BATH, NH ·
OSHA Inspection: H.G. WOOD INDUSTRIES, LLC
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of H.G. WOOD INDUSTRIES, LLC in 32 SAWMILL RD., BATH, NH 03740 (NAICS 321113). OSHA activity number 335261608.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- H.G. WOOD INDUSTRIES, LLC
- Site address
- 32 SAWMILL RD.
- City
- BATH
- State
- NH
- ZIP
- 03740
- Mailing
- PO BOX 148, BATH, NH 03740
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Health
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 321113
- Employees
- 33
- Ownership type
- Private (A)
Citations
13 citations on file for this inspection.
1910.22 A01
- Issued
- Oct 25, 2012
- Abate by
- Nov 16, 2012
- Penalty
- Initial $3,500 · Current $1,750 Reduced
M102
General-duty citation text
29 CFR 1910.22(a)(1): All places of employment, passageways, storerooms or service rooms were not kept clean and orderly or in a sanitary condition: a. Planing Mill, Trim Saw - On 08/24/2012, accumulations of explosive wood dust were not adequately controlled. Accumulations were observed on the trim saw enclosure, overhead lighting, cable tray, rafters, & crossmembers on the walls. The wood dust on the trimsaw enclosure was approximately 0.5 - 4 inches deep.
Recent events (2)
- · I (S) $1750
- · Z (S) $3500
1910.265 C20 II
- Issued
- Oct 25, 2012
- Abate by
- Dec 10, 2012
- Penalty
- Initial $0 · Current $0
M102
General-duty citation text
29 CFR 1910.265(c)(20)(ii): Machine(s) that created dust, shavings, chips, or slivers during a period of time equal to or greater than one-fourth of the working day were not equipped with collecting system(s) of sufficient strength and capacity to enable the removal of refuse from points of operation and immediate vicinities of machines and work areas: a. Planing Mill, Trim Saw - On 08/24/2012 the trim saw line was not equipped with a collection system of sufficient strength to prevent the escape of sawdust from the saw enclosure. Sawdust had accumulated on top of the enclosure at depths of about 0.5 - 4 inches. b. Sawmill, Brewer Resaw - As of 08/24/2012 the collection system for the Brewer resaw was not operating with sufficient strength and/or capacity to remove sawdust generated by the resaw. Dust had accumulated to approximately 0.25 inches in 2 hours on the floor. Sawdust accumulations generated over several days up to about 6 inches were found on the machine frame.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1910.132 A
- Issued
- Oct 25, 2012
- Abate by
- Nov 16, 2012
- Penalty
- Initial $2,100 · Current $1,050 Reduced
General-duty citation text
29 CFR 1910.132(a): Protective equipment was not used as necessary whenever hazards capable of causing injury and impairment were encountered: a. Sawmill, Cant Deck - As of 08/24/2012, appropriate head protection was not used by the Brewer resaw operator who could be struck by cants being transported to the resaw while he was turning boards on the lumber deck.
Recent events (2)
- · I (S) $1050
- · Z (S) $2100
1910.134 F02
- Issued
- Oct 25, 2012
- Abate by
- Nov 24, 2012
- Penalty
- Initial $2,100 · Current $1,050 Reduced
General-duty citation text
29 CFR 1910.134(f)(2): Employee(s) using a tight-fitting facepiece respirator were not annually fit tested: a. Wood Boiler Room - Two employees, who use tight fitting full facepiece respirators, had not been fit tested since 03/26/2010. During the time period between 05/10/2012 to 05/17/2012, the employees performed jobs, such as the clean-out of the wood fired boiler and inspection of the silo, both of which required the use of these respirators.
Recent events (2)
- · I (S) $1050
- · Z (S) $2100
1910.147 C05 II D
- Issued
- Oct 25, 2012
- Penalty
- Initial $3,500 · Current $0 Reduced
General-duty citation text
29 CFR 1910.147(c)(5)(ii)(D): Lockout devices and tagout devices did not indicate the identity of the employee applying the device(s): a. Debarker - On 07/16/12 the lockout device did not indicate the identity of the employee who applied the device in order to work on the drive mechanism for the log deck.
Recent events (2)
- · I (S) $0
- · Z (S) $3500
1910.147 F03 II D
- Issued
- Oct 25, 2012
- Penalty
- Initial $3,500 · Current $1,750 Reduced
General-duty citation text
29 CFR 1910.147(f)(3)(ii)(D): Each authorized employee did not affix a personal lockout or tagout device to the group lockout device before working on the machine or equipment: a. Debarker - On 07/16/12 two employees did not apply personal lockout devices before starting work on the chain drive under the log deck.
