OSHA Inspection: J.N.P. CONSTRUCTION, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of J.N.P. CONSTRUCTION, INC. in 215 E. DUNDEE ROAD, WHEELING, IL 60090 (NAICS 238130). OSHA activity number 336010988.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch J.N.P. Construction, INC. — free Get an email when a new federal OSHA severe-injury report for J.N.P. Construction, INC. is published. One employer, no account, unsubscribe in one click.
Site address
215 E. DUNDEE ROAD
City
WHEELING
State
IL
ZIP
60090
Mailing
7008 O'CONNELL DRIVE UNIT 302, CHICAGO RIDGE, IL 60415
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238130
Employees
3
Ownership type
A

4 citations on file for this inspection.

1926.404 B01 II

Serious Gravity 5 1 instance 3 exposed
Issued
Sep 20, 2012
Abate by
Sep 27, 2012
Penalty
Initial $1,600 · Current $900 Reduced
29 CFR 1926.404(b)(1)(ii): All 120-volt, single-phase, 15 and 20 ampere receptacle outlets which were not a part of the permanent wiring of the building or structure and which were used by employees did not have approved ground-fault circuit interrupters for personnel protection (NOTE: Receptacles on a two-wire, single-phase portable or vehicle-mounted  generator not more than 5kW, where the circuit conductors of the generator are insulated from the generator frame and all other grounded surfaces, need not be protected with ground-fault circuit interrupters.):    a) Employees were using a 5000 watt Honda Model EG 5000 gas powered generator to provide electric power at the site where the outlets on the generator were not equipped with ground-fault circuit interrupters.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $900
  • — Z (S) $1600

1926.404 F06

Serious Gravity 5 1 instance 1 exposed
Issued
Sep 20, 2012
Abate by
Sep 27, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.404(f)(6): The path to ground from circuits, equipment, or enclosures was not permanent and continuous:    a) The employer provided for employee use at the job site a Skilsaw Model SHD77M 7 1/4" worm drive saw that did not have a grounding pin.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.416 E01

Serious Gravity 5 1 instance 1 exposed
Issued
Sep 20, 2012
Abate by
Sep 27, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.416(e)(1):  Worn or frayed electric cords or cables were used:      a) The insulation on the flexible cord on the Skilsaw Model SHD77M 7 1/4" worm drive saw being used by the employee to cut OSB plywood and dimension lumber was worn in the middle of the cord as evidenced by the white tape covering the  conductors.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 C02 IV

Serious Gravity 10 1 instance 1 exposed
Issued
Sep 20, 2012
Abate by
Sep 27, 2012
Penalty
Initial $2,800 · Current $1,500 Reduced
29 CFR 1926.451(c)(2)(iv): Front-end loaders and similar pieces of equipment used to support scaffold platforms were not specifically designed by the manufacturer for such use:    a) The employer provided a JCB Loadall Model 506C rough terrain forklift to elevate a wood platform for employee use and the manufacturer did not design the equipment for such use. The platform was not approved or properly secured.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $1500
  • — Z (S) $2800

View J.N.P. Construction, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 336010988.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.