GRANDVIEW HEIGHTS, OH —
OSHA Inspection: RVM CONSTRUCTION
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of RVM CONSTRUCTION in 825, 875 BURR AVE., GRANDVIEW HEIGHTS, OH 43212 (NAICS 238140). OSHA activity number 334599966.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- RVM CONSTRUCTION
- Site address
- 825, 875 BURR AVE.
- City
- GRANDVIEW HEIGHTS
- State
- OH
- ZIP
- 43212
- Mailing
- 201 SOUTH BROAD STREET, LANCASTER, OH 43130
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 30
- Ownership type
- A
Citations
2 citations on file for this inspection.
1926.451 F13
- Issued
- Jul 16, 2012
- Abate by
- Jul 23, 2012
- Penalty
- Initial $3,500 · Current $2,100 Reduced
General-duty citation text
29 CFR 1926.451(f)(13): Debris shall not be allowed to accumulate on platforms. a. On the northwest side of Building B where masons were laying brick from a Hydromobile scaffold, the platform where the employees were working had large amounts of brick, trash, equipment such as buckets which were not needed accumulated on the platform thereby exposing the employees to a trip fall hazard.
Recent events (2)
- — I (S) $2100
- — Z (S) $3500
1926.451 G04 I
- Issued
- Jul 16, 2012
- Penalty
- Initial $4,900 · Current $2,940 Reduced
General-duty citation text
29 CFR 1926.451(g)(4)(i): Guardrail systems shall be installed along all open sides and ends of platforms. Guardrail systems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews. a. On the orthwest corner of Building B whre bricks were being laid, the guardrail was missing from the back of the Hydromobile Scaffold thereby exposing employees to a 20 foot fall. b. On the southwest side of the hydromobile scaffold where employees were laying bricks, their was an 11 inch opening at the front side of the platform thereby exposing employees to a 20 foot fall hazard.
Recent events (2)
- — I (S) $2940
- — Z (S) $4900
More inspections at RVM Construction
View RVM Construction's full OSHA safety record →
More inspections in this industry (NAICS 238140)
More inspections in OH
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 334599966.