Recent events (2)
- · I (S) $1750
- · Z (S) $3500
1910.147 C06 I
- Issued
- Oct 25, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a. Establishment - As of 08/24/12, audits of the energy control procedures had not been conducted.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1910.219 C04 I
- Issued
- Oct 25, 2012
- Abate by
- Nov 16, 2012
- Penalty
- Initial $2,800 · Current $700 Reduced
General-duty citation text
29 CFR 1910.219(c)(4)(i): Unguarded projecting shaft end(s) did not present a smooth edge and end and projected more than one half the diameter of the shaft: a. Sawmill, Green chain lumber deck - On 08/24/2012 the end of a 2 inch shaft did not have a smooth edge and was 3.5 times the permitted length of 1 inch.
Recent events (2)
- · I (O) $700
- · Z (S) $2800
1910.242 B
- Issued
- Oct 25, 2012
- Penalty
- Initial $2,800 · Current $1,400 Reduced
General-duty citation text
29 CFR 1910.242(b): Compressed air used for cleaning purposes was not reduced to less than 30 p.s.i.: a. Garage - On 07/16/2012 a compressed air gun used for cleaning was not regulated to less than 30 p.s.i. It was operating at compressor pressure of approximately 115 p.s.i. b. Compressor room - 0n 07/17/2012 a wand that connected directly to the air hose was not regulated to less than 30 p.s.i.
Recent events (2)
- · I (S) $1400
- · Z (S) $2800
1910.265 C04 II
- Issued
- Oct 25, 2012
- Abate by
- Nov 24, 2012
- Penalty
- Initial $2,100 · Current $700 Reduced
General-duty citation text
29 CFR 1910.265(c)(4)(ii): Walkway(s) were not evenly floored: a. Resaw - As of 08/24/2012, a section of the walkways on either side of the Cant/Lumber conveyor decks were unevenly floored. There was a change in the elevation of the walkway. The sections had a step down onto a side-sloped surface. The slopes were approximately 10 & 15 degrees toward the wall.
Recent events (2)
- · I (O) $700
- · Z (S) $2100
1910.303 B07 IV
- Issued
- Oct 25, 2012
- Abate by
- Nov 16, 2012
- Penalty
- Initial $2,800 · Current $1,400 Reduced
General-duty citation text
29 CFR 1910.303(b)(7)(iv): There were damaged parts that could adversely affect safe operation or mechanical strength of the equipment, such as parts that were broken, bent, cut, or deteriorated by corrosion, chemical action, or overheating: a. Sawmill, under the metal detector for the chipper - On 08/24/2012 the cover on an electrical junction box had been punctured permitting entry of sawdust through the opening. Additionally, the conduit running into the side of the junction box had loosened creating a space which also would allow the entry of sawdust. b. Sawmill, pit below trim saw takeoff - On 07/16/2012 the corners of the cover on an electrical junction box had been bent back and the sealing layer had loosened.
Recent events (2)
- · I (S) $1400
- · Z (S) $2800
1910.24 I
- Issued
- Oct 25, 2012
- Abate by
- Dec 10, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.24(i): The vertical clearance above any stair tread to an overhead obstruction was not at least 7 feet measured from the leading edge of the tread. a. Sawmill Resaw - As of 08/24/2012, a 7 foot clearance was not maintaiined between the stairs which accessed the walkway over the Cant/Lumber decks, and a set of electrical conduits overhead.
Recent events (2)
- · I (O) $0
- · Z (O) $0
1910.303 G01 II
- Issued
- Oct 25, 2012
- Abate by
- Nov 16, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.303(g)(1)(ii): The required working space about electric equipment rated 600 volts, nominal, or less to ground, was used for storage: a. Planing Mill Electrical Room - On and about 08/24/2012, a variety of tools, work tables, and miscellaneous materials blocked ready access to electrical panels up to 480 volts. b. Sawmill Compressor Room - On and about 08/24/2012, materials were stored around and under three electrical panels and on top of a transformer.
Recent events (2)
- · I (O) $0
- · Z (O) $0
More inspections at H.G. Wood Industries, LLC
View H.G. Wood Industries, LLC's full OSHA safety record →
More inspections in this industry (NAICS 321113)
More inspections in NH
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 335261608.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.