DACULA, GA —
OSHA Inspection: FULL SERVICE MASONRY, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of FULL SERVICE MASONRY, INC. in 1261 GRANT MILL RUN, DACULA, GA 30019 (NAICS 444190). OSHA activity number 335904611.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- FULL SERVICE MASONRY, INC.
- Site address
- 1261 GRANT MILL RUN
- City
- DACULA
- State
- GA
- ZIP
- 30019
- Mailing
- 5817 COLES COURT, BUFORD, GA 30518
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 444190
- Employees
- 5
- Ownership type
- A
Citations
9 citations on file for this inspection.
1926.100 A
- Issued
- Oct 17, 2012
- Abate by
- Nov 7, 2012
- Penalty
- Initial $1,200 · Current $600 Reduced
General-duty citation text
29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets: On or about August 22, 2012, at 1261 Grant Mill Run, Dacula, Georgia: An employee engaged in brick masonry work was exposed to struck-by hazards from the tools and materials falling from the employees working above him on the work platform of a tubular welded frame scaffold while he delivered masonry cement to them. The employee was not wearing a hard hat.
Recent events (2)
- — I (S) $600
- — Z (S) $1200
1926.451 H02 II
- Issued
- Oct 17, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(h)(2)(ii): A toeboard was not erected along the edge of platforms more than 10 feet (3.1 m) above lower levels for a distance sufficient to protect employees below: On or about August 22, 2012, at 1261 Grant Mill Run, Dacula, Georgia: The working level of the scaffold where bricks were present did not have toe boards installed to prevent employees working below from being struck.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.102 A01
- Issued
- Oct 17, 2012
- Abate by
- Nov 7, 2012
- Penalty
- Initial $1,200 · Current $600 Reduced
General-duty citation text
29 CFR 1926.102(a)(1): Eye and face protective equipment were not used when machines or operations presented potential eye or face injury from physical, chemical, or radiation agents. On or about August 22, 2012, at 1261 Grant Mill Run, Dacula, Georgia: Employees cutting bricks with trowels did not have eye protection.
Recent events (2)
- — I (S) $600
- — Z (S) $1200
1926.300 B02
- Issued
- Oct 17, 2012
- Abate by
- Nov 7, 2012
- Penalty
- Initial $2,000 · Current $1,000 Reduced
General-duty citation text
29 CFR 1926.300(b)(2): Moving part(s) of equipment exposed to contact by employees or which otherwise created a hazard, were not guarded: On or about August 22, 2012, at 1261 Grant Mill Run, Dacula, Georgia: An employee performing brick masonry work was exposed to caught-between hazards while operating the cement mixer with the cover up exposing the employee to the rotating drive belt and pulley of the motor.
Recent events (2)
- — I (S) $1000
- — Z (S) $2000
1926.451 G04 I
- Issued
- Oct 17, 2012
- Abate by
- Nov 7, 2012
- Penalty
- Initial $2,000 · Current $1,000 Reduced
General-duty citation text
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms. On or about August 22, 2012, at 1261Grant Mill Run, Dacula, Georgia: Employees performing brick masonry from the work platform of a tubular welded frame scaffold were exposed to a fall hazard of approximately 14.2-feet when the work platform of the scaffold did not have end rails installed.
Recent events (2)
- — I (S) $1000
- — Z (S) $2000
1910.134 C01
- Issued
- Oct 17, 2012
- Abate by
- Nov 7, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.134(c)(1): A written respiratory protection program that included the provisions in 29 CFR 1910.134(c)(1)(i) - (ix) with worksite specific procedures was not established and implemented for required respirator use: (Construction Reference 1926.103) On or about August 22, 2012, at 1261 Grant Mill Run, Dacula, Georgia: Two employees performing brick masonry work were exposed to lung irritation when they used a cement mixer to mix COOSA Type N Buff Masonry Cement without using a respirator.
Recent events (2)
- — I (O) $0
- — Z (O) $0
1910.1200 E01
- Issued
- Oct 17, 2012
- Abate by
- Nov 16, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.1200(e)(1): Employer had not developed or implemented a written hazard communication program which at included the requirements outlined in 29 CFR 1910.1200(e)(1)(i) and (e)(1)(ii): (Construction Reference: 1926.59) On or about August 22, 2012, at 1261 Grant Mill Run, Dacula, Georgia: Where employees were using chemicals, which include but is not limited to Coosa Type N Buff Masonry Cement. The employer did not develop a hazard communication program.
Recent events (2)
- — I (O) $0
- — Z (O) $0
1910.1200 G08
- Issued
- Oct 17, 2012
- Abate by
- Nov 7, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.1200(g)(8): The employer did not ensure that material safety data sheets were readily accessible to the employees in their work area during each work shift: (Construction Reference: 1926.59) On or about August 22, 2012, at 1261 Grant Mill Run, Dacula, Georgia: Material Safety Data Sheets were not provided for employees using chemicals, which include but were not limited to Coosa Type N Buff Masonry Cement which contains silica and Portland cement.
Recent events (2)
- — I (O) $0
- — Z (O) $0
1910.1200 H01
- Issued
- Oct 17, 2012
- Abate by
- Nov 16, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area: (Construction Reference: 1926.59) On or about August 22, 2012, at 1261 Grant Mill Run, Dacula, Georgia: Training had not been provided for employees working with chemicals, which included but were not limited to Coosa Type N Buff Masonry Cement which contains silica and Portland Cement.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at Full Service Masonry, INC.
View Full Service Masonry, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 444190)
More inspections in GA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 335904611.