Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: P-AMERICAS LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of P-AMERICAS LLC in 526 MILBURN AVE., DAYTON, OH 45404 (NAICS 312111). OSHA activity number 335528006.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch P-Americas LLC — free Get an email when a new federal OSHA severe-injury report for P-Americas LLC is published. One employer, no account, unsubscribe in one click.
Establishment
P-AMERICAS LLC
Site address
526 MILBURN AVE.
City
DAYTON
State
OH
ZIP
45404
Mailing
526 MILBURN AVE., DAYTON, OH 45404
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
312111
Employees
270
Ownership type
A

6 citations on file for this inspection.

1910.23 A08

Serious Gravity 1 1 instance 1 exposed
Issued
Dec 21, 2012
Abate by
Jan 18, 2013
Penalty
Initial $2,550 · Current $1,785 Reduced
29 CFR 1910.23(a)(8):  Every floor hole into which persons can accidentally walk shall be guarded:    (a)  Employees working in the loading dock area at 111 Front Street were exposed to a 6 inch by 7 inch hole as the result of a damaged drainage grate.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (2)
  • — I (S) $1785
  • — Z (S) $2550

1910.147 C05 I

Serious Gravity 5 3 instances 2 exposed
Issued
Dec 21, 2012
Abate by
Jan 18, 2013
Penalty
Initial $4,250 · Current $2,975 Reduced
29 CFR 1910.147(c)(5)(i):  Locks, tags, chains, wedges, key blocks, adapter pins, self-locking fasteners, or other hardware shall be provided by the employer for isolating, securing or blocking of machines or equipment from energy sources:    (a)  Employees were not provided with locks to attach to the energy isolating devices prior to retrieving fallen boxes and cans from under the pallet hoist on the Alvey Palletizer.    (b)  Employees were not provided with locks to attach to the energy isolating devices prior to replacing the plastic shrink wrap on Muller Pallet Stretch Wrapper on the Alvey Palletizer and on the Lantech Stretch Wrapper on the Wyard Palletizer.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (2)
  • — I (S) $2975
  • — Z (S) $4250

1910.147 C07 I

Serious Gravity 5 3 instances 2 exposed
Issued
Dec 21, 2012
Abate by
Jan 18, 2013
Penalty
Initial $4,250 · Current $2,975 Reduced
29 CFR 1910.147(c)(7)(i):  The employer shall provide training to ensure that the purpose and function of the energy control program are understood by employees and that the knowledge and skills required for the safe application, usage, and removal of the energy controls are acquired by employees. The training shall include the following:    (a)  The training on the energy control program was inadequate, in that employees thought it was acceptable to retrieve fallen boxes and cans from under the pallet hoist on the Alvey Palletizer, without first locking out the machine.    (b)  The training on the energy control program was inadequate, in that employees thought it was acceptable to replace the plastic shrink wrap on Muller Pallet Stretch Wrapper on the Alvey Palletizer, and on the Lantech Stretch Wrapper on the Wyard Palletizer, without first locking out the machines.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (2)
  • — I (S) $2975
  • — Z (S) $4250

1910.147 D03

Serious Gravity 5 3 instances 2 exposed
Issued
Dec 21, 2012
Abate by
Jan 18, 2013
Penalty
Initial $4,250 · Current $2,975 Reduced
29 CFR 1910.147(d)(3): Machine or equipment isolation. All energy isolating devices that are needed to control the energy to the machine or equipment shall be physically located and operated in such a manner as to isolate the machine or equipment from the energy source(s):    (a)  Employees retrieved fallen boxes and cans from under the pallet hoist on the Alvey Palletizer, without first isolating the machine from the energy source(s).     (b)  Employees replaced the plastic shrink wrap on the Muller Pallet Stretch Wrapper (Alvey Palletizer), and on the Lantech Stretch Wrapper (Wyard Palletizer), without first isolating the machines from their energy sources(s).      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (2)
  • — I (S) $2975
  • — Z (S) $4250

1910.147 D04 I

Serious Gravity 5 3 instances 2 exposed
Issued
Dec 21, 2012
Abate by
Jan 18, 2013
Penalty
Initial $0 · Current $0
29 CFR 1910.147(d)(4)(i): Lockout or tagout devices shall be affixed to each energy isolating device by authorized employees:    (a)  Employees retrieved fallen boxes and cans from under the pallet hoist on the Alvey Palletizer, without first affixing a lockout device to the energy isolating devices.     (b)  Employees replaced the plastic shrink wrap on the Muller Pallet Stretch Wrapper (Alvey Palletizer), and on the Lantech Stretch Wrapper (Wyard Palletizer), without first affixing a lockout device to the energy isolating devices.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.212 A01

Serious Gravity 5 1 instance 1 exposed
Issued
Dec 21, 2012
Abate by
Jan 18, 2013
Penalty
Initial $4,250 · Current $2,975 Reduced
29 CFR 1910.212(a)(1):  Types of guarding. One or more methods of machine guarding shall be provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks. Examples of guarding methods are-barrier guards, two-hand tripping devices,electronic safety devices, etc.:    (a)  The blade on the Dake Horizontal Band Saw was not properly guarded, in that there were 11 inches of unguarded blade.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (2)
  • — I (S) $2975
  • — Z (S) $4250

View P-Americas LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 335528006.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.