OSHA Inspection: TCH MASONRY, INC.

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of TCH MASONRY, INC. in 2609 W. BELMONT AVE., CHICAGO, IL 60618 (NAICS 238140). OSHA activity number 335306593.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch TCH Masonry, INC. for free Get an email when a new federal OSHA severe-injury report for TCH Masonry, INC. is published. One employer, no account, unsubscribe in one click.
Establishment
TCH MASONRY, INC.
Site address
2609 W. BELMONT AVE.
City
CHICAGO
State
IL
ZIP
60618
Mailing
1210 E. PADDOCK DR., PALATINE, IL 60074
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
9
Ownership type
Private (A)

4 citations on file for this inspection.

1910.1200 E01

Serious Gravity 1 1 instance 9 exposed
Issued
Sep 11, 2012
Abate by
Oct 24, 2012
Penalty
Initial $1,200 · Current $1,200

Hazardous substances 05050577

Construction Reference: 1926.59  NOTE: The Requirements applicable to construction work under this section are identical to those set forth at � 1910.1200 of this chapter.    29 CFR 1910.1200(e)(1):     The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met:    a) The employer did not develop or implement a written hazard communication program in accordance with 29 CFR 1910.1200(e)(1) that would describe or include at least the following:    1) Requirement for labeling of containers of hazardous chemicals;  2) Material safety data sheet availability;  3) Training of employees;  4) A complete list of hazardous chemicals known to be in the workplace;  5) Methods to inform employees of the hazards on non-routine tasks; and  6) Methods to inform other employer(s) of material safety data sheet availability; the labeling system; and any precautionary measures to protect employees.    On or about 19 July 2012, the employer did not develop a written hazard communication program.   Workers were exposed to hazardous chemicals including but not limited to alkaline wet cement [contains Portland Cement and Limestone (Calcium Carbonate), pH 12-13] while pouring concrete on the rooftop deck.  The employer did not develop, implement and/or maintain a written hazard communication program addressing the health hazards of hazardous chemicals present in the workspace.
Recent events (1)
  • · Z (S) $1200

1910.1200 H01

Serious Gravity 1 1 instance 9 exposed
Issued
Sep 11, 2012
Abate by
Oct 24, 2012
Penalty
Initial $0 · Current $0

Hazardous substances 05050577

Construction Reference: 1926.59  NOTE: The Requirements applicable to construction work under this section are identical to those set forth at  1910.1200 of this chapter.      29 CFR 1910.1200(h)(1):     Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area:     a) On or about 19 July 2012, the employer did not provide the employee(s) with training regarding the hazards of the chemicals present in the work area.   Workers were exposed to hazardous chemicals including but not limited to alkaline wet cement [contains Portland Cement and Limestone (Calcium Carbonate), pH 12-13] while pouring concrete on the rooftop deck.
Recent events (1)
  • · Z (S) $0

1926.95 A

Other-than-serious 4 instances 9 exposed
Issued
Sep 11, 2012
Abate by
Sep 18, 2012
Penalty
Initial $400 · Current $400

Hazardous substances 05050577

29 CFR 1926.95(a):     Protective equipment, including personal protective equipment for eyes, face, head, and extremities, protective clothing, respiratory devices, and protective shields and barriers, was not provided, used, and maintained in a sanitary and reliable condition wherever it was necessary by reason of hazards of processes or environment, chemical hazards, radiological hazards, or mechanical irritants encountered in a manner capable of causing injury or impairment in the function of any part of the body through absorption, inhalation or physical contact:    a) On or about 19 July 2012, the employer did not ensure that workers pouring concrete on the rooftop deck used protective equipment including but not limited to: gloves and/or protective clothing (long pants and long-sleeved shirts) to protect them against hazardous chemicals including but not limited to alkaline wet cement [contains Portland Cement and Limestone (Calcium Carbonate), pH 12-13].     Nine workers were observed spreading concrete using squeegees on the rooftop.    Instance # 1: Three employees did not wear gloves.   Instance # 2: Two employees did not wear long pants.   Instance # 3: Nine employees did not wear long sleeves
Recent events (1)
  • · Z (O) $400

1926.102 A01

Other-than-serious 1 instance 9 exposed
Issued
Sep 11, 2012
Abate by
Sep 18, 2012
Penalty
Initial $400 · Current $400

Hazardous substances 05050577

29 CFR 1926.102(a)(1):     Eye and face protective equipment were not used when machines or operations presented potential eye or face injury from physical, chemical, or radiation agents.    a) On or about 19 July 2012, the employer did not ensure that workers pouring concrete on the rooftop deck used eye protection (safety glasses) to protect them against splatter of wet cement [contains Portland Cement and Limestone (Calcium Carbonate), pH 12-13].  Nine workers were observed spreading concrete using squeegees on the rooftop and or handling the hose from the cement pump truck and none of them was observed wearing safety glasses.
Recent events (1)
  • · Z (O) $400

View TCH Masonry, INC.'s full OSHA safety record →