10, 2012
- Abate by
- Jul 11, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section. a) SE Corner of 1600 S. Camac St, Tubular Welded Frame Scaffold- Employees were exposed to fall hazards of up to approximately 25 feet while working from the frame scaffold where appropriate fall protection was not provided. Observed 6/5/2012. NOTE: Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $0
More inspections at Romero Construction
View Romero Construction's full OSHA safety record →
More inspections in this industry (NAICS 238140)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 334582749.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.