Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: GCCS, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of GCCS, INC. in 71 CORP LN, CARTHAGE, TN 37030 (NAICS 237990). OSHA activity number 336809389.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Gccs, INC. — free Get an email when a new federal OSHA severe-injury report for Gccs, INC. is published. One employer, no account, unsubscribe in one click.
Establishment
GCCS, INC.
Site address
71 CORP LN
City
CARTHAGE
State
TN
ZIP
37030
Mailing
811 SOUTH 2ND ST, LOUISVILLE, KY 40203
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
237990
Employees
3
Ownership type
A

2 citations on file for this inspection.

1910.1200 E01 I

Other-than-serious 1 instance 10 exposed
Issued
Oct 16, 2012
Abate by
Nov 6, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(e)(1)(i):     The written hazard communication program did not include a list of the hazardous chemicals known to be present, using an identity that was referenced on the appropriate material safety data sheet:    (a) Bluff Stabilization, Cordell Hull - On or about 10/11/12, a chemical inventory list was not included with the MSDS binder.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (O) $0

1910.1200 G01

Other-than-serious 2 instances 10 exposed
Issued
Oct 16, 2012
Abate by
Nov 6, 2012
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(g)(1):     The employer did not have a material safety data sheet for each hazardous chemical in use:    (a) Bluff Stabilization, Cordell Hull - On or about 10/11/12, the employer did not maintain MSDSs for all chemicals on-site including PVC glue and wind shield cleaner.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (O) $0

View Gccs, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 336809389.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.